← Back
Miscellaneous warehouse
26-15 JACKSON AVENUE
QUEENS · Long Island City-Hunters Point · BIN 4005144
💬 Discuss this project
1941Year Built
1Stories
E9Building Class
M1-6/R10Zoning
7,333 sfGross Floor Area
1Units
0 Open Violations
Miscellaneous warehouse · Owner of record: 26-15 JACKSON, LLC · 8,202 sf lot · 0.89 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Roof44p · 3 filings · 20 docs
Floor 146p · 2 filings · 20 docs
Cellar44p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKROSE DEVELOPMENT7507/08/2026
43-25 HUNTER STREET603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SRA ARCHITECTURE + ENGINEERING, PC608/07/2026
HATFIELD GROUP ENGINEERING706/30/2025
WSP107/02/2024
VAMOS ARCHITECTS303/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SRA ARCHITECTURE + ENGINEERING1403/21/2026
ANGELA RIVERA203/21/2026
JMV CONSULTING ENGINEERING, P.C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LITHOS CONSTR SOLUTI INCGeneral Contractor1203/21/2026
DELTA PROJECTS GC LLCGeneral Contractor807/08/2026
WATER DYNAMIC P & H CORPPlumbing207/08/2026
ANESIS SERVICES CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA INSPECTIONS34611008/07/2026
SE INSPECTIONS7486806/30/2025
CROSSCHECK INSPECTION SER544307/02/2024
Building Lifecycle
All (170)Filed (17)Permit Issued (14)Signed Off (10)Violation (27)Inspection (10)Objection (62)Special Inspection (30)
08/07/2026
Filed — Alteration CO
NEW MECHANICAL AIR CONDITIONING AND VENTILATION FOR NEW RESTAURANT. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01097998-P7
04/21/2026
Special inspection requirement — Interior lighting power
Adrian Figueroa
04/21/2026
Special inspection requirement — Fenestration air leakage
Adrian Figueroa
04/21/2026
Special inspection requirement — Fenestration areas
Adrian Figueroa
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Adrian Figueroa
04/21/2026
Special inspection requirement — Lighting controls
Adrian Figueroa
04/21/2026
Special inspection requirement — Air barrier - visual inspection
Adrian Figueroa
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Adrian Figueroa
04/21/2026
Special inspection requirement — Air barrier continuity plan testing
Adrian Figueroa
04/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Adrian Figueroa
04/21/2026
Special inspection requirement — Exterior lighting power
Adrian Figueroa
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Adrian Figueroa
04/21/2026
Special inspection requirement — Air barrier — testing
Adrian Figueroa
04/07/2026
Filed — Alteration CO
NEW MECHANICAL AIR CONDITIONING AND VENTILATION FOR NEW RESTAURANT. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01097998-P6
04/06/2026
Special inspection requirement — Fenestration air leakage
Adrian Figueroa
04/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Adrian Figueroa
04/06/2026
Special inspection requirement — Air barrier — testing
Adrian Figueroa
04/06/2026
Special inspection requirement — Interior lighting power
Adrian Figueroa
04/06/2026
Special inspection requirement — Exterior lighting power
Adrian Figueroa
04/06/2026
Special inspection requirement — Lighting controls
Adrian Figueroa
04/06/2026
Special inspection requirement — Fenestration areas
Adrian Figueroa
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Adrian Figueroa
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Adrian Figueroa
04/06/2026
Special inspection requirement — Air barrier continuity plan testing
Adrian Figueroa
04/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Adrian Figueroa
04/06/2026
Special inspection requirement — Air barrier - visual inspection
Adrian Figueroa
10/20/2025
Filed — Alteration CO
