← Back
Walk-up cooperative
Glen Oaks Village
73-43 260 STREET · BIN 4461077
💬 Discuss this project
1948Year Built
3Stories
C6Building Class
R3-2Zoning
171,390 sfGross Floor Area
192Units
LL97 CoveredRent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸
Walk-up cooperative · Owner of record: GLEN OAKS VILLAGE OWNERS INC · 367,250 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARIKH ARCHITECTURAL P.C.205/13/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUSTOMBUILT HOMES INCGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARIKH ARCHITECTURAL P.C.1470205/13/2025
Building Lifecycle
All (41)Filed (2)Permit Issued (2)Signed Off (2)Inspection (4)Objection (24)Special Inspection (7)
04/30/2026
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION TO PROVIDE EXTENSION OF APP. 196 SQ.FT, FOR SUNROOM AND TOILET ON FIRST FLOOR OF 260-25 74 AVENUE, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01219351-I1
04/30/2026
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION TO PROVIDE EXTENSION OF APP. 196 SQ.FT, FOR SUNROOM AND TOILET ON FIRST FLOOR OF 260-25 74 AVENUE, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01219351-S2
04/22/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/31/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/10/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
10/31/2025
Permit issued — Plumbing
Q01219351-S2-PL
10/29/2025
Permit issued — Foundation
Q01219351-I1-GC-CX
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BINA PARIKH
06/18/2025
Objection raised — Zoning
06/06/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/03/2025
Objection raised — Admin
05/30/2025
Objection raised — Admin
05/30/2025
Objection raised — Plumbing
05/30/2025
Objection raised — Cost
05/22/2025
Objection raised — Inspections
05/22/2025
Objection raised — Admin
05/22/2025
Objection raised — Mechanical
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Structural
05/22/2025
Objection raised — Zoning
05/22/2025
Objection raised — Cost
05/13/2025
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION TO PROVIDE EXTENSION OF APP. 196 SQ.FT, FOR SUNROOM AND TOILET ON FIRST FLOOR OF 260-25 74 AVENUE, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01219351-I1
05/13/2025
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION TO PROVIDE EXTENSION OF APP. 196 SQ.FT, FOR SUNROOM AND TOILET ON FIRST FLOOR OF 260-25 74 AVENUE, NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01219351-S2
05/08/2025
Special inspection requirement — Concrete - Cast-In-Place
BINA PARIKH
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BINA PARIKH
05/08/2025
Special inspection requirement — Subgrade Inspections
BINA PARIKH
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BINA PARIKH
05/01/2025
Special inspection requirement — Footing and Foundation
BINA PARIKH
05/01/2025
Special inspection requirement — Final
BINA PARIKH
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/31/2025
DOB NOWFoundationSigned-offCUSTOMBUILT HOMES INC10/29/2025
1 project · most recent 10/31/2025
FiledStatusContractorScope
10/31/2025CompleteVILLAGE ELECTL CONTRS INC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/22/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/31/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2025Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/23/2025Structural Stability – Alterations of existing buildingsBINA PARIKHspecial
05/08/2025Concrete - Cast-In-PlaceBINA PARIKHspecial
05/08/2025Fire-Resistant Penetrations and JointsBINA PARIKHspecial
05/08/2025Subgrade InspectionsBINA PARIKHspecial
05/08/2025Fire-Resistant Penetrations and JointsBINA PARIKHspecial
05/01/2025Footing and FoundationBINA PARIKHprogress
05/01/2025FinalBINA PARIKHprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01219351-S2Request digital key ↗
08/20/2026Q01219351-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01219351-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01219351-S2Open ↗
08/23/2026Q01219351-I1Open ↗
08/23/2026Q01219351-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01219351-I1Open ↗
08/13/2026Q01219351-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01219351-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01219351-S2Open ↗
08/13/2026Q01219351-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01219351-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01219351-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01219351-I1Open ↗