Condo, residential tower (mixed-use, multi-family elevator) [derived]
Astor on Third
26-41 THIRD STREET · BIN 4623290
💬 Discuss this project
2021Year Built
7Stories
RMBuilding Class
R6Zoning
79,569 sfGross Floor Area
94Units
Rent Stabilized2 Open Violations ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THIRD STREET EQUITY, LLC · 14,614 sf lot · 5.44 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilOther
Roof5p · 3 filings · 20 docs
Bulkhead4p · 2 filings · 20 docs
Floor 73p · 2 filings · 20 docs
Floor 65p · 2 filings · 20 docs
Floor 53p · 3 filings · 20 docs
Floor 44p · 3 filings · 20 docs
Floor 34p · 3 filings · 20 docs
Floor 25p · 4 filings · 20 docs
Floor 116p · 5 filings · 20 docs
Mezzanine2p · 1 filing · 20 docs
Cellar3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEVELOPING NY STATE8309/12/2026
J G CONSTRUCTION SRVCS207/08/2026
THIRD STREET EQUITY, LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES6003/21/2026
DESIGN GROUP IN H K603/21/2026
AE DESIGN SOLUTION603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEVELOPING NY STATE LLCGeneral Contractor1707/08/2026
CENTRAL SCAFFOLD & HOISTGeneral Contractor903/21/2026
SAFETY FIRE SPRINKLER CORPFire Protection807/08/2026
COEPTUM BUILDERS LLCGeneral Contractor407/08/2026
B IN POWER MECHANICAL INCGeneral Contractor307/08/2026
MPI PLUMBING CORPPlumbing207/08/2026
A. M. PLUMBING COMPANYPlumbing207/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
NY BUILDING ASSOCIATES INGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
DYNAMIC ELEC'L CONTRS INCElectrical103/22/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244803/24/2026
TSF ENGINEERING, PC1274803/13/2023
REGIONAL TESTING CORP.3941406/20/2022
Building Lifecycle
All (204)Filed (37)Permit Issued (31)Signed Off (15)Violation (17)Inspection (22)Objection (52)Special Inspection (30)
08/06/2026
Violation issued (ECB, open)
Construction
05/01/2026
Signed off — Alteration
SUBSEQUENT FILING OF PLUMBING/SPRINKLER WORK IN CONJUNCTION WITH DOB#Q01093264-I1 (LAUNDROMAT). WORK INCLUDES INSTALLATION OF WASHERS & DRYERS, AND SPRINKLER HEADS AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
Q01093264-I1
03/24/2026
Filed — Alteration
SUBSEQUENT FILING OF PLUMBING/SPRINKLER WORK IN CONJUNCTION WITH DOB#Q01093264-I1 (LAUNDROMAT). WORK INCLUDES INSTALLATION OF WASHERS & DRYERS, AND SPRINKLER HEADS AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
Q01093264-P2
03/24/2026
Special inspection requirement — Lighting controls
NARESH MAHANGU
03/24/2026
Special inspection requirement — Concrete - Cast-In-Place
NARESH MAHANGU
03/24/2026
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
03/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
03/24/2026
Special inspection requirement — Interior lighting power
NARESH MAHANGU
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
03/24/2026
Special inspection requirement — Final
PETER CHO
03/18/2026
Special inspection requirement — Interior lighting power
NARESH MAHANGU
03/18/2026
Special inspection requirement — Lighting controls
NARESH MAHANGU
03/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
03/18/2026
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
03/18/2026
Special inspection requirement — Concrete - Cast-In-Place
NARESH MAHANGU
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/18/2026
Special inspection requirement — Final
PETER CHO
03/11/2026
Signed off — Alteration
SUBSEQUENT FILING OF PLUMBING/SPRINKLER WORK IN CONJUNCTION WITH DOB#Q01093264-I1 (LAUNDROMAT). WORK INCLUDES INSTALLATION OF WASHERS & DRYERS, AND SPRINKLER HEADS AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
Q01093264-S1
10/26/2025
Violation issued (ECB, open)
Construction
09/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/25/2025
Special inspection requirement — Sprinkler Systems
NARESH MAHANGU
02/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
02/19/2025
Filed — Alteration
SUBSEQUENT FILING OF PLUMBING/SPRINKLER WORK IN CONJUNCTION WITH DOB#Q01093264-I1 (LAUNDROMAT). WORK INCLUDES INSTALLATION OF WASHERS & DRYERS, AND SPRINKLER HEADS AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
Q01093264-P1
02/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/12/2024
Permit issued — Sprinklers
Q01093264-S1-EW-SP
11/12/2024
Permit issued — Plumbing
Q01093264-S1-PL
11/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/07/2024
Filed — Alteration CO
NO WORK APPLICATION FILED TO CORRECT RESTRICTIVE DEC ON PW1 SECTION 9 PER NB PLANS FILED AND SIGNED OFF UNDER APPLICATION #421133320. NO CHANGE IN EGRESS OR USE UNDER THIS APPLICATION.
