← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Lic Ramps
26-38 JACKSON AVENUE · BIN 4620885
💬 Discuss this project
2022Year Built
49Stories
D7Building Class
M1-5/R9Zoning
409,260 sfGross Floor Area
363Units
LL97 CoveredRent Stabilized0 Active Violations
Elevator apt, semi-fireproof with stores · Owner of record: Italic Realty · 10,000 sf lot · 40.93 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsAmerican Lion, LLC10 filings
RoofSidewalk shed, overhead and roof protection4p · 3 filings
BulkheadBoiler and mechanical system commissioning1p · 1 filing
Floor 51Temporary ADT access system installation on roof3p · 1 filing · 14 docs
Floor 50Boiler and mechanical system commissioning9p · 1 filing
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20ADT Access System Installation, 20th Floor1p · 1 filing
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Temporary mobile equipment installation1p · 1 filing
Floor 4
Floor 3
Floor 2
Floor 1
CellarBoiler and mechanical system commissioning2p · 2 filings
Site & exterior2632 Property Owner LLC7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2632 Property Owner903/22/2026
Fetner Properties203/21/2026
Queens Plaza Auto Parts203/21/2026
Italic Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2015$8.5M—B & G ASSOCIATES → 2632 JACKSON LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hunter Roberts ConstructionGeneral Contractor2207/08/2026
Hunter Roberts ConstructionScaffold1307/08/2026
KG SprinklerFire Protection1107/08/2026
Greg LogisticsScaffold907/08/2026
MC SuperstructureScaffold807/08/2026
Tri Borough ScaffoldingScaffold603/21/2026
Trident General ContractingScaffold407/08/2026
Donato Plumbing GroupPlumbing407/08/2026
Vik XS ServicesScaffold307/08/2026
Platinum Services NYScaffold303/21/2026
Cross Country ConstructionScaffold303/21/2026
Jam ElectricalElectrical203/21/2026
Jam ElectricalGeneral Contractor203/22/2026
Vanquish GroupScaffold203/21/2026
Ariel ServicesPlumbing207/08/2026
Universal Builders SupplyScaffold107/08/2026
Parkview P&HPlumbing107/08/2026
KG SprinklerPlumbing103/22/2026
Richmond P & H CoFire Protection107/08/2026
Langan EngineeringGeneral Contractor103/22/2026
Cross Country ConstructionGeneral Contractor107/08/2026
Skyline Scaffolding GroupScaffold107/08/2026
DoriaScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS Engineering3745109/08/2026
Fenagh69423805/30/2025
Socotec301903/19/2025
Skyline Rigging7880101/15/2025
Lombardo Prof Engineering8566710/09/2024
Langan Engineering, Env, Surveyin1265409/13/2024
Valjato Engineering2486309/26/2023
Desimone Consulting Engineering5942107/14/2022
Technical Systems Review7409104/12/2022
Building Lifecycle
All (300)Filed (73)Permit Issued (65)Signed Off (29)Violation (17)Inspection (19)Objection (67)Special Inspection (30)
09/09/2026
Permit issued — Suspended Scaffold
Q01348204-I1-SC
09/08/2026
Filed — Alteration
Facade Inspection via Industrial Rope Access as shown on plans
Q01348204-I1
05/04/2026
Violation issued (HPD, closed)
A
02/06/2026
Violation issued (ECB, closed)
Unknown
01/21/2026
Signed off — New Building
FILING FOR 49 STORY Residential high-rise BUILDING AS PER PLANS FILED HEREWITH.
Q00608144-S4
01/20/2026
Special inspection requirement — Post-installed Anchors
Michael Walsh
01/15/2026
Signed off — Alteration
INSTALLATION OF PYLWOOD FENCE AND PLASTIC BARRIER AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01238882-I1
12/03/2025
Signed off — Alteration
NEW BUILDING: INSTALLATION OF A TEMPORARY STANDPIPE FOR RESIDENTIAL BUILDING, AS PER PLANS FILED HEREWITH. THIS WORK IS TO BE FILED IN CONJUNCTION TO THE NEW BUILDING APPLICATION #Q00608144-I1.
Q00736861-I1
11/17/2025
Signed off — Alteration
NEW BUILDING: NEW PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR THE RESIDENTIAL BUILDING, AS PER PLANS FILED HEREWITH. TO BE FILED IN CONJUNCTION TO THE NEW BUILDING APPLICATION #Q00608144-I1.
