1885Year Built
32Stories
O4Building Class
C5-5Zoning
860,889 sfGross Floor Area
49Units
LL97 Covered43 Open Violations 22 unresolved · 21 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: BROADWAY 26 WATERVIEW LLC · 46,055 sf lot · 18.69 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 14 docs
Floor 272p · 1 filing · 5 docs
Floor 261p · 1 filing · 5 docs
Floor 25
Floor 24
Floor 23
Floor 22Under Construction1 filing · 20 docs
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 1528p · 4 filings · 20 docs
Floor 1441p · 9 filings · 20 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Under Construction29p · 6 filings · 20 docs
Floor 8
Floor 7Under Construction6p · 1 filing · 6 docs
Floor 6
Floor 5
Floor 4
Floor 32p · 1 filing · 5 docs
Floor 2
Floor 123p · 6 filings · 20 docs
Mezzanine1p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROADWAY 26 WATERVIEW36209/24/2026
BROADWAY26WATERVIEWLLC7407/08/2026
JERRICK ASSOCIATES2407/08/2026
DOE BDWY EDUC CAMPUS 040203/22/2026
DEPARTMENT OF EDUCATION403/22/2026
STRUCTURAL PRESERV SYSTEM103/22/2026
26 BROADWAY WATERVIEW LLC103/22/2026
DOE 040403/22/2026
DOE M282 040103/22/2026
14-16 BROADWAY TERRZE ASS103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES5403/21/2026
RICHARD WAINER ARCHITECT, PLLC403/21/2026
CASO ASSOCIATES203/21/2026
Rigid Structural Design, LLC203/21/2026
DVA Advisors403/21/2026
AE DESIGN SOLUTION603/21/2026
KAZAM CONSULTANTS403/21/2026
W J PROFESSIONAL EXPEDITING COMPANY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E AND G MODICA CONTRACTINGeneral Contractor4207/08/2026
JERRICK ASSOCIATES INCGeneral Contractor1207/08/2026
PHOENIX SUTTON STR INCGeneral Contractor908/26/2026
JEFFREY VULPIS PLMBNG LLCPlumbing507/08/2026
VULPIS & VULPIS PLBG INCFire Protection407/08/2026
A.R. EQUIPMENT LLCGeneral Contractor303/21/2026
I & G GROUP, INCGeneral Contractor309/24/2026
NATIONAL MAINTENANCEScaffold207/08/2026
EMCOR SERVICES NY/NJ INCGeneral Contractor203/21/2026
LARRY ZASSMANElectrical203/21/2026
WCDNY INCGeneral Contractor203/21/2026
KATZ MICHAELElectrical203/21/2026
MICHAEL KATZElectrical203/21/2026
EGL HEATING INCPlumbing107/08/2026
G. C. PLBG & HTG INCPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
QUALITY PIPING, INCFire Protection107/08/2026
BRIAN FLANAGANElectrical103/21/2026
COGEN ELEC'L SERVICES,INCElectrical103/22/2026
EWAN PALMERElectrical103/21/2026
FLANAGAN BRIANElectrical103/21/2026
LOCAL UNION 638Electrical103/21/2026
NTS ELECTRICAL, INCElectrical103/22/2026
TAGLIALATELA, BElectrical103/21/2026
TORRES, HECTORElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES4222902/04/2026
GEIGER ENGINEERING. PC689106/09/2025
URBAN INTEGRATIONS LLC7993106/06/2025
STERLING ENGINEERING SERV1012108/31/2023
DS ENGINEERING SERVICES,1608109/20/2021
MADSEN ENGINEERING5423108/24/2021
MEP INSPECTIONS, INC1102108/24/2021
Building Lifecycle
All (257)Filed (59)Permit Issued (58)Signed Off (10)Facade (FISP) (15)Violation (60)Inspection (19)Objection (6)Special Inspection (30)
09/23/2026
Permit issued — Mechanical Systems
M01438918-S1-MS
09/17/2026
Permit issued — General Construction
M01438918-I1-GC
08/12/2026
Permit issued — General Construction
M01226972-I1-GC
07/27/2026
Violation issued (ECB, open)
Elevators
06/10/2026
Violation issued (ECB, open)
Construction
06/10/2026
Violation issued (ECB, open)
Construction
06/10/2026
Violation issued (ECB, open)
Construction
05/12/2026
Permit issued — Supported Scaffold
M01222906-I1-SF
04/20/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
JACK GREEN
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
03/31/2026
Special inspection requirement — Final
JACK GREEN
03/30/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/18/2026
Objection resolved — Addressed
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_NOV, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
02/12/2026
Objection raised — Admin
02/04/2026