NEW MECHANICAL AIR CONDITIONING AND VENTILATION FOR NEW RESTAURANT. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01097998-P5
10/14/2025
Special inspection requirement — Interior lighting power
Adrian Figueroa
10/14/2025
Special inspection requirement — Fenestration air leakage
Adrian Figueroa
10/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Adrian Figueroa
10/14/2025
Special inspection requirement — Air barrier - visual inspection
Adrian Figueroa
10/14/2025
Special inspection requirement — Lighting controls
Adrian Figueroa
10/14/2025
Special inspection requirement — Fenestration areas
Adrian Figueroa
09/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/05/2025
Signed off — Alteration CO
NEW MECHANICAL AIR CONDITIONING AND VENTILATION FOR NEW RESTAURANT. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01097998-S2
08/19/2025
Signed off — Alteration
Q01146763-I1
08/15/2025
Signed off — Alteration
NEW HEATING, VENTILATION, AND AIR CONDITIONING IN RETAIL SPACE AND MECHANICAL EXHAUST FOR BATHROOMS. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01096606-I1
08/13/2025
Signed off — Alteration
NEW HEATING, VENTILATION, AND AIR CONDITIONING IN RETAIL SPACE AND MECHANICAL EXHAUST FOR BATHROOMS. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01096606-S2
08/13/2025
Signed off — Alteration CO
NEW MECHANICAL AIR CONDITIONING AND VENTILATION FOR NEW RESTAURANT. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01097998-S1
08/05/2025
Signed off — Alteration
NEW HEATING, VENTILATION, AND AIR CONDITIONING IN RETAIL SPACE AND MECHANICAL EXHAUST FOR BATHROOMS. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01096606-S1
07/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2025
Filed — Alteration CO
NEW MECHANICAL AIR CONDITIONING AND VENTILATION FOR NEW RESTAURANT. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01097998-P4
06/24/2025
Permit issued — General Construction
Q01096606-I1-GC
06/23/2025
Objection resolved — Addressed
06/23/2025
Objection resolved — Addressed
06/23/2025
Objection resolved — Addressed
06/16/2025
Objection raised — Structural
06/16/2025
Objection raised — Structural
06/16/2025
Objection raised — Inspections
06/05/2025
Objection resolved — Addressed
05/30/2025
Objection raised — Scope
05/16/2025
Filed — Alteration CO
NEW MECHANICAL AIR CONDITIONING AND VENTILATION FOR NEW RESTAURANT. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01097998-P3
05/15/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/13/2025
Filed — Alteration
NEW HEATING, VENTILATION, AND AIR CONDITIONING IN RETAIL SPACE AND MECHANICAL EXHAUST FOR BATHROOMS. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Q01096606-P1
05/12/2025
Permit issued — General Construction
Q01097998-I1-GC
05/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2025
Permit issued — Plumbing
Q01097998-S2-EW-SP
Latest 60 of 170 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLITHOS CONSTR SOLUTI06/24/2025
DOB NOWGeneral ConstructionPermit IssuedLITHOS CONSTR SOLUTI05/12/2025
DOB NOWPlumbingSigned-offTHOMAS FAY04/17/2025
DOB NOWMechanical SystemsSigned-offLITHOS CONSTR SOLUTI04/07/2025
DOB NOWMechanical SystemsSigned-offLITHOS CONSTR SOLUTI04/07/2025
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP03/26/2025
DOB NOWStructuralSigned-offLITHOS CONSTR SOLUTI02/19/2025
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP01/22/2025
DOB NOWGeneral ConstructionSigned-offLITHOS CONSTR SOLUTI10/21/2024
DOB NOWGeneral ConstructionSigned-offDELTA PROJECTS GC07/05/2024
DOB NOWGeneral ConstructionSigned-offDELTA PROJECTS GC04/02/2024
DOB NOWGeneral ConstructionSigned-offDELTA PROJECTS GC06/09/2023
DOB NOWGeneral ConstructionSigned-offDELTA PROJECTS GC10/13/2022
DOB NOWConstruction FenceSigned-offDELTA PROJECTS GC10/12/2022
