← Back
City residence, one family
26 VERANDAH PLACE
BROOKLYN · BIN 3003224
💬 Discuss this project
1862Year Built
3Stories
A4Building Class
R6Zoning
3,078 sfGross Floor Area
1Units
0 Open Violations
City residence, one family · Owner of record: BOOT AND SHOE HOUSE LLC · 1,250 sf lot · 2.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 1 filing · 20 docs
Floor 3Under Construction26p · 1 filing · 20 docs
Floor 2Under Construction27p · 1 filing · 20 docs
Floor 1Under Construction25p · 1 filing · 20 docs
1 job · most recent 10/03/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/03/2025Permit IssuedAC SOLUTION SERVICES LLCHeating and Air Conditioning Systems
Heat / Cool
Samsung AM060FCMDCG/AA 60,000 BTU · Vrf Outdoor ×3
1 job · most recent 10/03/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/03/2025——Gas, Storm, Water/Sanitary
1 job · most recent 04/28/2026
FiledStatusContractorScope
04/28/2026Permit IssuedTACTICAL ELECTRIC INC—
1 job · most recent 10/03/2025
Steel Masonry Wood
FiledStatusContractorScope
10/03/2025Permit IssuedAC SOLUTION SERVICES LLCSteel, Masonry, Wood
1 job · most recent 08/14/2026
Scaffold
FiledStatusContractorScope
08/14/2026Permit IssuedANDAMIO SCAFFOLDING LLCScaffold
Building Lifecycle
All (45)Filed (7)Permit Issued (6)Violation (2)Inspection (2)Objection (12)Special Inspection (16)
09/09/2026
Permit issued — Protection and Mechanical Methods
B01454575-I1-PMM
08/14/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01357299-P2
07/30/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/10/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01357299-P1
06/15/2026
Permit issued — Mechanical Systems
B01281782-S2-MS
05/04/2026
Permit issued — General Construction
B01281782-I1-GC
04/22/2026
Permit issued — Structural
B01281782-S1-ST
04/21/2026
Permit issued — General Construction
B01281782-I1-GC
02/10/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01357299-I1
02/10/2026
Permit issued — Supported Scaffold
B01357299-I1-SF
01/30/2026
Objection resolved — Addressed
01/30/2026
Objection resolved — Addressed
01/30/2026
Objection resolved — Addressed
01/30/2026
Objection resolved — Addressed
01/19/2026
Objection resolved — Addressed
01/19/2026
Objection resolved — Addressed
10/17/2025
Objection raised — Admin
10/17/2025
Objection raised — Admin
10/17/2025
Objection raised — Admin
10/17/2025
Objection raised — Plumbing
10/08/2025
Objection raised — Admin
10/08/2025
Objection raised — Admin
10/03/2025
Filed — Alteration
Modification to HVAC system as per plans filed herewith.
B01281782-S1
10/03/2025
Filed — Alteration
Modification to HVAC system as per plans filed herewith.
B01281782-I1
10/03/2025
Filed — Alteration
Modification to HVAC system as per plans filed herewith.
B01281782-S2
10/03/2025
Filed — Alteration
Modification to HVAC system as per plans filed herewith.
B01281782-S3
10/03/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Chimneys and vents
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Masonry
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Structural Steel - High Strength Bolting
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Structural Steel - Welding
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Wood – Prefabricated I-Joists
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Masonry
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Structural Steel - Details
TENZIN NYANDAK
09/30/2025
Special inspection requirement — Post-installed Anchors
TENZIN NYANDAK
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
09/04/2025
Special inspection requirement — Final
TENZIN NYANDAK
09/04/2025
Special inspection requirement — Final
TENZIN NYANDAK
10/23/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REIDBUILD CONSULTANCY709/10/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2022$6.3M—— → —$2,047/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor409/10/2026
REIDBUILD CONSULTANCY LLCGeneral Contractor307/08/2026
AC SOLUTION SERVICES LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STUDIO NYANDAK ARCHITECTU8378410/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedANDAMIO SCAFFOLDING LLC09/09/2026
DOB NOWMechanical SystemsPermit IssuedAC SOLUTION SERVICES LLC06/15/2026
DOB NOWGeneral ConstructionPermit IssuedREIDBUILD CONSULTANCY LLC05/04/2026
DOB NOWStructuralPermit IssuedREIDBUILD CONSULTANCY LLC04/22/2026
DOB NOWGeneral ConstructionPermit IssuedREIDBUILD CONSULTANCY LLC04/21/2026
DOB NOWSupported ScaffoldPermit IssuedANDAMIO SCAFFOLDING LLC02/10/2026
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/30/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/03/2025Construction Utilizing CLT or SCL, Type IVTENZIN NYANDAKspecial
09/30/2025Chimneys and ventsTENZIN NYANDAKspecial
09/30/2025Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
09/30/2025MasonryTENZIN NYANDAKspecial
09/30/2025Fire-Resistance Rated ConstructionTENZIN NYANDAKprogress
09/30/2025Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
09/30/2025Structural Steel - High Strength BoltingTENZIN NYANDAKspecial
09/30/2025Structural Steel - WeldingTENZIN NYANDAKspecial
09/30/2025Wood – Prefabricated I-JoistsTENZIN NYANDAKspecial
09/30/2025Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
09/30/2025MasonryTENZIN NYANDAKspecial
09/30/2025Structural Steel - DetailsTENZIN NYANDAKspecial
09/30/2025Post-installed AnchorsTENZIN NYANDAKspecial
09/05/2025Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
09/04/2025FinalTENZIN NYANDAKprogress
09/04/2025FinalTENZIN NYANDAKprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01281782-S1Request digital key ↗
08/20/2026B01281782-I1Request digital key ↗
08/20/2026B01281782-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B01281782-S1Open ↗
08/13/2026B01281782-S2Open ↗
08/13/2026B01281782-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026B01357299-P1Open ↗
08/18/2026B01357299-I1Open ↗
08/18/2026B01357299-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01281782-S1Open ↗
08/22/2026B01281782-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01281782-S1Open ↗
08/22/2026B01281782-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/20/2026B01281782-I1Open ↗
08/20/2026B01281782-S3Open ↗
08/20/2026B01281782-S2Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B01281782-I1Open ↗