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01219530-P1
01/22/2026
Permit issued — Sidewalk Shed
M00988237-I1-SH
01/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2026
Cycle 9 facade report submitted
01/16/2026
Cycle 9 facade report signed — UNSAFE
01/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
01/04/2026
Special inspection requirement — Final
JACK GREEN
01/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
JACK GREEN
01/01/2026
Cycle 9 facade inspection completed
11/19/2025
Permit issued — Sprinklers
M01219530-S2-EW-SP
11/07/2025
Permit issued — Mechanical Systems
M01219530-S1-MS
11/07/2025
Permit issued — General Construction
M01219530-I1-GC
11/03/2025
Permit issued — General Construction
M00964277-I1-GC
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/09/2025
Violation issued (FDNY_ORDER, closed)
09/09/2025
Violation issued (FDNY_ORDER, closed)
09/09/2025
Violation issued (FDNY_ORDER, closed)
08/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/22/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/13/2025
Permit issued — General Construction
M01226972-I1-GC
07/24/2025
Violation issued (FDNY_NOV, closed)
07/09/2025
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01219530-S1
07/09/2025
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01219530-S2
07/09/2025
Violation issued (ECB, closed)
Construction
07/09/2025
Violation issued (ECB, open)
Construction
07/09/2025
Violation issued (ECB, open)
Construction
07/09/2025
Violation issued (ECB, open)
Construction
07/07/2025
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
M01219530-I1
06/13/2025
Permit issued — Suspended Scaffold
M01236913-I1-SC
06/09/2025
Filed — Alteration
FILING FOR EXTERIOR FACADE REPAIR FOR FLOORS 001-032 AS PER PLANS FILED HEREWITH. EMERGENCY WORK ORDER UNDER NUMBER 010624. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01226972-I1
06/06/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M01236913-I1
06/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
Latest 60 of 257 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedI & G GROUP, INC09/23/2026
DOB NOWGeneral ConstructionPermit IssuedI & G GROUP, INC09/17/2026
DOB NOWGeneral ConstructionPermit IssuedPHOENIX SUTTON STR INC08/12/2026
DOB NOWSupported ScaffoldPermit IssuedPHOENIX SUTTON STR INC05/12/2026
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC01/22/2026
DOB NOWSprinklersPermit IssuedQUALITY PIPING, INC11/19/2025
DOB NOWMechanical SystemsPermit IssuedI & G GROUP, INC11/07/2025
DOB NOWGeneral ConstructionPermit IssuedI & G GROUP, INC11/07/2025
DOB NOWGeneral ConstructionPermit IssuedSHAHEEN CONSTRUCTION CORP11/03/2025
DOB NOWGeneral ConstructionPermit IssuedPHOENIX SUTTON STR INC08/13/2025
DOB NOWSuspended ScaffoldPermit IssuedPHOENIX SUTTON STR, INC06/13/2025
DOB NOWSupported ScaffoldPermit IssuedPHOENIX SUTTON STR INC05/13/2025
DOB NOWPlumbingSigned-offEGL HEATING INC02/04/2025
DOB NOWSprinklersPermit IssuedCAPITOL FIRE SPRINKLER CO01/23/2025
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC01/17/2025
DOB NOWGeneral ConstructionPermit IssuedE AND G MODICA CONTRACTIN01/14/2025
DOB NOWGeneral ConstructionSigned-offWCDNY INC08/15/2024
DOB NOWGeneral ConstructionPermit IssuedA.R. EQUIPMENT LLC03/07/2024
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC01/24/2024
DOB NOWMechanical SystemsSigned-offEMCOR SERVICES NY/NJ INC09/18/2023
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION03/10/2023
DOB NOWSupported ScaffoldSigned-offGE 2A CONSTRUCTION02/15/2023
DOB NOWGeneral ConstructionPermit IssuedE AND G MODICA CONTRACTIN12/08/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC12/05/2022
DOB NOWSprinklersPermit IssuedORBIT SPRINKLER CORP12/05/2022
DOB NOWMechanical SystemsPermit IssuedE AND G MODICA CONTRACTIN11/30/2022
DOB NOWMechanical SystemsPermit IssuedE AND G MODICA CONTRACTIN05/17/2022
DOB NOWGeneral ConstructionPermit IssuedE AND G MODICA CONTRACTIN05/17/2022
