26 EAST 55 STREET
BROOKLYN · BIN 3100314
💬 Discuss this project
1945Year Built
1Stories
B1Building Class
R6Zoning
1,767 sfGross Floor Area
2Units
Rent Stabilized19 Open Violations 14 unresolved · 5 paperwork only ▸FDNY Report ↗
Two family brick · Owner of record: 26 PROP HOLDINGS LLC · 2,200 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalFire Protection
Floor 117p · 1 filing · 20 docs
Basement19p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MY IDEAL PROPERTY703/22/2026
FEDERAL NATIONAL MORTGAGE ASSOCIATION203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/25/2024$411K—FEDERAL NATIONAL MORTGAGE ASSOCIATION → 26 PROP HOLDINGS LLC$232/sf building
05/13/2019$509K—Private party → CITIMORTGAGE INC$288/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC402/12/2026
ADVANCE DESIGN GROUP, INC104/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SNB ELECTRICAL CONTNG CORElectrical103/22/2026
DYNAMIC PLBNG & SPRKR CORFire Protection106/28/2026
KISHAN PLUMBING INCGeneral Contractor104/09/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108502/12/2026
Building Lifecycle
All (111)Filed (5)Permit Issued (3)Violation (25)Inspection (14)Objection (34)Special Inspection (30)
08/14/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
sion hourizadeh
03/30/2026
Special inspection requirement — Mechanical Systems
sion hourizadeh
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
03/30/2026
Special inspection requirement — Masonry
sion hourizadeh
03/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
sion hourizadeh
03/30/2026
Special inspection requirement — Final
sion hourizadeh
03/30/2026
Special inspection requirement — Fenestration areas
sion hourizadeh
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
03/30/2026
Special inspection requirement — Metering
sion hourizadeh
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
03/30/2026
Special inspection requirement — Permanent certificate
sion hourizadeh
03/30/2026
Special inspection requirement — Maintenance information
sion hourizadeh
03/30/2026
Special inspection requirement — Fenestration air leakage
sion hourizadeh
03/30/2026
Special inspection requirement — Ventilation and air distribution system
sion hourizadeh
03/30/2026
Special inspection requirement — Interior lighting power
sion hourizadeh
03/30/2026
Special inspection requirement — Insulation placement and R values
sion hourizadeh
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
03/26/2026
Objection resolved — Addressed
03/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
03/16/2026
Special inspection requirement — Maintenance information
sion hourizadeh
03/16/2026
Special inspection requirement — Metering
sion hourizadeh
03/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
03/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
03/16/2026
Special inspection requirement — Permanent certificate
sion hourizadeh
03/03/2026
Objection resolved — Addressed
03/03/2026
Objection resolved — Addressed
02/27/2026
Objection raised — Cost
02/27/2026
Objection raised — Scope
02/27/2026
Objection raised — Scope
02/26/2026
Objection raised — Scope
02/26/2026
Objection resolved — Addressed
02/12/2026
Filed — Alteration CO
INSTALLATION OF AUTOMATIC WET FIRE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
B01163177-P1
02/12/2026
Filed — Alteration CO
INSTALLATION OF AUTOMATIC WET FIRE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
B01163177-P2
02/11/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
02/09/2026
Special inspection requirement — Maintenance information
sion hourizadeh
02/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
02/09/2026
Special inspection requirement — Metering
sion hourizadeh
02/09/2026
Special inspection requirement — Permanent certificate
sion hourizadeh
01/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/28/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/12/2026
Permit issued — Sprinklers
B01163177-S2-EW-SP
12/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/24/2025
Violation issued (HPD, open)
I
08/13/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/01/2025
Permit issued — General Construction
B01163177-I1-GC
07/28/2025
Permit issued — Plumbing
B01163177-S1-PL
04/22/2025
Filed — Alteration CO
INSTALLATION OF AUTOMATIC WET FIRE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
B01163177-S2
04/22/2025
Filed — Alteration CO
INSTALLATION OF AUTOMATIC WET FIRE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
B01163177-S1
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedCITYWIDE PLBG, HTG &SPRKL01/12/2026
DOB NOWGeneral ConstructionPermit IssuedKISHAN PLUMBING INC08/01/2025
DOB NOWPlumbingSigned-offN AND S PLUMBING INC07/28/2025
1 project · most recent 02/12/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/12/2026Permit IssuedKISHAN PLUMBING INCAir Conditioning Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-48AHU 48,000 BTU · Fan Coil Indoor ×2
Ventilation
Panasonic Model #FV-0811RQC1 150 CFM · Exhaust Fan ×10
1 project · most recent 02/12/2026
Sprinkler System
FiledStatusContractorScope
02/12/2026Permit IssuedDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 02/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/12/2026Signed-offKISHAN PLUMBING INCGas, Water/Sanitary
1 project · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026Permit IssuedSNB ELECTRICAL CONTNG CORGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/14/2026Fail-Final CND-Occupancy InspectionFailView ↗
02/11/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/28/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/28/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/15/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/30/2026Fenestration and door U-factor and product ratingssion hourizadehenergy_progress
03/30/2026Mechanical Systemssion hourizadehspecial
03/30/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
03/30/2026Masonrysion hourizadehspecial
03/30/2026Structural Stability – Alterations of existing buildingssion hourizadehspecial
03/30/2026Finalsion hourizadehprogress
03/30/2026Fenestration areassion hourizadehenergy_progress
03/30/2026HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
03/30/2026Meteringsion hourizadehenergy_progress
03/30/2026HVAC-R and service water heating system controlssion hourizadehenergy_progress
03/30/2026Permanent certificatesion hourizadehenergy_progress
03/30/2026Maintenance informationsion hourizadehenergy_progress
03/30/2026Fenestration air leakagesion hourizadehenergy_progress
03/30/2026Ventilation and air distribution systemsion hourizadehenergy_progress
03/30/2026Interior lighting powersion hourizadehenergy_progress
03/30/2026Insulation placement and R valuession hourizadehenergy_progress
03/30/2026HVAC-R and service water heating equipmentsion hourizadehenergy_progress
03/16/2026HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
03/16/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
03/16/2026Maintenance informationsion hourizadehenergy_progress
03/16/2026Meteringsion hourizadehenergy_progress
03/16/2026HVAC-R and service water heating system controlssion hourizadehenergy_progress
03/16/2026HVAC-R and service water heating equipmentsion hourizadehenergy_progress
03/16/2026Permanent certificatesion hourizadehenergy_progress
02/09/2026HVAC-R and service water heating equipmentsion hourizadehenergy_progress
Latest 25 of 33.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01163177-S2Request digital key ↗
08/21/2026B01163177-S1Request digital key ↗
08/15/2026B01163177-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01163177-P1Open ↗
08/13/2026B01163177-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature7
09/15/2026B01163177-I1Open ↗
09/15/2026B01163177-I1Open ↗
09/15/2026B01163177-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/15/2026B01163177-I1Open ↗
09/15/2026B01163177-I1Open ↗
09/15/2026B01163177-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01163177-S2Open ↗
08/21/2026B01163177-S1Open ↗
08/21/2026B01163177-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026B01163177-I1Open ↗
08/15/2026B01163177-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026B01163177-S1Open ↗
08/21/2026B01163177-S2Open ↗
08/15/2026B01163177-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/15/2026B01163177-I1Open ↗
08/15/2026B01163177-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01163177-I1Open ↗