← Back
Two family converted from one family
260 CLIFTON PLACE
BROOKLYN · BIN 3050083
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
4,216 sfGross Floor Area
2Units
Rent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · Owner of record: PRESTIGE CLIFTON BROWNSTONE 260 CORP · 2,000 sf lot · 2.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire ProtectionGeneral
Roof32p · 2 filings · 20 docs
Floor 331p · 1 filing · 20 docs
Floor 230p · 1 filing · 20 docs
Floor 129p · 1 filing · 20 docs
Cellar30p · 2 filings · 20 docs
Basement29p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A-Z PROPERTIES NYC3907/08/2026
HPD307/08/2026
260 CLIFTON PL INC203/22/2026
NYC BUILDING SOLUTIONS CO803/22/2026
260 CLIFTON REALTY LLC803/22/2026
HOUSING PRESERVATION DEVELOPME403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/21/2024$200K—— → —$47/sf building
06/07/2022$1.4M—— → —$323/sf building
03/02/2022$600K—Private party → 260 CLIFTON TMT HOLDING GROUP CORP$142/sf building
11/06/2015$850K—TDA DEVELOPMENT, INC. → 260 CLIFTON REALTY LLC$202/sf building
09/18/2015$625K—Private party → TDA DEVELOPMENT, INC.$148/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA804/21/2026
CHUN ENGINEERING CONSULTANT PLLC101/20/2024
FABIAN CRUZ PE PLLC103/31/2023
ASR ENGINEERING PC111/17/2022
JOSE A VELASQUEZ, PE102/18/2022
LOMBARDO PROFESSIONAL ENGINEERING102/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSE A VELASQUEZ PE203/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
NYC BUILDING SOLUTIONS703/21/2026
KC EXPEDITING203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor1207/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor603/21/2026
VIP FIRE SPRINKLER INCFire Protection107/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor107/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519104/21/2026
WORLD DESIGN ARCHITECTURE9323204/07/2025
DOYUN KIM; RA7415605/14/2024
IP CONCRETE TESTING AND I6252102/18/2022
Building Lifecycle
All (112)Filed (13)Permit Issued (12)Signed Off (6)Violation (25)Inspection (8)Objection (18)Special Inspection (30)
07/02/2026
Permit issued — Mechanical Systems
B01387395-I1-MS
04/21/2026
Filed — Alteration
B01387395-I1
07/30/2025
Violation issued (ECB, open)
Construction
06/04/2025
Violation issued (ECB, open)
Construction
04/22/2025
Signed off — Alteration
PROPOSED INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08039214-I1
04/07/2025
Filed — Alteration CO
HEREWITH FILING TO PROPOSE STRUCTURAL REPAIR AS PER PLANS DUE TO FIRE DAMAGE , ADDRESS VACATE ORDER & RELATED JOB #B00781377-I1
B00781377-P3
04/07/2025
Special inspection requirement — Structural Steel - Details
William Alicea
04/07/2025
Special inspection requirement — Fenestration air leakage
William Alicea
04/07/2025
Special inspection requirement — Lighting controls
William Alicea
04/07/2025
Special inspection requirement — Final
William Alicea
04/07/2025
Special inspection requirement — Insulation placement and R values
William Alicea
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
04/07/2025
Special inspection requirement — Interior lighting power
William Alicea
04/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
William Alicea
04/07/2025
Special inspection requirement — Air barrier - visual inspection
William Alicea
04/07/2025
Special inspection requirement — Fenestration areas
William Alicea
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
04/07/2025
Special inspection requirement — Lighting in dwelling units
William Alicea
04/07/2025
Special inspection requirement — Maintenance information
William Alicea
04/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
04/07/2025
Special inspection requirement — Permanent certificate
William Alicea
04/07/2025
Special inspection requirement — Mechanical Systems
William Alicea
04/07/2025
Special inspection requirement — Structural Cold-Formed Steel
William Alicea
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
03/31/2025
Signed off — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEM AS PER PLANS. IN CONJUNCTION WITH DOB #B00781377.
