HPD04/29/2026(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs website, www.NYC.gov\HPD, search bed bugs.
Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
Firm
Trade
Roles
Most Recent
J.L. Heating & Cont
Plumbing
1
07/22/2005
Building Lifecycle
04/29/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
09/26/2025
Boiler inspection report filed
Initial · no defects · Accepted
10/02/2024
Boiler inspection report filed
Initial · no defects · Accepted
04/01/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
10/16/2023
Boiler inspection report filed
Initial · no defects · Accepted
17 history events on file for this building. Sign in free to see the full history. Sign in · Create account