← Back
Predominantly retail with other uses
26 WEST 28 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1015700
💬 Discuss this project
1930Year Built
3Stories
K4Building Class
M1-8A/R12Zoning
19,600 sfGross Floor Area
10Units
3 Open Violations ▸
Predominantly retail with other uses · 4,938 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalEquipmentGeneral
Roof2p · 1 filing · 10 docs
Floor 23p · 1 filing · 10 docs
Floor 1
Cellar1p · 1 filing · 2 docs
Site & exterior3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUL & G CONTRACTING INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MURTAZA & KHOKHAR CONSULTING212/18/2019
POLY ENGINEER PC109/18/2019
ASHRAF CORP104/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SM DESIGN CONSTRUCTION203/21/2026
DANICO SERVICES203/21/2026
TOWER CONSULTING ENGINEERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUL & G CONTRACTING INCGeneral Contractor303/21/2026
HINKE, WILLIAMElectrical103/21/2026
JACKUS, STEVEElectrical103/21/2026
VALERY TSIRULNIKElectrical103/21/2026
FOUR STREETS COOL AIR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
POLY ENGINEER, P.C.6110109/18/2019
Building Lifecycle
All (52)Filed (4)Permit Issued (2)Signed Off (1)Violation (32)Objection (6)Special Inspection (7)
08/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/19/2019
Signed off — Alteration
Replace existing 2 split system units with new in same location. Indoor units are on 2nd floor, condensing outdoor units on the roof. Ductwork, dunnage and piping existing. No change in use egress or occupancy.
M00221917-I1
12/19/2019
Objection raised — Other
12/19/2019
Objection resolved — Addressed
12/19/2019
Objection raised — Structural
12/19/2019
Objection resolved — Addressed
12/18/2019
Filed — No Work
M00283899-I1
10/24/2019
Permit issued — Mechanical Systems
M00221917-I1-MS
10/01/2019
Objection resolved — Addressed
10/01/2019
Special inspection requirement — HVAC insulation and sealing
De Gao
09/30/2019
Objection raised — Other
09/18/2019
Filed — Alteration
Replace existing 2 split system units with new in same location. Indoor units are on 2nd floor, condensing outdoor units on the roof. Ductwork, dunnage and piping existing. No change in use egress or occupancy.
M00221917-I1
09/17/2019
Filed — No Work
M00228324-I1
09/05/2019
Special inspection requirement — Energy Code Compliance Inspections
De Gao
09/05/2019
Special inspection requirement — HVAC and service water heating equipment
De Gao
09/05/2019
Special inspection requirement — HVAC and service water heating system controls
De Gao
09/05/2019
Special inspection requirement — Maintenance information
De Gao
09/04/2019
Special inspection requirement — Mechanical Systems
De Gao
09/04/2019
Special inspection requirement — Final
De Gao
06/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/03/2019
Permit issued — Sidewalk Shed
M00155774-I1-SH
04/23/2019
Filed — Alteration
M00155774-I1
08/30/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/15/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/01/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/08/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/29/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/20/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/27/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/21/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/29/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/02/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/28/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/28/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/04/2006
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
09/06/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/22/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/28/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/21/2003
Violation issued (ECB, closed)
Elevators
02/19/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/02/2001
Violation issued (ECB, closed)
Elevators
07/18/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/13/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/08/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/15/1999
Violation issued (ECB, closed)
Elevators
05/20/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/03/1999
Violation issued (ECB, closed)
Construction
04/18/1997
Violation issued (ECB, closed)
Construction
07/16/1991
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFOUR STREETS COOL AIR INC10/24/2019
DOB NOWSidewalk ShedPermit IssuedGUL & G CONTRACTING INC06/03/2019
BISPLISSUEDCROSSFIELD PLBG.&HTG06/25/2019
BISMHISSUEDDELUXE CORP05/23/2019
BISPLISSUEDC.R.U. MECHAN & HEAT INC12/05/2017
BISOTISSUEDMARCO POLO DESIGN CORP07/18/2013
BISPLISSUEDMARCO POLO PLBG & HTG INC07/18/2013
BISOTISSUEDH H BUILD CONSUL04/04/2005
BISMHISSUEDDUN-RITE COMMERICAL CORP01/19/1999
3 projects · most recent 10/22/2023
General Wiring
FiledStatusContractorScope
10/22/2023Permit IssuedSTAR ELEC'L CONTRACTORS C—
03/17/2020CancelledARC POWER ELECL CONTS INCGeneral Wiring
04/17/2019Permit IssuedWCK ELECTRIC CORP.—
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/01/2019HVAC insulation and sealing De Gaoenergy_progress
09/05/2019Energy Code Compliance InspectionsDe Gaoprogress
09/05/2019HVAC and service water heating equipment De Gaoenergy_progress
09/05/2019HVAC and service water heating system controls De Gaoenergy_progress
09/05/2019Maintenance informationDe Gaoenergy_progress
09/04/2019Mechanical SystemsDe Gaospecial
09/04/2019FinalDe Gaoprogress
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
09/05/2026M00228324-I1Request digital key ↗
08/15/2026M00283899-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00221917-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00155774-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION12
03/25/2019123708979Open ↗
12/22/2017123266367Open ↗
12/22/2017123266367Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION8
06/25/2019123708979Open ↗
06/25/2019123708979Open ↗
05/24/2019123708979Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026M00221917-I1Open ↗
08/29/2026M00221917-I1Open ↗
08/29/2026M00221917-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/13/2020123708979Open ↗
03/25/2019123708979Open ↗
12/06/2017123266367Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/05/2026M00221917-I1Open ↗
09/05/2026M00283899-I1Open ↗
08/13/2026M00155774-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/06/2017123266367Open ↗
06/28/2013121691437Open ↗
09/30/2009120168237Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/28/2013121691437Open ↗
09/30/2009120168237Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/06/2017123266367Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026M00221917-I1Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
03/27/2019123708979Open ↗
12/22/2017123266367Open ↗
12/22/2017123266367Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
09/20/2013121691437Open ↗
08/19/2013121691437Open ↗
▸BISSCHEDULE B - PLUMBING1
06/28/2013121691437Open ↗
▸BISEQUIPMENT USE PERMITS1
07/18/2020123708979Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/18/2020123708979Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/28/2013121691437Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/06/2017123266367Open ↗
06/28/2013121691437Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/30/2009120168237Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026M00221917-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/13/2020123708979Open ↗
03/25/2019123708979Open ↗
12/06/2017123266367Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/18/2020123708979Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/18/2020123708979Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
06/28/2013121691437Open ↗
09/30/2009120168237Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/25/2019123708979Open ↗
12/06/2017123266367Open ↗
06/28/2013121691437Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION3
12/26/2017123266367Open ↗
05/12/2014121691437Open ↗
03/27/2014121691437Open ↗
▸BISEFILING COVER SHEET3
03/25/2019123708979Open ↗
12/06/2017123266367Open ↗
09/30/2009120168237Open ↗
▸BISBOROUGH INTAKE FORM1
12/22/2017123266367Open ↗