DOB NOWGeneral ConstructionPermit IssuedE AND G MODICA CONTRACTIN05/17/2022
DOB NOWSignPermit IssuedNATIONAL MAINTENANCE, INC04/06/2022
DOB NOWSignPermit IssuedNATIONAL MAINTENANCE, INC04/06/2022
DOB NOWGeneral ConstructionPermit IssuedE AND G MODICA CONTRACTIN04/01/2022
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION03/15/2022
DOB NOWSupported ScaffoldSigned-offGE 2A CONSTRUCTION02/14/2022
DOB NOWStructuralPermit IssuedE AND G MODICA CONTRACTIN12/08/2021
DOB NOWSprinklersPermit IssuedVULPIS & VULPIS PLBG INC11/05/2021
DOB NOWMechanical SystemsPermit IssuedE AND G MODICA CONTRACTIN11/01/2021
DOB NOWPlumbingSigned-offJEFFREY VULPIS PLMBNG LLC10/28/2021
DOB NOWStructuralPermit IssuedE AND G MODICA CONTRACTIN10/12/2021
DOB NOWGeneral ConstructionPermit IssuedE AND G MODICA CONTRACTIN10/01/2021
+ 60 more permits on file
4 projects · most recent 11/29/2022
Ventilation Systems Associated Ducts and Piping Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/29/2022Permit IssuedE AND G MODICA CONTRACTINAir Conditioning Systems, Ventilation Systems
Cooling
Daikin DAT12043 120,000 CFM · Ahu ×1
DX11TA1203 120,000 CFM · Condensing Unit ×1
06/14/2022——Associated Ducts and Piping—
05/25/2021Permit IssuedE AND G MODICA CONTRACTINAssociated Ducts and Piping
Ducts & Piping
N/A N/A
02/05/2020——Ventilation Systems—
5 projects · most recent 02/04/2026
Sprinkler System
FiledStatusContractorScope
02/04/2026Permit IssuedQUALITY PIPING, INCSprinkler System
08/19/2022Permit IssuedORBIT SPRINKLER CORP—
06/14/2022——28 heads
04/27/2022——22 heads
05/19/2021Permit IssuedJEFFREY VULPIS PLMBNG LLC31 heads
6 projects · most recent 02/04/2026
Water/Sanitary
FiledStatusContractorScope
02/04/2026———
01/16/2025Signed-offEGL HEATING INCWater/Sanitary
07/05/2022——Water/Sanitary
05/19/2021Signed-offVULPIS & VULPIS PLBG INCWater/Sanitary
05/01/2020Signed-offVULPIS & VULPIS PLBG INCWater/Sanitary
02/05/2020——Water/Sanitary
19 projects · most recent 06/17/2026
General Wiring Lighting
FiledStatusContractorScope
06/17/2026Pending PaymentAUJLA ELECTRIC CORPGeneral Wiring
03/03/2025CompleteSRM ELECTRICAL SVC INC—
01/09/2024Permit IssuedELPO ELECTRICAL CONTG INC—
12/27/2023CompleteANCO ELECTL CONTCTNG INC—
06/02/2023CompleteGEMINI ELECTRIC CO., INC.—
06/02/2023CompleteGEMINI ELECTRIC CO., INC.—
02/14/2022Permit IssuedCOGEN ELEC'L SERVICES,INCGeneral Wiring
01/13/2021CompleteNTS ELECTRICAL, INCGeneral Wiring
09/09/2020CompleteELPO ELECTRICAL CONTG INC—
11/21/2019CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
07/26/2019CompleteELPO ELECTRICAL CONTG INCGeneral Wiring, Lighting
07/18/2019CompleteBOROWIDE ELECT'L CONTR'S—
05/28/2019CompleteNTS ELECTRICAL, INCGeneral Wiring
03/29/2019Permit IssuedNEE ELECTRICAL, LLCGeneral Wiring
11/16/2018CompleteNTS ELECTRICAL, INCGeneral Wiring
1 project · most recent 08/24/2021
Steel Concrete
FiledStatusContractorScope
08/24/2021Permit IssuedE AND G MODICA CONTRACTINSteel, Concrete
2 projects · most recent 05/13/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/13/2025Permit IssuedPHOENIX SUTTON STR INCScaffold
01/23/2024Permit IssuedPHOENIX SUTTON STR INCSidewalk Shed
1 project · most recent 06/06/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/06/2025Permit IssuedPHOENIX SUTTON STR, INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
04/20/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/30/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
01/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/22/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
03/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2022Pass-Final CND-Occupancy InspectionPassView ↗
01/13/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/17/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/05/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2021Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
03/31/2026Fire-Resistant Penetrations and JointsJACK GREENspecial