Q01009686-P1
10/11/2024
Permit issued — Mechanical Systems
Q01093264-I1-GC-CX
10/01/2024
Violation issued (ECB, closed)
Construction
08/16/2024
Filed — Alteration
SUBSEQUENT FILING OF PLUMBING/SPRINKLER WORK IN CONJUNCTION WITH DOB#Q01093264-I1 (LAUNDROMAT). WORK INCLUDES INSTALLATION OF WASHERS & DRYERS, AND SPRINKLER HEADS AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
Q01093264-I1
08/16/2024
Filed — Alteration
SUBSEQUENT FILING OF PLUMBING/SPRINKLER WORK IN CONJUNCTION WITH DOB#Q01093264-I1 (LAUNDROMAT). WORK INCLUDES INSTALLATION OF WASHERS & DRYERS, AND SPRINKLER HEADS AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
Q01093264-S1
08/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/31/2024
Permit issued — General Construction
Q01009686-I1-GC
05/08/2024
Objection resolved — Addressed
05/08/2024
Objection resolved — Addressed
05/08/2024
Objection resolved — Addressed
05/07/2024
Objection raised — Other
05/07/2024
Objection raised — Other
05/07/2024
Objection raised — Other
04/16/2024
Objection resolved — Addressed
03/05/2024
Objection raised — Other
02/26/2024
Filed — Alteration CO
NO WORK APPLICATION FILED TO CORRECT RESTRICTIVE DEC ON PW1 SECTION 9 PER NB PLANS FILED AND SIGNED OFF UNDER APPLICATION #421133320. NO CHANGE IN EGRESS OR USE UNDER THIS APPLICATION.
Q01009686-I1
03/23/2023
Signed off — Alteration
Mechanical systems in conjunction with NB application
Q00382766-S1
03/21/2023
Signed off — Alteration
Mechanical system in conjunction to application #Q00763480-I1
Q00763480-I1
03/21/2023
Signed off — Alteration
Underground plumbing work only in conjunction with NB application. All other plumbing work filed under Q00382766-S1
Q00503027-I1
03/21/2023
Signed off — Alteration
Mechanical system in conjunction to application #Q00763480-I1
Q00763480-S1
03/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
03/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN11/12/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.11/12/2024
DOB NOWMechanical SystemsSigned-offNY BUILDING ASSOCIATES IN10/11/2024
DOB NOWGeneral ConstructionPermit IssuedDEVELOPING NY STATE LLC05/31/2024
DOB NOWPlumbingSigned-offSAFETY FIRE SPRINKLER CORP02/17/2023
DOB NOWMechanical SystemsSigned-offCOEPTUM BUILDERS LLC01/26/2023
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY01/18/2023
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY12/08/2022
DOB NOWGeneral ConstructionSigned-offCOEPTUM BUILDERS LLC08/12/2022
DOB NOWCurb CutSigned-offDEVELOPING NY STATE LLC06/21/2022
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP06/01/2022
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP06/01/2022
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP04/25/2022
DOB NOWSidewalk ShedSigned-offCENTRAL SCAFFOLD & HOIST04/08/2022
DOB NOWMechanical SystemsSigned-offB IN POWER MECHANICAL INC03/18/2022
DOB NOWMechanical SystemsSigned-offB IN POWER MECHANICAL INC02/21/2022
DOB NOWConstruction FenceSigned-offDEVELOPING NY STATE LLC10/27/2021
DOB NOWPlumbingSigned-offYG SERVICES INC09/14/2021
DOB NOWMechanical SystemsSigned-offB IN POWER MECHANICAL INC09/02/2021
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP07/01/2021
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP07/01/2021
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP04/26/2021
DOB NOWPlumbingSigned-offYG SERVICES INC04/20/2021
DOB NOWSupported ScaffoldSigned-offCENTRAL SCAFFOLD & HOIST04/08/2021
DOB NOWSidewalk ShedSigned-offCENTRAL SCAFFOLD & HOIST04/08/2021
DOB NOWConstruction FenceSigned-offDEVELOPING NY STATE LLC10/16/2020
DOB NOWConstruction FenceSigned-offDEVELOPING NY STATE LLC09/21/2020
DOB NOWStructuralSigned-offDEVELOPING NY STATE LLC09/17/2020
DOB NOWConstruction FenceSigned-offDEVELOPING NY STATE LLC09/04/2020
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS08/03/2020
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP07/24/2020
BIS—ISSUEDDEVELOPING NY STATE LLC01/04/2023
BIS—ISSUEDDEVELOPING NY STATE LLC12/24/2021
BIS—ISSUEDDEVELOPING NY STATE LLC12/23/2020
BIS—ISSUEDDEVELOPING NY STATE LLC12/23/2020
BIS—ISSUEDDEVELOPING NY STATE LLC11/24/2020
BIS—ISSUEDDEVELOPING NY STATE LLC08/28/2020
BIS—ISSUEDTRY MANGEMENT COMPANY INC05/19/2005
5 projects · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026CompleteERIC & NG ELEC'L, INC.General Wiring
11/29/2022CompleteMAN POWER ELECTRIC INCGeneral Wiring
06/29/2022CompleteDYNAMIC ELEC'L CONTRS INCGeneral Wiring
09/17/2021CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
04/08/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