B00788779-I1
03/28/2025
Violation issued (ECB, closed)
Construction
03/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/11/2025
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR 2-FAMILY RESIDENTIAL IN CONJUNCTION WITH B00781377-I1
B00852814-I1
02/11/2025
Signed off — Alteration
HEREWITH FILING TO INSTALL CONSTRUCTION FENCE AS PER PLANS.
B00981290-I1
10/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/11/2024
Permit issued — Plumbing
B00788779-I1-PL
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
05/20/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
05/17/2024
Objection raised — Energy
05/17/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Other
05/17/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Other
05/17/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Other
05/17/2024
Objection resolved — Addressed
05/14/2024
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEM AS PER PLANS. IN CONJUNCTION WITH DOB #B00781377.
B00788779-P1
05/14/2024
Filed — Alteration CO
HEREWITH FILING TO PROPOSE STRUCTURAL REPAIR AS PER PLANS DUE TO FIRE DAMAGE , ADDRESS VACATE ORDER & RELATED JOB #B00781377-I1
B00781377-P2
04/16/2024
Permit issued — General Construction
B00781377-I1-GC-CX
02/01/2024
Special inspection requirement — Final
DOYUN KIM
02/01/2024
Special inspection requirement — Structural Steel - Details
DOYUN KIM
02/01/2024
Special inspection requirement — Insulation placement and R values
DOYUN KIM
02/01/2024
Special inspection requirement — Structural Cold-Formed Steel
DOYUN KIM
02/01/2024
Special inspection requirement — Mechanical Systems
DOYUN KIM
02/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
02/01/2024
Special inspection requirement — Lighting controls
DOYUN KIM
02/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
02/01/2024
Special inspection requirement — Fenestration areas
DOYUN KIM
02/01/2024
Special inspection requirement — Interior lighting power
DOYUN KIM
01/31/2024
Signed off — Alteration CO
HEREWITH FILING TO PROPOSE STRUCTURAL REPAIR AS PER PLANS DUE TO FIRE DAMAGE , ADDRESS VACATE ORDER & RELATED JOB #B00781377-I1
B00781377-S1
01/31/2024
Permit issued — Structural
B00781377-S1-ST
01/24/2024
Permit issued — Construction Fence
B00981290-I1-FN
01/20/2024
Filed — Alteration
HEREWITH FILING TO INSTALL CONSTRUCTION FENCE AS PER PLANS.
B00981290-I1
01/17/2024
Filed — Alteration CO
HEREWITH FILING TO PROPOSE STRUCTURAL REPAIR AS PER PLANS DUE TO FIRE DAMAGE , ADDRESS VACATE ORDER & RELATED JOB #B00781377-I1
B00781377-S1
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNYC BUILDING SOLUTIONS CO07/02/2026
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN06/11/2024
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO04/16/2024
DOB NOWStructuralSigned-offNYC BUILDING SOLUTIONS CO01/31/2024
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO01/24/2024
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC07/14/2023
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO05/30/2023
DOB NOWStructuralPermit IssuedNYC BUILDING SOLUTIONS CO01/05/2023
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO12/14/2022
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING11/17/2022
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING11/17/2022
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC02/09/2022
BISEQISSUEDSTATEWIDE DEMOLITION CORP.02/10/2022
BIS—ISSUEDSTATEWIDE DEMOLITION CORP.02/10/2022
2 projects · most recent 04/07/2025
Heating Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/07/2025Permit IssuedNYC BUILDING SOLUTIONS COAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MSZ-GL15NA-U1 18,200 BTU · Pump ×16
MXZ-3C24NA2 23,600 BTU · Condensing Unit ×2
Heating
Mitsubishi Electric MSZ-GL15NA-U1 20,900 BTU · Pump ×16
MXZ-3C24NA2 24,600 BTU · Condensing Unit ×2
02/18/2022——Heating Systems
Heating
Westinghouse WESTINGHOUSE 50,000 BTU ×2
3 projects · most recent 01/07/2025
General Wiring
FiledStatusContractorScope
01/07/2025CompleteWEBSTAR ELECL CONTRS INCGeneral Wiring
11/21/2022CompleteRICHARD NEU—
02/11/2022CancelledNASH ELECTRIC SERVICES IN—
2 projects · most recent 04/07/2025
Wood Steel
FiledStatusContractorScope
04/07/2025Permit IssuedNYC BUILDING SOLUTIONS COSteel, Wood
