One family attached or semi-detached
26 MC KEE AVENUE
STATEN ISLAND · BIN 5175836
💬 Discuss this project
2023Year Built
2Stories
A5Building Class
R3-1Zoning
1,478 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,500 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 224p · 1 filing · 20 docs
Floor 122p · 1 filing · 20 docs
Cellar23p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PORTO CONSTRUCTION2907/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PORTO CONSTRUCTION,LLCGeneral Contractor1007/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
CHARLES J. DEHART JR P&HPlumbing207/08/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/26/2024
A TECH ENGINEERING NYC, P6738504/16/2024
Building Lifecycle
All (99)Filed (9)Permit Issued (7)Signed Off (6)Violation (1)Inspection (14)Objection (32)Special Inspection (30)
11/18/2024
Signed off — Alteration
S01097584-I1
09/06/2024
Permit issued — Solar
S01097584-I1-SL
08/26/2024
Filed — Alteration
S01097584-I1
05/07/2024
Signed off — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00787175-I1
04/16/2024
Filed — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00787175-P4
04/15/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/15/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
04/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/15/2024
Special inspection requirement — Heating Systems
anthony santoro
04/15/2024
Special inspection requirement — Masonry
anthony santoro
04/15/2024
Special inspection requirement — Mechanical Systems
anthony santoro
04/15/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
04/15/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
04/15/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
anthony santoro
04/15/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
04/15/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/15/2024
Special inspection requirement — Final
anthony santoro
04/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
04/15/2024
Special inspection requirement — Footing and Foundation
anthony santoro
04/15/2024
Special inspection requirement — Structural Wood Frame
anthony santoro
04/15/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
04/15/2024
Special inspection requirement — Fenestration areas
anthony santoro
04/15/2024
Special inspection requirement — Air barrier — testing
anthony santoro
04/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/15/2024
Special inspection requirement — Permanent certificate
anthony santoro
04/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/15/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
04/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/15/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
04/15/2024
Special inspection requirement — Interior lighting power
anthony santoro
04/15/2024
Special inspection requirement — Shutoff dampers
anthony santoro
04/15/2024
Special inspection requirement — Maintenance information
anthony santoro
04/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection resolved — Addressed
02/16/2024
Signed off — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00787175-S1
02/16/2024
Objection raised — Other
02/16/2024
Objection raised — Structural
01/31/2024
Filed — New Building
APPLICATION IS FILED A NEW 2-STORY, 1-FAMILY, SEMI-ATACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EACH LOT. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00787175-P3
12/27/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00804603-I1
12/21/2023
Signed off — Alteration
S00787109-I1
12/20/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/15/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
11/10/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
11/01/2023
Signed off — Alteration
APP IS FILED FOR THE INSTALLATION OF 8.0' HIGH TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH PROPOSED NEW 2 STORY FRAME BLDG. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILLED UNDER THE APP
S08024440-I1
10/30/2023
Permit issued — Construction Fence
S08024440-I1-FN
10/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/26/2023
Permit issued — Curb Cut
S00787109-I1-CC
09/28/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/15/2023
Permit issued — Foundation
S00787175-I1-GC-CX
08/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
07/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC09/06/2024
DOB NOWConstruction FenceSigned-offPORTO CONSTRUCTION,LLC10/30/2023
DOB NOWCurb CutSigned-offPORTO CONSTRUCTION,LLC10/26/2023
DOB NOWFoundationPermit IssuedPORTO CONSTRUCTION,LLC08/15/2023
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H04/11/2023
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H04/04/2023
DOB NOWGeneral ConstructionPermit IssuedPORTO CONSTRUCTION,LLC02/24/2023
1 project · most recent 04/16/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/16/2024Permit IssuedPORTO CONSTRUCTION,LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Comfort Aire MCG3036PB4P 3 tons ×2
Heating
Navien NCB-240 120,000 BTU · Boiler ×2
Ventilation
N/A n/a 125 BTU ×8
1 project · most recent 04/16/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/16/2024Signed-offCHARLES J. DEHART JR P&HGas, Storm, Water/Sanitary
2 projects · most recent 08/26/2024
General Wiring
FiledStatusContractorScope
08/26/2024CompleteSUNRUN SOLAR ELECTL CORP—
06/02/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
1 project · most recent 04/16/2024
Wood
FiledStatusContractorScope
04/16/2024Permit IssuedPORTO CONSTRUCTION,LLCWood
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/15/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
11/10/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/28/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
04/15/2024Energy Code Compliance Inspectionsanthony santoroprogress
04/15/2024Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
04/15/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
04/15/2024Heating Systemsanthony santorospecial
04/15/2024Masonryanthony santorospecial
04/15/2024Mechanical Systemsanthony santorospecial
04/15/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
04/15/2024Subgrade Inspectionsanthony santorospecial
04/15/2024Subsurface Conditions – Fill Placement & In-Place Densityanthony santorospecial
04/15/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/15/2024Concrete - Cast-In-Placeanthony santorospecial
04/15/2024Finalanthony santoroprogress
04/15/2024Fire-Resistance Rated Constructionanthony santoroprogress
04/15/2024Footing and Foundationanthony santoroprogress
04/15/2024Structural Wood Frameanthony santoroprogress
04/15/2024Insulation placement and R valuesanthony santoroenergy_progress
04/15/2024Fenestration areasanthony santoroenergy_progress
04/15/2024Air barrier — testing anthony santoroenergy_progress
04/15/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
04/15/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
04/15/2024Permanent certificateanthony santoroenergy_progress
04/15/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
04/15/2024Fenestration air leakageanthony santoroenergy_progress
04/15/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
04/15/2024Air barrier - visual inspectionanthony santoroenergy_progress
Latest 25 of 44.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026S00787175-P2Request digital key ↗
08/23/2026S00787175-S1Request digital key ↗
08/23/2026S00787175-P4Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
01/06/2023540236449Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/19/2022540236449Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00787175-P3Open ↗
08/13/2026S00787175-P4Open ↗
08/13/2026S00787175-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00787175-P4Open ↗
08/13/2026S00787175-P3Open ↗
08/13/2026S00787175-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/06/2023540236449Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00787175-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026S00787175-P4Open ↗
08/23/2026S00787175-P3Open ↗
08/23/2026S00787175-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026S00787175-P4Open ↗
08/29/2026S00787175-P4Open ↗
08/29/2026S00787175-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026S00787175-P4Open ↗
08/29/2026S00787175-P4Open ↗
08/25/2026S00787175-P2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/19/2022540236449Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/19/2022540236449Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00787175-I1Open ↗
08/13/2026S00787175-P3Open ↗
08/13/2026S00787175-P4Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00787175-P3Open ↗
08/13/2026S00787175-I1Open ↗
08/13/2026S00787175-P4Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00787175-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00787175-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00787175-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00787175-P4Open ↗
08/13/2026S00787175-P3Open ↗
08/13/2026S00787175-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/19/2022540236449Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00787175-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/06/2023540236449Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01097584-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/19/2022540236449Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026S00787175-P3Open ↗
08/13/2026S00787175-I1Open ↗
08/13/2026S00787175-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00787175-I1Open ↗
08/13/2026S00787175-P4Open ↗
08/13/2026S00787175-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026S00787175-P4Open ↗
08/15/2026S00787175-P3Open ↗
08/14/2026S00787175-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/06/2023540236449Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00787175-I1Open ↗