← Back
Elevator apt, fireproof without stores
26 QUINCY STREET
BROOKLYN · Clinton Hill · BIN 3429057
💬 Discuss this project
2020Year Built
5Stories
D3Building Class
R6BZoning
37,376 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized15 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 26 QUINCY LLC · 11,420 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof2p · 3 filings · 20 docs
Floor 53p · 2 filings · 20 docs
Floor 46p · 3 filings · 20 docs
Floor 33p · 2 filings · 15 docs
Floor 23p · 2 filings · 15 docs
Floor 12p · 2 filings · 15 docs
Cellar2p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
18 SPENCER LLC2103/22/2026
26 QUINCY LLC103/22/2026
B CONTRACTORS GROUP1203/21/2026
QUINCY STREET INVESTORS703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC708/09/2021
EDWARD C. HICKS RA104/19/2021
FL&M ENGINEERING DESIGN &INSPECTION103/08/2021
ASIF JAMIL, RA409/30/2020
KZ ENGINEERING, P.C102/25/2020
A&B WORLD CONSULTING102/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES703/21/2026
GREEN STUDIO603/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
LEVIN ENGINEERING PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B CONTRACTORS GROUP LLCGeneral Contractor503/22/2026
ARYEH YARMARKElectrical103/21/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
PRIME PIPING & HEATING INPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394708/09/2021
A&B WORLD CONSULTING, INC5704102/11/2020
Building Lifecycle
All (80)Filed (15)Permit Issued (1)Signed Off (9)Violation (31)Inspection (3)Special Inspection (21)
09/08/2026
Violation issued (HPD, open)
B
09/08/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, open)
C
07/05/2026
Violation issued (HPD, open)
C
06/16/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
05/30/2024
Violation issued (FDNY_NOV, closed)
02/01/2024
Violation issued (FDNY_NOV, closed)
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/04/2022
Violation issued (FDNY_NOV, closed)
09/28/2022
Violation issued (FDNY_NOV, closed)
09/28/2022
Violation issued (FDNY_NOV, closed)
09/28/2022
Violation issued (FDNY_NOV, closed)
09/28/2022
Violation issued (FDNY_NOV, closed)
09/28/2022
Violation issued (FDNY_NOV, closed)
09/01/2022
Violation issued (FDNY_NOV, closed)
06/23/2022
Violation issued (FDNY_NOV, closed)
06/03/2022
Violation issued (HPD, open)
B
06/03/2022
Violation issued (HPD, open)
B
05/26/2022
Violation issued (HPD, open)
A
05/26/2022
Violation issued (HPD, open)
A
03/10/2022
Violation issued (HPD, closed)
A
02/22/2022
Signed off — Alteration
B00502121-I1
02/19/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/20/2021
Signed off — Alteration
B00303106-I1
09/17/2021
Signed off — Alteration
INSTALLATION OF SPRINKLER AND STANDPIPE WITH PLUMBING ON THE MAIN IN CONJUNCTION WITH NEW BUILDING APPLICATION # 321385078. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00292908-I1
09/14/2021
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT FILING TO PLUMBING APPLICATION IN CONJUNCTION WITH NEW BUILDING APPLICATION #321385078 .NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00274162-I1
09/14/2021
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/01/2021
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT FILING TO PLUMBING APPLICATION IN CONJUNCTION WITH NEW BUILDING APPLICATION #321385078 .NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00274162-S1
08/13/2021
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/10/2021
Special inspection requirement — Sprinkler Systems
Paul Raymond
08/10/2021
Special inspection requirement — Standpipe Systems
Paul Raymond
08/09/2021
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT FILING TO PLUMBING APPLICATION IN CONJUNCTION WITH NEW BUILDING APPLICATION #321385078 .NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00274162-P3
08/05/2021
Filed — Alteration
INSTALLATION OF SPRINKLER AND STANDPIPE WITH PLUMBING ON THE MAIN IN CONJUNCTION WITH NEW BUILDING APPLICATION # 321385078. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00292908-P1
08/04/2021
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
08/04/2021
Special inspection requirement — Maintenance information
Paul Raymond
08/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/04/2021
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
07/14/2021
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
07/14/2021
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
07/14/2021
Special inspection requirement — Maintenance information
Paul Raymond
07/08/2021
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT FILING TO PLUMBING APPLICATION IN CONJUNCTION WITH NEW BUILDING APPLICATION #321385078 .NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00274162-P2
06/29/2021
Special inspection requirement — Standpipe Systems
Paul Raymond
06/29/2021
Special inspection requirement — Sprinkler Systems
Paul Raymond
06/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/22/2021
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT FILING TO PLUMBING APPLICATION IN CONJUNCTION WITH NEW BUILDING APPLICATION #321385078 .NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00274162-P1
06/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/08/2021
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00348783-I1
06/08/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00349058-I1
06/08/2021
Signed off — Alteration
B00319775-I1
06/08/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS, SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES TO USE, EGRESS AND OCCUPANCY.