09/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2024Fail-Final CND-Occupancy InspectionFailView ↗
02/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
06/16/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/16/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/13/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/13/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/18/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
03/24/2026Interior lighting powerNARESH MAHANGUenergy_progress
03/24/2026Mechanical SystemsNARESH MAHANGUspecial
03/24/2026Concrete - Cast-In-PlaceNARESH MAHANGUspecial
03/24/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/24/2026Tenant Protection Plan ComplianceNARESH MAHANGUspecial
03/24/2026FinalPETER CHOprogress
03/24/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/24/2026Lighting controlsNARESH MAHANGUenergy_progress
03/18/2026Concrete - Cast-In-PlaceNARESH MAHANGUspecial
03/18/2026Interior lighting powerNARESH MAHANGUenergy_progress
03/18/2026Lighting controlsNARESH MAHANGUenergy_progress
03/18/2026FinalPETER CHOprogress
03/18/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/18/2026Tenant Protection Plan ComplianceNARESH MAHANGUspecial
03/18/2026Mechanical SystemsNARESH MAHANGUspecial
03/18/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
02/25/2025Sprinkler SystemsNARESH MAHANGUspecial
02/25/2025Tenant Protection Plan ComplianceNARESH MAHANGUspecial
02/25/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/12/2024Tenant Protection Plan Compliance—special
03/20/2023Shutoff dampersNicholas Tuccienergy_progress
03/20/2023Maintenance informationNicholas Tuccienergy_progress
03/20/2023HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
03/20/2023Fire-Resistant Penetrations and JointsNicholas Tuccispecial
03/20/2023FinalNicholas Tucciprogress
Latest 25 of 106.
▾Documents — 402 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch26
08/27/2026Q00382766-S1Request digital key ↗
08/27/2026Q00382766-P1Request digital key ↗
08/27/2026Q00382766-P2Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Structural4
08/27/2026Q00347643-P3Request digital key ↗
08/15/2026Q00347643-I1Request digital key ↗
08/14/2026Q00347643-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/27/2026Q00354847-I1Request digital key ↗
08/14/2026Q00354847-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/28/2026Q00363074-I1Request digital key ↗
08/15/2026Q00363074-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026Q00382766-I1Request digital key ↗
08/15/2026Q00382766-P4Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00354849-I1Request digital key ↗
▸Applications & Permits56
▸BISPLAN / WORK APPROVAL APPLICATION47
10/29/2025402136372Open ↗
07/18/2023421812658Open ↗
07/18/2023421812658Open ↗
Showing 3 of 47 on file for this type
▸BISWORK PERMIT APPLICATION6
03/02/2023421133320Open ↗
01/21/2021421133320Open ↗
01/21/2021421133320Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
04/13/2022440595303Open ↗
07/14/2020440595303Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/17/2023421812658Open ↗
▸Zoning, Tax Lot & Property Records25
▸BISZONING DIAGRAM4
05/19/2021421133320Open ↗
05/06/2021421133320Open ↗
11/30/2020421133320Open ↗
Showing 3 of 4 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED4
07/19/2023421812658Open ↗
05/17/2023421812658Open ↗
11/30/2020421133320Open ↗
Showing 3 of 4 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION4
07/19/2023421812658Open ↗
07/19/2023421812658Open ↗
11/30/2020421133320Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION3
05/17/2023421812658Open ↗
11/30/2020421133320Open ↗
Showing 2 of 3 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT3
05/17/2023421812658Open ↗
11/30/2020421133320Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01009686-P1Open ↗
08/13/2026Q01009686-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/17/2023421812658Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/17/2023421812658Open ↗
▸BISVERIFY TAX LOT1
06/23/2022421133320Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
07/22/2020420667282Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/20/2022421133320Open ↗
▸Seals & Professional Certifications102
▸DOB NOWDPL-1: Design Professional Seal & Signature37
08/28/2026Q00363074-I1Open ↗
08/27/2026Q00354847-I1Open ↗
08/27/2026Q00354847-P1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/02/2026Q00499887-I1Open ↗
09/01/2026Q01093264-I1Open ↗
09/01/2026Q01093264-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/19/2026Q00382766-P3Open ↗
09/19/2026Q00382766-P3Open ↗
09/19/2026Q00382766-P3Open ↗