BISPLISSUEDCOPPER SERVICES, LLC01/11/2018
BISBLISSUEDCOPPER SERVICES, LLC01/09/2018
BISBLISSUEDCOPPER SERVICES, LLC01/09/2018
BISOTISSUEDS & S GENERAL CONSTR INC10/10/2017
BISSPISSUEDCOPPER SERVICES LLC10/03/2017
BISMHISSUEDDELTA PROJECTS GC LLC10/02/2017
BISOTISSUEDDELTA PROJECTS GC LLC10/02/2017
BISOTISSUEDDELTA PROJECTS GC LLC09/29/2017
BISPLISSUEDCOPPER SERVICES, LLC07/27/2017
BISOTISSUEDDELTA PROJECTS GC LLC06/20/2017
BISMHISSUEDDELTA PROJECTS GC LLC06/20/2017
BISOTISSUEDDELTA PROJECTS GC LLC06/20/2017
BISEQISSUEDDELTA PROJECTS GC LLC05/05/2017
BISEQISSUEDSAFWAY ATLANTIC, LLC03/30/2017
BISPLISSUEDCOPPER SERVICES, LLC12/06/2016
BISSPISSUEDCOPPER SERVICES LLC11/03/2016
BISEQISSUEDSAFWAY ATLANTIC, LLC04/27/2016
BISPLISSUEDCOPPER SERVICES, LLC04/08/2016
BISPLISSUEDCOPPER SERVICES, LLC04/08/2016
BIS—ISSUEDROCKROSE DEVELOPMENT CORP03/24/2016
BIS—ISSUEDROCKROSE DEVELOPMENT CORP03/24/2016
BISEQISSUEDSAFWAY ATLANTIC, LLC05/05/2015
BISSPISSUEDCOPPER SERVICES LLC12/10/2014
BISOTISSUEDDELTA PROJECTS GC LLC10/08/2014
BISOTISSUEDDELTA PROJECTS GC LLC10/08/2014
BISOTISSUEDDELTA PROJECTS GC LLC10/08/2014
+ 15 more permits on file
1 project · most recent 08/07/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026Permit IssuedLITHOS CONSTR SOLUTI INCVentilation Systems
Ventilation
Penn Barry MUA (Econ Air) EA2-D.500-20D, KX1, KX3 (Pennbarry) FX18BFT, FX13BHFT 6,000 CFM · Makeup Air ×4
1 project · most recent 08/07/2026
Sprinkler System
FiledStatusContractorScope
08/07/2026Signed-offTHOMAS FAYSprinkler System
1 project · most recent 08/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/07/2026Signed-offWATER DYNAMIC P & H CORPGas, Water/Sanitary
3 projects · most recent 06/23/2025
General Wiring
FiledStatusContractorScope
06/23/2025CompleteKYL ELECTRIC LLCGeneral Wiring
05/16/2024Permit IssuedPCS ELECTRICAL SVCS INC—
04/02/2018CompleteGRX EURO ELECTRIC CORP1 meters
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/31/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
04/21/2026Energy Code Compliance InspectionsAdrian Figueroaprogress
04/21/2026Fire-Resistance Rated ConstructionAdrian Figueroaprogress
04/21/2026Lighting controlsAdrian Figueroaenergy_progress
04/21/2026Fenestration and door U-factor and product ratingsAdrian Figueroaenergy_progress
04/21/2026Air barrier — testing Adrian Figueroaenergy_progress
04/21/2026Air barrier - visual inspectionAdrian Figueroaenergy_progress
04/21/2026Fenestration air leakageAdrian Figueroaenergy_progress
04/21/2026Fire-Resistant Penetrations and JointsAdrian Figueroaspecial
04/21/2026Interior lighting powerAdrian Figueroaenergy_progress
04/21/2026Exterior lighting powerAdrian Figueroaenergy_progress
04/21/2026Fenestration areasAdrian Figueroaenergy_progress
04/21/2026Air barrier continuity plan testingAdrian Figueroaenergy_progress
04/06/2026Fire-Resistant Penetrations and JointsAdrian Figueroaspecial
04/06/2026Air barrier — testing Adrian Figueroaenergy_progress
04/06/2026Fenestration and door U-factor and product ratingsAdrian Figueroaenergy_progress
04/06/2026Air barrier - visual inspectionAdrian Figueroaenergy_progress
04/06/2026Fenestration areasAdrian Figueroaenergy_progress
04/06/2026Exterior lighting powerAdrian Figueroaenergy_progress
04/06/2026Air barrier continuity plan testingAdrian Figueroaenergy_progress
04/06/2026Lighting controlsAdrian Figueroaenergy_progress
04/06/2026Interior lighting powerAdrian Figueroaenergy_progress
04/06/2026Fenestration air leakageAdrian Figueroaenergy_progress
04/06/2026Fire-Resistance Rated ConstructionAdrian Figueroaprogress
04/06/2026Energy Code Compliance InspectionsAdrian Figueroaprogress
10/14/2025Fenestration areasAdrian Figueroaenergy_progress
Latest 25 of 91.
