← Back
BuildNYC
Elevator apt, fireproof without stores
26 QUINCY STREET
BROOKLYN · Clinton Hill · BIN 3429057
💬 Discuss this project
2020Year Built
5Stories
D3Building Class
R6BZoning
37,376 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized8 Active Violations 3 old, status unconfirmed ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 26 Quincy · 11,420 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof18 Spencer LLC37p · 3 filings · 20 docs
Floor 518 Spencer LLC38p · 2 filings · 20 docs
Floor 418 Spencer LLC42p · 3 filings · 20 docs
Floor 318 Spencer LLC39p · 3 filings · 20 docs
Floor 218 Spencer LLC39p · 3 filings · 20 docs
Floor 118 Spencer LLC41p · 4 filings · 20 docs
Cellar18 Spencer LLC38p · 3 filings · 20 docs
Site & exterior18 Spencer LLC57p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
18 Spencer2103/22/2026
Quincy Street Investors703/21/2026
26 Quincy103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Levin Engineering708/09/2021
Edward C. Hicks RA104/19/2021
FL&M Engineering Design & Inspection103/08/2021
Asif Jamil, RA409/30/2020
KZ Engineering102/25/2020
A&B World Consulting102/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Builders Services703/21/2026
Green Studio603/21/2026
Synergy Building Consultants103/21/2026
Levin Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B Contractors GroupGeneral Contractor603/22/2026
Net Power ElectricElectrical103/21/2026
V. Vass ElectricElectrical103/22/2026
Prime Piping & HeatingPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394708/09/2021
A&B World Consulting5704102/11/2020
Building Lifecycle
09/28/2026
Elevator Category 1 inspection report filed
09/08/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL, AND AROUND DOOR TO BALCONY IN THE 1st ROOM…
HPD violation · open
06/22/2026
Elevator Category 5 inspection report filed
06/16/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
11/29/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
76 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offB Contractors Group05/24/2021
BIS—ISSUEDB Contractors Group04/05/2021
BIS—ISSUEDB Contractors Group05/05/2020
5 projects · most recent 07/25/2024
General Wiring
FiledStatusContractorScope
07/25/2024CompleteNet Power ElectricGeneral Wiring
07/28/2021CompleteHivolts ElectricalGeneral Wiring
02/10/2021CompleteTuxedo Electrical Contracting—
03/03/2020CompleteHivolts Electrical—
02/19/2020CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/19/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
09/14/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
08/13/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/10/2021Standpipe SystemsPaul Raymondspecial
08/10/2021Sprinkler SystemsPaul Raymondspecial
08/04/2021HVAC-R and service water heating system controlsPaul Raymondenergy_progress
08/04/2021HVAC-R and service water heating equipmentPaul Raymondenergy_progress
08/04/2021Maintenance informationPaul Raymondenergy_progress
08/04/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/14/2021Maintenance informationPaul Raymondenergy_progress
07/14/2021HVAC-R and service water heating system controlsPaul Raymondenergy_progress
07/14/2021HVAC-R and service water heating equipmentPaul Raymondenergy_progress
06/29/2021Standpipe SystemsPaul Raymondspecial
06/29/2021Sprinkler SystemsPaul Raymondspecial
06/28/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/17/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/08/2021FinalFADY HABEELprogress
09/30/2020Finalasif jamilprogress
08/26/2020Finalasif jamilprogress
01/09/2020Maintenance informationPaul Raymondenergy_progress
01/09/2020HVAC and service water heating system controls Paul Raymondenergy_progress
01/09/2020HVAC and service water heating equipment Paul Raymondenergy_progress
01/08/2020FinalPaul Raymondprogress
01/08/2020Mechanical SystemsPaul Raymondspecial
144 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account