Elevator apt, fireproof with stores
Era Astoria
26-18 4TH STREET · BIN 4620927
💬 Discuss this project
2023Year Built
8Stories
D6Building Class
R6Zoning
15,876 sfGross Floor Area
23Units
Rent Stabilized1 Active Violation ▸
Elevator apt, fireproof with stores · Owner of record: 2618 4th Street · 4,998 sf lot · 3.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsWelling And Main LLC1 filing
Site & exteriorPipe scaffold installation for remedial repairs3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Welling and Main5007/08/2026
2618 4th Street203/22/2026
26-18 4 St Astoria203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/07/2020$3.3M—— → —— not available
02/15/2018$1.8M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ndkazalas Architecture511/21/2024
Sideris Kefalas Engineers409/16/2024
Arquitectura Varela303/08/2024
PC Group210/05/2022
Associates104/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ndkazalas Architecture1103/21/2026
S Y Consulting Violations203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vital Development Group IGeneral Contractor2007/08/2026
Classic Consulting GroupScaffold507/08/2026
Vital Development Group IScaffold407/08/2026
All Pro Plumbing & HeatingPlumbing303/22/2026
LG Elite PlumbingPlumbing207/08/2026
Lloyd G Drummond Plumbing & GenFire Protection107/08/2026
Power Surge ElectricElectrical103/22/2026
All Pro Plumbing & HeatingFire Protection107/08/2026
Kwong Ming ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161011/21/2024
Building Lifecycle
All (168)Filed (15)Permit Issued (17)Signed Off (3)Violation (30)Inspection (10)Objection (60)Special Inspection (30)Tax Incentive (3)
05/11/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, closed)
I
08/19/2025
Violation issued (ECB, closed)
Elevators
06/11/2025
Violation issued (HPD, closed)
A
12/05/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
12/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
12/05/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/05/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FAHAD FATEH
12/05/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/05/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/05/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
12/05/2024
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
12/05/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/05/2024
Special inspection requirement — Lowest Floor Elevation
FAHAD FATEH
12/05/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/05/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/05/2024
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
12/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/05/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
12/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
12/05/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
12/05/2024
Special inspection requirement — Air barrier — testing
FAHAD FATEH
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
12/05/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
12/05/2024
Special inspection requirement — Metering
FAHAD FATEH
12/05/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/29/2024
Violation issued (HPD, closed)
I
11/21/2024
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00713110-I1.
Q00713110-P4
11/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/20/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
11/20/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FAHAD FATEH
11/20/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
11/20/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/25/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
10/22/2024
Signed off — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00713110-I1.
Q00713110-S5
10/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2024
Signed off — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00713110-I1.
Q00713110-S6
10/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/09/2024
Permit issued — Curb Cut
Q00713110-S8-CC
10/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/04/2024
Permit issued — Sprinklers
Q00713110-S2-EW-SP
10/01/2024
485-x construction completed
09/27/2024
Permit issued — Mechanical Systems
Q00713110-S3-MS
09/26/2024
Signed off — Alteration
Q00711613-I1
09/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/16/2024
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00713110-I1.
Q00713110-P3
09/06/2024
Objection resolved — Addressed
08/28/2024
Objection resolved — Addressed
08/08/2024
Objection raised — Structural
07/24/2024
Objection resolved — Addressed
07/23/2024
Objection raised — Energy
07/23/2024
Objection raised — Other
07/10/2024
Objection resolved — Addressed
07/08/2024
485-x registration filed
06/28/2024
Objection raised — Other
06/19/2024
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00713110-I1.
Q00713110-P1
04/12/2024
Violation issued (HPD, closed)
A
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedVital Development Group I10/09/2024
DOB NOWSprinklersPermit IssuedAll Pro Plumbing & Heating10/04/2024
DOB NOWMechanical SystemsSigned-offVital Development Group I09/27/2024
DOB NOWSupported ScaffoldPermit IssuedClassic Consulting Group04/09/2024
DOB NOWGeneral ConstructionPermit IssuedVital Development Group I02/12/2024
DOB NOWConstruction FenceSigned-offVital Development Group I02/09/2024
DOB NOWGeneral ConstructionPermit IssuedVital Development Group I02/09/2024
DOB NOWSprinklersPermit IssuedLloyd G. Drummond01/05/2024
DOB NOWPlumbingPermit IssuedLG Elite Plumbing01/03/2024
DOB NOWSidewalk ShedPermit IssuedClassic Consulting Group08/23/2023
DOB NOWGeneral ConstructionPermit IssuedVital Development Group I05/23/2023
DOB NOWPlumbingPermit IssuedLG Elite Plumbing05/11/2023
DOB NOWStructuralSigned-offVital Development Group I05/09/2023
DOB NOWFoundationPermit IssuedVital Development Group I05/08/2023
DOB NOWSupport of ExcavationSigned-offVital Development Group I05/05/2023
DOB NOWSidewalk ShedPermit IssuedClassic Consulting Group04/03/2023
DOB NOWConstruction FenceSigned-offVital Development Group I03/15/2023
BIS—ISSUEDYafe Meod03/27/2023