Q00662473-I1
06/22/2025
Filed — Alteration
INSTALLATION OF PYLWOOD FENCE AND PLASTIC BARRIER AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01238882-P1
06/16/2025
Violation issued (HPD, closed)
A
06/11/2025
Permit issued — Construction Fence
Q01238882-I1-FN
06/10/2025
Filed — Alteration
INSTALLATION OF PYLWOOD FENCE AND PLASTIC BARRIER AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01238882-I1
06/03/2025
Permit issued — Plumbing
Q00662473-I1-EW-SD
06/03/2025
Permit issued — Sprinklers
Q00662473-I1-EW-SP
05/30/2025
Filed — Alteration
NEW BUILDING: NEW PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR THE RESIDENTIAL BUILDING, AS PER PLANS FILED HEREWITH. TO BE FILED IN CONJUNCTION TO THE NEW BUILDING APPLICATION #Q00608144-I1.
Q00662473-P9
05/08/2025
Signed off — Alteration
Suspended Hanging Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
Q00884454-I1
05/05/2025
Permit issued — Standpipe
Q00662473-I1-PL
04/24/2025
Signed off — Alteration
Installation of temporary Loading Platforms in Conjunction with NB Q00608144. This application involves no change in use, occupancy, or egress.
Q00850176-I1
04/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/21/2025
Special inspection requirement — Preliminary
AILANTO DANIEL MINAWI
03/21/2025
Special inspection requirement — Lowest Floor Elevation
AILANTO DANIEL MINAWI
03/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
03/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jennifer Sze
03/21/2025
Special inspection requirement — Air barrier - visual inspection
Jennifer Sze
03/21/2025
Special inspection requirement — Protection of exposed foundation insulation
Jennifer Sze
03/21/2025
Special inspection requirement — Insulation placement and R values
Jennifer Sze
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Jennifer Sze
03/21/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Jennifer Sze
03/21/2025
Special inspection requirement — Fenestration areas
Jennifer Sze
03/21/2025
Special inspection requirement — Fenestration air leakage
Jennifer Sze
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
03/19/2025
Filed — New Building
FILING FOR 49 STORY Residential high-rise BUILDING AS PER PLANS FILED HEREWITH.
Q00608144-A5
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
03/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
03/18/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Jennifer Sze
03/18/2025
Special inspection requirement — Lowest Floor Elevation
AILANTO DANIEL MINAWI
03/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Jennifer Sze
03/18/2025
Special inspection requirement — Air barrier - visual inspection
Jennifer Sze
03/18/2025
Special inspection requirement — Protection of exposed foundation insulation
Jennifer Sze
03/18/2025
Special inspection requirement — Fenestration areas
Jennifer Sze
03/18/2025
Special inspection requirement — Insulation placement and R values
Jennifer Sze
03/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jennifer Sze
03/18/2025
Special inspection requirement — Fenestration air leakage
Jennifer Sze
03/18/2025
Special inspection requirement — Preliminary
AILANTO DANIEL MINAWI
03/14/2025
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY MOBILE EQUIPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00946984-I1
03/11/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
Q01165889-I1
03/10/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00717862-I1
03/04/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, OVERHEAD PROTECTION, ROOF PROTECTION,CONCRETE BARRIERS, PLASTIC BARRIESR AND CONSTRUCTION FENCE AS PER PLANS.ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00835731-I1
03/04/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Q01025772-I1
03/03/2025
Signed off — Alteration
INSTALLATION OF AN ADT ACCESS SYSTEM ON THE 20TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Q00955143-I1
02/24/2025
Signed off — Alteration
Installation of ADT workhorse material lifting crab. Add rotating material lifting davit.
Q01119235-I1
02/20/2025
Signed off — Alteration
CONSTRUCTION FENCE FILED IN CONJUNCTION WITH DEMOLITION APPLICATION #421806148
Q00661622-I1
02/14/2025
Filed — New Building
FILING FOR 49 STORY Residential high-rise BUILDING AS PER PLANS FILED HEREWITH.
Q00608144-A4
02/14/2025
Signed off — New Building
FILING FOR 49 STORY Residential high-rise BUILDING AS PER PLANS FILED HEREWITH.