02/18/2022——Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
04/07/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
04/07/2025Air barrier - visual inspectionWilliam Aliceaenergy_progress
04/07/2025Interior lighting powerWilliam Aliceaenergy_progress
04/07/2025Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
04/07/2025Permanent certificateWilliam Aliceaenergy_progress
04/07/2025Lighting controlsWilliam Aliceaenergy_progress
04/07/2025Fenestration areasWilliam Aliceaenergy_progress
04/07/2025HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
04/07/2025Lighting in dwelling unitsWilliam Aliceaenergy_progress
04/07/2025Insulation placement and R valuesWilliam Aliceaenergy_progress
04/07/2025Maintenance informationWilliam Aliceaenergy_progress
04/07/2025HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
04/07/2025HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
04/07/2025Fenestration air leakageWilliam Aliceaenergy_progress
04/07/2025FinalWilliam Aliceaprogress
04/07/2025Structural Steel - DetailsWilliam Aliceaspecial
04/07/2025Mechanical SystemsWilliam Aliceaspecial
04/07/2025Structural Cold-Formed SteelWilliam Aliceaspecial
05/20/2024Energy Code Compliance InspectionsDOYUN KIMprogress
05/20/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
02/01/2024Insulation placement and R valuesDOYUN KIMenergy_progress
02/01/2024HVAC-R and service water heating system controlsDOYUN KIMenergy_progress
02/01/2024Fenestration areasDOYUN KIMenergy_progress
02/01/2024Interior lighting powerDOYUN KIMenergy_progress
02/01/2024Fenestration air leakageDOYUN KIMenergy_progress
Latest 25 of 75.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/31/2026B00674242-I1Request digital key ↗
08/31/2026B00683494-I1Request digital key ↗
08/28/2026B00781377-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
05/12/2023322099876Open ↗
11/22/2021322099876Open ↗
▸BISWORK PERMIT APPLICATION2
02/12/2022322099876Open ↗
02/12/2022322099876Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00781377-P1Open ↗
08/13/2026B00781377-P2Open ↗
08/13/2026B00781377-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00781377-I1Open ↗
08/13/2026B00781377-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00781377-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026B00788779-P1Open ↗
09/01/2026B00781377-P3Open ↗
09/01/2026B00781377-P3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B00852814-I1Open ↗
09/02/2026B00788779-P1Open ↗
09/01/2026B00781377-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/31/2026B00674242-I1Open ↗
08/31/2026B00683494-I1Open ↗
08/28/2026B00788779-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/12/2022322099876Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026B00781377-P1Open ↗
08/13/2026B00781377-P3Open ↗
08/13/2026B00781377-P2Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/12/2022322099876Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
02/12/2022322099876Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00781377-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/31/2026B00683494-I1Open ↗
08/28/2026B00788779-I1Open ↗
08/13/2026B00788779-P1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/31/2026B00683494-I1Open ↗
08/13/2026B00781377-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/12/2022322099876Open ↗
▸BISLANDMARKS APPROVAL1
02/12/2022322099876Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
02/12/2022322099876Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
11/22/2021322099876Open ↗
▸BISADDITIONAL INFORMATION1
02/12/2022322099876Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial4
08/13/2026B00781377-P1Open ↗
08/13/2026B00781377-P3Open ↗
08/13/2026B00781377-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00781377-I1Open ↗
08/13/2026B00781377-P2Open ↗
08/13/2026B00781377-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026B00781377-P3Open ↗
08/13/2026B00781377-P2Open ↗
08/13/2026B00781377-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/13/2026B00781377-I1Open ↗
08/13/2026B00781377-P1Open ↗
08/13/2026B00781377-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWWaiver Document3
08/13/2026B00781377-I1Open ↗
08/13/2026B00781377-P3Open ↗
08/13/2026B00788779-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00781377-I1Open ↗