← Back
BuildNYC
Three families
26 HAMILTON TERRACE
MANHATTAN · BIN 1060974
💬 Discuss this project
1898Year Built
3Stories
C0Building Class
R6AZoning
3,840 sfGross Floor Area
3Units
2 Active Violations ▸
Three families · 1,600 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brian McDonough, PE208/10/2026
Damaris Marie Jemmot, RA107/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
McDonough Engineering Pra9377208/10/2026
Building Lifecycle
10/05/2026
Objection raised — Energy
09/04/2026
Objection resolved — Resolved
08/13/2026
Objection raised — Scope
08/13/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Admin
24 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 08/10/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
08/10/2026——Heating and Air Conditioning Systems
1 project · most recent 08/10/2026
Water/Sanitary
FiledStatusContractorScope
08/10/2026——Water/Sanitary
1 project · most recent 09/14/2026
General Wiring
FiledStatusContractorScope
09/14/2026Permit IssuedTower Fire & Electric ServicesGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/10/2026Fire-Resistant Penetrations and Joints—special
07/29/2026HVAC-R and service water piping design and insulation—energy_progress
07/29/2026Maintenance information—energy_progress
07/29/2026Ventilation and air distribution system—energy_progress
07/29/2026HVAC-R and service water heating equipment—energy_progress
07/29/2026HVAC-R and service water heating system controls—energy_progress
07/29/2026Duct leakage testing, insulation and design—energy_progress
07/24/2026Energy Code Compliance Inspections—progress
07/16/2026Structural Stability – Alterations of existing buildings—special
05/15/2026Mechanical Systems—special
05/15/2026Final—progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account