▾Documents — 517 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/25/2026Q00634577-I1Request digital key ↗
08/25/2026Q00633341-I1Request digital key ↗
08/23/2026Q01019437-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits85
▸BISPLAN / WORK APPROVAL APPLICATION53
05/06/2019420607187Open ↗
05/06/2019420607178Open ↗
04/23/2019401301792Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION30
01/25/2018421477075Open ↗
01/10/2018421425602Open ↗
01/10/2018421572373Open ↗
Showing 3 of 30 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
09/25/2018400819575Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/09/2019440439688Open ↗
▸Zoning, Tax Lot & Property Records29
▸DOB NOWRestrictive Declaration/Easement 13
08/17/2026Q01097998-P6Open ↗
08/17/2026Q01097998-P7Open ↗
08/17/2026Q01097998-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 23
08/17/2026Q01097998-P7Open ↗
08/17/2026Q01097998-P6Open ↗
08/17/2026Q01097998-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 33
08/17/2026Q01097998-P6Open ↗
08/17/2026Q01097998-P7Open ↗
08/17/2026Q01097998-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 43
08/17/2026Q01097998-P7Open ↗
08/17/2026Q01097998-I1Open ↗
08/17/2026Q01097998-P6Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
01/29/2019420607187Open ↗
01/29/2019420607178Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING DIAGRAM2
02/08/2018421425602Open ↗
02/07/2018421572373Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
12/01/2018440439688Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED EXACTHOUSE FOR NEW TAX LOTS1
01/29/2019420607187Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/29/2018421715237Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED EXACTADDRESS FOR NEW TAX LOTS.1
01/29/2019420607178Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01097998-P7Open ↗
▸Seals & Professional Certifications134
▸DOB NOWProgress Inspector Seal & Signature45
09/02/2026Q01097998-P5Open ↗
09/02/2026Q01097998-P5Open ↗
09/02/2026Q01097998-P5Open ↗
Showing 3 of 45 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
02/19/2019421014841Open ↗
01/09/2019440439688Open ↗
01/09/2019440439688Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/25/2026Q00634577-I1Open ↗
08/23/2026Q01019437-I1Open ↗
08/21/2026Q01146763-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026Q01097998-P5Open ↗
08/27/2026Q01096606-S2Open ↗
08/27/2026Q01096606-S2Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
11/29/2017421572373Open ↗
11/29/2017421425602Open ↗
10/05/2017440439688Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
11/29/2017421572373Open ↗
11/29/2017421425602Open ↗
06/02/2017421477075Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/05/2017440439688Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/05/2017440439688Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
11/30/2017421477075Open ↗
10/13/2017421014841Open ↗
10/13/2017421477075Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
12/29/2018421477075Open ↗
12/29/2018421477075Open ↗
12/29/2018421477075Open ↗
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/29/2018421477075Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/29/2017421572373Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos60
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/23/2026Q01019437-I1Open ↗
08/21/2026Q01146763-I1Open ↗
08/17/2026Q01097998-P6Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWOER: Notice to Proceed14
08/17/2026Q01097998-P6Open ↗
08/17/2026Q01097998-P7Open ↗
08/17/2026Q01097998-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWOER: Notice of Satisfaction12
08/17/2026Q01097998-P6Open ↗
08/17/2026Q01097998-P7Open ↗
08/17/2026Q01097998-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
10/05/2017440439688Open ↗
06/02/2017421477075Open ↗
Showing 2 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED7
11/24/2017421425602Open ↗
11/24/2017421572373Open ↗
10/05/2017440439688Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
02/19/2019421014841Open ↗
01/09/2019440439688Open ↗
11/10/2018421477075Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
02/19/2019421014841Open ↗
01/09/2019440439688Open ↗
11/10/2018421477075Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/05/2017440439688Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/10/2017440439688Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/05/2017440439688Open ↗
▸Approvals, Objections & Sign-offs45
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
05/06/2019420607187Open ↗
05/06/2019420607178Open ↗
02/19/2019421014841Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
04/23/2019421203094Open ↗
12/01/2018440439688Open ↗
11/10/2018421477075Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
11/29/2017421572373Open ↗
06/02/2017421477075Open ↗
04/27/2017421474014Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
03/12/2018420607187Open ↗
03/12/2018420607178Open ↗
Showing 2 of 8 on file for this type
▸BISSUPERSEDING LETTER2
01/25/2018421477075Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT22
05/06/2019420607187Open ↗
05/06/2019420607178Open ↗
01/09/2019440439688Open ↗
Showing 3 of 22 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
05/06/2019420607187Open ↗
05/06/2019420607178Open ↗
▸Filing & Intake Forms49
▸BISADDITIONAL INFORMATION16
01/02/2019440439688Open ↗
03/27/2018420607187Open ↗
03/27/2018420607178Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM15
04/23/2019401301792Open ↗
04/05/2019401301792Open ↗
01/09/2019440439688Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET13
12/29/2018421715237Open ↗
11/29/2017421572373Open ↗
11/29/2017421425602Open ↗
Showing 3 of 13 on file for this type
▸BISeFiling Job Application Cover Sheet5
10/05/2017440439688Open ↗
Showing 1 of 5 on file for this type
▸Other Documents21
▸BISPLOT DIAGRAM6
05/06/2019420607187Open ↗
05/06/2019420607178Open ↗
03/06/2019420607187Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026Q01097998-P7Open ↗
08/17/2026Q01097998-P6Open ↗
08/13/2026Q01097998-P5Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED3
01/31/2019421014841Open ↗
Showing 1 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Deferment1
01/02/2019440439688Open ↗
▸BISRESTRICTION: DEED1
11/28/2017400819575Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01097998-I1Open ↗