Showing 3 of 27 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/21/2021421133320Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment9
▸BISDEP SANITARY SEWER CERTIFICATION(HCP/SCP)2
03/31/2023421133320Open ↗
12/15/2022421133320Open ↗
▸DOB NOWFDNY: Letter of No Objection2
08/13/2026Q00382766-S3Open ↗
08/13/2026Q00382766-P3Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
09/19/2022421133320Open ↗
▸BISSTANDPIPE WORK PERMIT1
08/21/2020420667282Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/19/2022421133320Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/19/2022421133320Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION(HCP/SCP)1
03/31/2023421133320Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
04/13/2022440595303Open ↗
11/30/2020421133320Open ↗
Showing 2 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN3
12/23/2020421133320Open ↗
08/21/2020420667282Open ↗
07/14/2020440595303Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
04/13/2023421133320Open ↗
06/23/2022421133320Open ↗
06/23/2022421133320Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/21/2021421133320Open ↗
01/21/2021421133320Open ↗
01/21/2021421133320Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00763480-I1Open ↗
08/13/2026Q00382766-I1Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
08/25/2022421133320Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/23/2022421133320Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00382766-I1Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY13
06/23/2022421133320Open ↗
06/23/2022421133320Open ↗
06/23/2022421133320Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
05/19/2021421133320Open ↗
03/31/2021421133320Open ↗
01/21/2021421133320Open ↗
Showing 3 of 8 on file for this type
▸BISSOIL REPORT2
11/30/2020421133320Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/05/2023421133320Open ↗
01/21/2021421133320Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
11/30/2020421133320Open ↗
Showing 1 of 2 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
12/23/2020421133320Open ↗
08/21/2020420667282Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/21/2020420667282Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
01/20/2022421133320Open ↗
▸Approvals, Objections & Sign-offs42
▸BISSCHEDULE A - OCCUPANCY / USE25
10/04/2022421133320Open ↗
09/13/2022421133320Open ↗
08/17/2022421133320Open ↗
Showing 3 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
07/19/2023421812658Open ↗
07/18/2023421812658Open ↗
05/18/2023421812658Open ↗
Showing 3 of 12 on file for this type
▸BISDOT APPROVAL FOR APEX CORNER PED-RAMP2
07/12/2022440595303Open ↗
07/12/2022440595303Open ↗
▸BISCURB CUT (CC) SIGNOFF1
04/14/2023421133320Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
04/14/2023421133320Open ↗
▸BISJOB # 420667282 SHALL BE WITHDRAWN PRIORTO SIGNOFF1
03/31/2023421133320Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE3
01/21/2021421133320Open ↗
12/23/2020421133320Open ↗
08/28/2020420667282Open ↗
▸BISCOST AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION18
10/20/2022421133320Open ↗
08/25/2022421133320Open ↗
08/25/2022421133320Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM7
07/18/2023421812658Open ↗
03/02/2023421133320Open ↗
01/21/2021421133320Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
07/18/2023421812658Open ↗
10/22/2020421133320Open ↗
10/19/2020421133320Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q01009686-P1Open ↗
▸Other Documents31
▸DOB NOWFlood Plan Emergency Temporary Flood Shields8
08/27/2026Q00382766-P1Open ↗
08/27/2026Q00382766-S1Open ↗
08/27/2026Q00382766-P2Open ↗
Showing 3 of 8 on file for this type
▸BISPLOT DIAGRAM5
07/19/2023421812658Open ↗
05/17/2023421812658Open ↗
11/30/2020421133320Open ↗
Showing 3 of 5 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM2
11/30/2020421133320Open ↗
Showing 1 of 2 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN2
11/30/2020421133320Open ↗
07/20/2020420667282Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
04/14/2023421133320Open ↗
04/14/2023421133320Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01009686-I1Open ↗
08/21/2026Q01009686-P1Open ↗
▸DOB NOWLowest Floor Elevation Plan2
08/27/2026Q00382766-S1Open ↗
08/15/2026Q00347643-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/13/2026Q00347643-I1Open ↗
08/13/2026Q00382766-S1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/13/2022440595303Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT1
04/13/2022440595303Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
08/25/2022421133320Open ↗
▸BISUnknown1
01/21/2021421133320Open ↗