B00481982-I1
06/04/2021
Violation issued (ECB, closed)
Construction
06/04/2021
Violation issued (ECB, closed)
Construction
05/24/2021
Permit issued — Curb Cut
B00502121-I1-CC
04/19/2021
Filed — Alteration
B00502121-I1
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offB CONTRACTORS GROUP LLC05/24/2021
BIS—ISSUEDB CONTRACTORS GROUP LLC04/05/2021
BIS—ISSUEDB CONTRACTORS GROUP LLC05/05/2020
5 projects · most recent 07/25/2024
General Wiring
FiledStatusContractorScope
07/25/2024CompleteNET POWER ELECTRIC CORPGeneral Wiring
07/28/2021CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
02/10/2021CompleteTUXEDO ELEC'L CONTR'G INC—
03/03/2020CompleteHIVOLTS ELECTRICAL INC—
02/19/2020CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/19/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
09/14/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
08/13/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/10/2021Sprinkler SystemsPaul Raymondspecial
08/10/2021Standpipe SystemsPaul Raymondspecial
08/04/2021HVAC-R and service water heating equipmentPaul Raymondenergy_progress
08/04/2021Maintenance informationPaul Raymondenergy_progress
08/04/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
08/04/2021HVAC-R and service water heating system controlsPaul Raymondenergy_progress
07/14/2021HVAC-R and service water heating equipmentPaul Raymondenergy_progress
07/14/2021HVAC-R and service water heating system controlsPaul Raymondenergy_progress
07/14/2021Maintenance informationPaul Raymondenergy_progress
06/29/2021Standpipe SystemsPaul Raymondspecial
06/29/2021Sprinkler SystemsPaul Raymondspecial
06/28/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/17/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/08/2021FinalFADY HABEELprogress
09/30/2020Finalasif jamilprogress
08/26/2020Finalasif jamilprogress
01/09/2020Maintenance informationPaul Raymondenergy_progress
01/09/2020HVAC and service water heating system controls Paul Raymondenergy_progress
01/09/2020HVAC and service water heating equipment Paul Raymondenergy_progress
01/08/2020FinalPaul Raymondprogress
01/08/2020Mechanical SystemsPaul Raymondspecial
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch - Plumbing6
09/02/2026B00274162-P1Request digital key ↗
09/02/2026B00274162-I1Request digital key ↗
09/02/2026B00292908-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026B00319775-I1Request digital key ↗
09/02/2026B00349058-I1Request digital key ↗
08/15/2026B00349058-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/02/2026B00292908-I1Request digital key ↗
09/02/2026B00303106-I1Request digital key ↗
08/15/2026B00292908-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
09/02/2026B00292908-I1Request digital key ↗
08/15/2026B00292908-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/02/2026B00348783-I1Request digital key ↗
08/15/2026B00348783-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/01/2026B00481982-I1Request digital key ↗
09/01/2026B00502121-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00274162-S1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION10
06/30/2021321385078Open ↗
06/29/2021321385078Open ↗
04/23/2021340807292Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/03/2021321385078Open ↗
▸BISWORK PERMIT APPLICATION1
05/05/2020321385078Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/24/2021340807292Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
08/18/2020321385078Open ↗
10/31/2019321385078Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/02/2019321385078Open ↗
▸BISVERIFY TAX LOT1
07/16/2021321385078Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
10/02/2019321385078Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/16/2021321385078Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/02/2019321385078Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00502121-I1Open ↗
08/13/2026B00348783-I1Open ↗
08/13/2026B00292908-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00274162-P2Open ↗
08/27/2026B00274162-P3Open ↗
08/25/2026B00274162-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/04/2026B00349058-I1Open ↗
08/27/2026B00348783-I1Open ↗
08/25/2026B00274162-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/06/2020321385078Open ↗
04/23/2020321385078Open ↗
04/23/2020321385078Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/24/2021340807292Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/24/2021340807292Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
09/02/2021321385078Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
08/11/2021321385078Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST5
06/25/2021340807292Open ↗
06/25/2021340807292Open ↗
06/25/2021340807292Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN2
06/09/2021340807292Open ↗
06/09/2021340807292Open ↗
▸BISSTREET TREES SITE PLAN1
03/07/2022321385078Open ↗
▸BISSTREET TREE SIGNOFF1
08/11/2021321385078Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00303106-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/23/2021321385078Open ↗
08/23/2021321385078Open ↗
08/11/2021321385078Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/06/2020321385078Open ↗
04/23/2020321385078Open ↗
04/23/2020321385078Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/11/2021321385078Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
09/02/2021321385078Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00274162-S1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00274162-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/11/2021321385078Open ↗
08/11/2021321385078Open ↗
07/29/2021321385078Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/11/2021321385078Open ↗
04/23/2020321385078Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/23/2020321385078Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/23/2020321385078Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
07/06/2020321385078Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/09/2022321385078Open ↗
09/02/2021321385078Open ↗
07/13/2021321385078Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
06/30/2021321385078Open ↗
06/29/2021321385078Open ↗
09/20/2019321385078Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
02/21/2022321385078Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
02/21/2022321385078Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/19/2021340807292Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/23/2020321385078Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/21/2022321385078Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION20
09/02/2021321385078Open ↗
08/25/2021321385078Open ↗
08/11/2021321385078Open ↗
Showing 3 of 20 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/24/2021340807292Open ↗
▸BISEFILING COVER SHEET1
12/10/2018321385078Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/24/2021340807292Open ↗
▸Other Documents3
▸BISSITE SURVEY: FINAL1
—321385078Open ↗
▸BISSITE SURVEY: INITIAL1
—321385078Open ↗
▸BISPLOT DIAGRAM1
06/09/2020321385078Open ↗