Q00608144-S5
02/14/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Jennifer Sze
02/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Jennifer Sze
02/14/2025
Special inspection requirement — Fenestration areas
Jennifer Sze
02/14/2025
Special inspection requirement — Fenestration air leakage
Jennifer Sze
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedM & L Signs09/09/2026
DOB NOWConstruction FenceSigned-offMC Superstructure06/11/2025
DOB NOWStandpipeSigned-offH M Sprinkler06/03/2025
DOB NOWSprinklersSigned-offH M Sprinkler06/03/2025
DOB NOWPlumbingSigned-offDonato Plumbing Group05/05/2025
DOB NOWStructuralSigned-offHunter Roberts Construction02/03/2025
DOB NOWSuspended ScaffoldPermit IssuedDoria01/16/2025
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction01/02/2025
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction11/15/2024
DOB NOWBoiler EquipmentSigned-offDG Mechanical Heating10/28/2024
DOB NOWBoiler EquipmentSigned-offDG Mechanical Heating10/28/2024
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction10/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offGreg Logistics09/30/2024
DOB NOWSuspended ScaffoldSigned-offGreg Logistics09/27/2024
DOB NOWProtection and Mechanical MethodsSigned-offGreg Logistics09/27/2024
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services08/06/2024
DOB NOWMechanical SystemsSigned-offHunter Roberts Construction07/30/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure07/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offHunter Roberts Construction07/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offHunter Roberts Construction06/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offHunter Roberts Construction06/17/2024
DOB NOWStandpipeSigned-offH M Sprinkler06/12/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure06/12/2024
DOB NOWSprinklersSigned-offH M Sprinkler05/31/2024
DOB NOWStandpipeSigned-offH M Sprinkler05/31/2024
DOB NOWSupported ScaffoldSigned-offSkyline Scaffolding Group05/02/2024
DOB NOWSuspended ScaffoldSigned-offGreg Logistics03/29/2024
DOB NOWSuspended ScaffoldSigned-offHunter Roberts Construction03/26/2024
DOB NOWPlumbingSigned-offDonato Plumbing Group03/20/2024
DOB NOWPlumbingSigned-offDonato Plumbing Group03/01/2024
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction12/28/2023
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction12/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offGreg Logistics10/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offHunter Roberts Construction10/20/2023
DOB NOWProtection and Mechanical MethodsSigned-offVik XS Services08/04/2023
DOB NOWMechanical SystemsSigned-offHunter Roberts Construction08/04/2023
DOB NOWConstruction FenceSigned-offMC Superstructure07/11/2023
DOB NOWConstruction FenceSigned-offMC Superstructure07/11/2023
DOB NOWGeneral ConstructionSigned-offCross Country Construction06/26/2023
DOB NOWProtection and Mechanical MethodsSigned-offHunter Roberts Construction06/15/2023
+ 12 more permits on file
1 project · most recent 03/19/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2025Signed-offHunter Roberts ConstructionHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Hitachi HVAHP144B42S 135,000 BTU · Vrf Outdoor ×120
HVAHP168B42S 168,000 BTU · Vrf Outdoor ×18
HVAHP192B32S & HVAHP144B32S 135,000 BTU · Vrf Outdoor ×15
HVAHR144B32S & HVAHP144B32S 135,000 BTU · Vrf Outdoor ×15
HVAHP120B42S 120,000 BTU · Vrf Outdoor ×12
HVAHP072B42S 72,000 BTU · Vrf Outdoor ×9
HVAHP120B32S 120,000 BTU · Vrf Outdoor ×9
HVAHR144B32S 135,000 BTU · Vrf Outdoor ×9
RAS-4.0PNNBDH1 36,000 BTU · Vrf Outdoor ×6
HVAHP168B32S 168,000 BTU · Vrf Outdoor ×6
HVAHP192B42S 192,000 BTU · Vrf Outdoor ×6
HVAHP072B32S 72,000 BTU · Vrf Outdoor ×2
RAS-1.5PNNBDH1 12,000 BTU · Vrf Outdoor ×2
HVAHP036B21S 36,000 BTU · Vrf Outdoor ×1
Ventilation
Aaon RNA-031-D-0-3-EJA0B-A02NA:00-0AFAK-KBK-00000-ABNBK-UC-CB0B-E0-E0-C-AVO-ZT-JA0B-00-000-B00G00-G00FAA-000A0B 7,200 CFM · Erv ×3
Nortek A-1-07E-XX-X-X-X-P 12,300 CFM · Erv ×3
1 project · most recent 04/12/2022
FiledStatusContractorScope
04/12/2022Permit IssuedRichmond P & H Co61 heads
1 project · most recent 03/19/2025
Water/Sanitary
FiledStatusContractorScope
03/19/2025——Water/Sanitary
10 projects · most recent 10/14/2025
General Wiring
FiledStatusContractorScope
10/14/2025Permit IssuedS. J. ElectricGeneral Wiring
07/23/2025CompleteJam Electrical—
06/14/2023CompleteS. J. Electric1 meters, 1 new_meters
06/13/2023CompleteS. J. Electric—
05/10/2023CompleteNash Electric Services—
03/31/2023CompleteS. J. Electric—
03/31/2023CompleteS. J. Electric—
03/16/2023CompleteS. J. Electric—
03/16/2023CompleteAgir Electrical Ltd D/B/A1 meters, 1 new_meters
04/13/2022CompleteIlluminous ElectricGeneral Wiring
1 project · most recent 03/19/2025
Steel Concrete Masonry
FiledStatusContractorScope