03/31/2026Fire-Resistance Rated ConstructionJACK GREENprogress
03/31/2026FinalJACK GREENprogress
01/04/2026FinalJACK GREENprogress
01/04/2026Fire-Resistance Rated ConstructionJACK GREENprogress
01/04/2026Fire-Resistant Penetrations and JointsJACK GREENspecial
06/05/2025Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
06/05/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
06/05/2025Post-installed AnchorsDANNY TRUJILLOspecial
05/16/2025Post-installed AnchorsJACK GREENspecial
05/15/2025FinalFADY HABEELprogress
05/15/2025Structural Stability – Alterations of existing buildingsFADY HABEELspecial
05/15/2025MasonryFADY HABEELspecial
05/01/2025Mechanical SystemsJACK GREENspecial
05/01/2025FinalJACK GREENprogress
05/01/2025Sprinkler SystemsJACK GREENspecial
01/09/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
09/20/2024FinalJACK GREENprogress
09/20/2024Sprinkler SystemsJACK GREENspecial
09/20/2024Mechanical SystemsJACK GREENspecial
06/12/2024Interior lighting powerMohamed Shahidenergy_progress
06/12/2024Lighting controlsMohamed Shahidenergy_progress
11/16/2023FinalMohamed Shahidprogress
06/29/2023FinalTHomas DeLorenzoprogress
06/29/2023Mechanical SystemsTHomas DeLorenzospecial
Latest 25 of 68.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Lang SchoolEducationFloor 9, Mezzanine
Project M01219530 Alteration · Permit Entire · 07/07/2025
Project M00596578 Alteration · Permit Entire · 09/20/2021
Project M00337470 Alteration · LOC Issued · 05/15/2020
Project M00337460 Alteration · LOC Issued · 04/27/2020
Project M00337465 Alteration · LOC Issued · 04/27/2020
Office Of Temporary & Disability AssistanceOfficeFloor 15
Project M01114540 Alteration · Permit Entire · 01/10/2025
Citizens BankOfficeGround
Project M00898057 Alteration · LOC Issued · 08/31/2023
Sloss & CineticOfficeFloor 14
Project M00561324 Alteration · LOC Issued · 08/24/2021
Project M00561374 Alteration · Permit Entire · 08/05/2021
Hetrit OrganizationOfficeFloor 14
Project M00487382 Alteration · Permit Entire · 05/19/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 3,035 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch42
09/03/2026M00487390-I1Request digital key ↗
09/03/2026M00487382-I1Request digital key ↗
09/03/2026M00487412-I1Request digital key ↗
Showing 3 of 42 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00267967-I1Request digital key ↗
09/05/2026M00320093-I1Request digital key ↗
09/04/2026M00337470-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00267962-I1Request digital key ↗
09/05/2026M00337460-I1Request digital key ↗
09/05/2026M00320136-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/03/2026M00194892-I1Request digital key ↗
08/15/2026M00194892-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00449696-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00198043-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00337465-I1Request digital key ↗
▸Applications & Permits602
▸BISPLAN / WORK APPROVAL APPLICATION323
02/11/2026122170765Open ↗
02/09/2026122170765Open ↗
02/06/2026122170765Open ↗
Showing 3 of 323 on file for this type
▸BISWORK PERMIT APPLICATION223
05/04/2022140888519Open ↗
01/13/2021123368248Open ↗
01/11/2021123368248Open ↗
Showing 3 of 223 on file for this type
▸DOB NOWLPC Approval/Permit43
09/05/2026M00267967-I1Open ↗
09/04/2026M00337470-I1Open ↗
09/03/2026M00561324-I1Open ↗
Showing 3 of 43 on file for this type
▸BISPLACE OF ASSEMBLY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/19/2020123855408Open ↗
06/19/2020123855408Open ↗
▸Seals & Professional Certifications672
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION355
05/15/2020123832861Open ↗
05/15/2020123832861Open ↗
05/15/2020123832861Open ↗
Showing 3 of 355 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT82
06/19/2020123855408Open ↗
Showing 1 of 82 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST80
01/20/2021123799023Open ↗
06/19/2020123855408Open ↗