1 project · most recent 11/21/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/21/2024Permit IssuedVital Development Group IHeating and Air Conditioning Systems
Heat / Cool
Daikin RXSQ24TAVJU 24,000 BTU · Vrf Outdoor ×20
RXSQ36TAVJU 36,000 BTU · Vrf Outdoor ×2
REYQ72PBTJ 69,000 BTU · Vrf Outdoor ×1
RXSQ60TAVJU 57,000 BTU · Vrf Outdoor ×1
1 project · most recent 11/21/2024
Sprinkler System
FiledStatusContractorScope
11/21/2024Permit IssuedAll Pro Plumbing & HeatingSprinkler System
1 project · most recent 11/21/2024
Storm Water/Sanitary
FiledStatusContractorScope
11/21/2024Permit IssuedLG Elite PlumbingStorm, Water/Sanitary
3 projects · most recent 10/02/2024
General Wiring
FiledStatusContractorScope
10/02/2024Permit IssuedPower Surge ElectricGeneral Wiring
11/17/2023Permit IssuedKwong Ming Electric—
05/15/2023Permit IssuedRichard Neu—
1 project · most recent 11/21/2024
FiledStatusContractorScope
11/21/2024Permit IssuedVital Development Group I3 scope_items
2 projects · most recent 03/08/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/08/2024Permit IssuedClassic Consulting GroupScaffold
04/12/2023Permit IssuedClassic Consulting GroupSidewalk Shed
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/25/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
10/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/05/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/09/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
12/05/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/05/2024Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
12/05/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FAHAD FATEHspecial
12/05/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
12/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/05/2024Lowest Floor ElevationFAHAD FATEHprogress
12/05/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/05/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
12/05/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
12/05/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
12/05/2024Electrical motors and elevatorsFAHAD FATEHenergy_progress
12/05/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/05/2024Exterior lighting powerFAHAD FATEHenergy_progress
12/05/2024Interior lighting powerFAHAD FATEHenergy_progress
12/05/2024Fenestration air leakageFAHAD FATEHenergy_progress
12/05/2024Air barrier continuity plan testingFAHAD FATEHenergy_progress
12/05/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/05/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
12/05/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/05/2024Lighting controlsFAHAD FATEHenergy_progress
12/05/2024Air barrier — testing FAHAD FATEHenergy_progress
12/05/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/05/2024Maintenance informationFAHAD FATEHenergy_progress
12/05/2024MeteringFAHAD FATEHenergy_progress
12/05/2024Fenestration areasFAHAD FATEHenergy_progress
Latest 25 of 102.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026Q00711613-I1Request digital key ↗
08/25/2026Q00713110-S6Request digital key ↗
08/25/2026Q00713110-S8Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
09/29/2022440747355Open ↗
05/16/2022421803828Open ↗
05/09/2022421803828Open ↗
▸BISWORK PERMIT APPLICATION1
04/11/2023421803828Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/29/2022440747355Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00713110-I1Open ↗
08/13/2026Q00713110-P1Open ↗
08/13/2026Q00713110-P4Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00713110-I1Open ↗
08/13/2026Q00713110-P1Open ↗
08/13/2026Q00713110-P4Open ↗
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q00713110-S3Open ↗
09/01/2026Q00713110-S3Open ↗
08/31/2026Q00713110-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026Q00713110-S2Open ↗
09/01/2026Q00713110-S3Open ↗
08/31/2026Q00713110-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026Q00711613-I1Open ↗
08/25/2026Q00713110-S5Open ↗
08/25/2026Q00713110-S6Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/29/2022440747355Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/29/2022440747355Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00713110-P1Open ↗
08/13/2026Q00713110-I1Open ↗
08/13/2026Q00713110-P4Open ↗
▸BISSEWER CUT-OFF1
04/11/2023421803828Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00713110-P4Open ↗
08/13/2026Q00713110-I1Open ↗
08/13/2026Q00713110-P1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
04/11/2023421803828Open ↗
04/11/2023421803828Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/23/2022440747355Open ↗
▸BISSTREET TREE CHECKLIST1
09/29/2022440747355Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00713110-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/11/2023421803828Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR5 Test Report1
08/13/2026Q00713110-S7Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00713110-S7Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00713110-S7Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/11/2023421803828Open ↗
04/11/2023421803828Open ↗
04/11/2023421803828Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
04/11/2023421803828Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM2
04/11/2023421803828Open ↗
05/09/2022421803828Open ↗
▸BISADDITIONAL INFORMATION1
01/12/2023440747355Open ↗
▸BISEFILING COVER SHEET1
05/16/2022421803828Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/29/2022440747355Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00713110-P4Open ↗
▸Other Documents15
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00713110-P4Open ↗
08/13/2026Q00713110-P1Open ↗
08/13/2026Q00713110-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)3
08/13/2026Q00713110-S1Open ↗
08/13/2026Q00713110-I1Open ↗
08/13/2026Q00713110-S3Open ↗
▸DOB NOWProperty Ownership Certification3
08/25/2026Q00713110-P4Open ↗
08/15/2026Q00713110-P1Open ↗
08/15/2026Q00713110-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00713110-I1Open ↗
08/13/2026Q00713110-P1Open ↗
08/13/2026Q00713110-P4Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
11/23/2022440747355Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00713110-S5Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00713110-I1Open ↗