03/19/2025Signed-offHunter Roberts ConstructionSteel, Concrete, Masonry
1 project · most recent 09/08/2026
FiledStatusContractorScope
09/08/2026Permit IssuedM & L Signs—
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
04/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/04/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
11/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/27/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/25/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
05/31/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/30/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/25/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
02/02/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/28/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/10/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/10/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/08/2023Pass-Final PL - UndergroundPassView ↗
04/13/2023Pass-Final PL - UndergroundPassView ↗
04/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
01/20/2026Post-installed AnchorsMichael Walshspecial
03/21/2025Fenestration air leakageJennifer Szeenergy_progress
03/21/2025Insulation placement and R valuesJennifer Szeenergy_progress
03/21/2025Fenestration and door U-factor and product ratingsJennifer Szeenergy_progress
03/21/2025Protection of exposed foundation insulationJennifer Szeenergy_progress
03/21/2025Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
03/21/2025PreliminaryAILANTO DANIEL MINAWIprogress
03/21/2025Lowest Floor ElevationAILANTO DANIEL MINAWIprogress
03/21/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
03/21/2025Wall Panels, Curtain Walls, and VeneersJennifer Szespecial
03/21/2025Energy Code Compliance InspectionsJennifer Szeprogress
03/21/2025Air barrier - visual inspectionJennifer Szeenergy_progress
03/21/2025Fenestration areasJennifer Szeenergy_progress
03/18/2025Fenestration and door U-factor and product ratingsJennifer Szeenergy_progress
03/18/2025Fenestration areasJennifer Szeenergy_progress
03/18/2025Insulation placement and R valuesJennifer Szeenergy_progress
03/18/2025PreliminaryAILANTO DANIEL MINAWIprogress
03/18/2025Lowest Floor ElevationAILANTO DANIEL MINAWIprogress
03/18/2025Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
03/18/2025Energy Code Compliance InspectionsJennifer Szeprogress
03/18/2025Wall Panels, Curtain Walls, and VeneersJennifer Szespecial
03/18/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
03/18/2025Protection of exposed foundation insulationJennifer Szeenergy_progress
03/18/2025Air barrier - visual inspectionJennifer Szeenergy_progress
03/18/2025Fenestration air leakageJennifer Szeenergy_progress
Latest 25 of 150.
▾Documents — 539 on file (BIS + DOB NOW)
▸Plans & Drawings81
▸DOB NOWPlans/Sketch81
10/13/2026Q01348204-I1Request digital key ↗
08/29/2026Q00662995-I1Request digital key ↗
08/26/2026Q00661622-I1Request digital key ↗
Showing 3 of 81 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/14/2022440731077Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/21/2023440731077Open ↗
▸Zoning, Tax Lot & Property Records70
▸DOB NOWRestrictive Declaration/Easement 122
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸DOB NOWRestrictive Declaration/Easement 220
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWZoning Exhibit form (1-5)12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications300
▸DOB NOWProgress Inspector Seal & Signature141
10/04/2026Q00608144-P6Open ↗
10/04/2026Q00608144-P6Open ↗
10/04/2026Q00608144-P6Open ↗
Showing 3 of 141 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature81
10/04/2026Q00608144-P6Open ↗
10/04/2026Q00608144-P6Open ↗
09/28/2026Q00608144-A4Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature77
09/10/2026Q01348204-I1Open ↗
08/26/2026Q00661622-I1Open ↗
08/26/2026Q00714519-I1Open ↗
Showing 3 of 77 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/14/2022440731077Open ↗
▸Trade Schedules & Equipment13
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
06/14/2022440731077Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸DOB NOWConcrete Testing Exception Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
03/21/2023440731077Open ↗
10/03/2022440731077Open ↗
09/06/2022440731077Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/14/2022440731077Open ↗
▸Other Documents49
▸DOB NOWSite Survey: Initial11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWProperty Ownership Certification11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWCalculations6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWManufacturer's Specifications6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISBPP: TOPOGRAPHIC SURVEY1
09/06/2022440731077Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
09/10/2026Q01348204-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type