Showing 2 of 80 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature59
09/05/2026M00198043-I1Open ↗
09/05/2026M00267967-I1Open ↗
09/04/2026M00337470-I1Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/23/2026M00337470-I1Open ↗
09/23/2026M01219530-S2Open ↗
09/19/2026M01236913-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/23/2026M00337470-I1Open ↗
09/19/2026M01114540-S1Open ↗
09/01/2026M01219530-I1Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment359
▸BISEQUIPMENT USE PERMITS141
04/25/2022121186288Open ↗
Showing 1 of 141 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE64
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 64 on file for this type
▸BISSELF-CERT PLUMBING NOTICE51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISSCHEDULE B - PLUMBING47
04/22/2021123811303Open ↗
01/20/2021123799023Open ↗
Showing 2 of 47 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA22
06/07/2021121275636Open ↗
Showing 1 of 22 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
06/12/2020123558998Open ↗
Showing 1 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos195
▸BISASBESTOS: CERTIFICATION (DEP ACP5)93
06/19/2020123855408Open ↗
06/19/2020123855408Open ↗
05/06/2020123832861Open ↗
Showing 3 of 93 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report44
09/05/2026M00198043-I1Open ↗
09/05/2026M00267967-I1Open ↗
09/04/2026M00337470-I1Open ↗
Showing 3 of 44 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/02/2026M00693006-I1Open ↗
Showing 1 of 6 on file for this type
▸BISASBESTOS INSPECTION REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE8
06/19/2020123855408Open ↗
Showing 1 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Inspections & Test Reports59
▸BISTECHNICAL REPORT: RESPONSIBILITY44
05/12/2021122721108Open ↗
05/03/2021123506401Open ↗
04/28/2021123832861Open ↗
Showing 3 of 44 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Approvals, Objections & Sign-offs379
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST149
03/31/2025120143503Open ↗
03/17/2025122051563Open ↗
03/18/2022123183296Open ↗
Showing 3 of 149 on file for this type
▸BISLANDMARKS APPROVAL110
07/18/2020140894325Open ↗
06/19/2020123855408Open ↗
06/19/2020123855408Open ↗
Showing 3 of 110 on file for this type
▸BISADMINISTRATIVE OBJECTIONS51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE22
02/09/2026122170765Open ↗
05/08/2020122170765Open ↗
05/06/2020122170765Open ↗
Showing 3 of 22 on file for this type
▸BISSUPERSEDING LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISLANDMARKS SIGNOFF8
09/15/2023121291002Open ↗
05/03/2021123504314Open ↗
04/28/2021123832861Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Cost, Insurance & Ownership271
▸BISCOST AFFIDAVIT249
09/08/2021122721108Open ↗
05/03/2021123506401Open ↗
04/28/2021123832861Open ↗
Showing 3 of 249 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW322
03/14/2025120143503Open ↗
03/14/2025122051563Open ↗
08/25/2023121291002Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms301
▸BISEFILING COVER SHEET169
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 169 on file for this type
▸BISADDITIONAL INFORMATION65
02/11/2026122170765Open ↗
01/22/2025110150247Open ↗
09/18/2024122170765Open ↗
Showing 3 of 65 on file for this type
▸BISBOROUGH INTAKE FORM57
05/04/2022140888519Open ↗
08/21/2020123855408Open ↗
06/26/2020123558998Open ↗
Showing 3 of 57 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Other Documents65
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION35
12/08/2025120811997Open ↗
06/13/2025123208279Open ↗
07/30/2020122913428Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProof of Historic Building13
09/02/2026M00691361-I1Open ↗
08/22/2026M01219530-I1Open ↗
08/13/2026M01219530-P1Open ↗
Showing 3 of 13 on file for this type
▸BISUnknown7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations1
08/13/2026M01236913-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01236913-I1Open ↗