← Back
BuildNYC
Two family converted from one family
260 CLIFTON PLACE
BROOKLYN · BIN 3050083
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
4,216 sfGross Floor Area
2Units
Rent Stabilized2 Active Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · Owner of record: Prestige Clifton Brownstone 260 · 2,000 sf lot · 2.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof36p · 2 filings · 20 docs
Floor 337p · 3 filings · 20 docs
Floor 236p · 3 filings · 20 docs
Floor 1Installation of Heavy Duty Sidewalk Shed44p · 5 filings · 20 docs
Cellar36p · 3 filings · 20 docs
Basement32p · 1 filing · 20 docs
Sub-Basement3p · 2 filings · 15 docs
Site & exteriorConstruction and demolition fence installationUnder Construction1p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A-Z Properties NYC3907/08/2026
NYC Department of Housing Preservation and Development707/08/2026
260 Clifton PL103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/21/2024$200K—Private party → PRESTIGE CLIFTON BROWNSTONE 260 CORP$47/sf building
06/07/2022$1.4M—260 CLIFTON TMT HOLDINGS GROUP CORP → 260 CLIFTON PL INC$323/sf building
03/02/2022$600K—Private party → 260 CLIFTON TMT HOLDING GROUP CORP$142/sf building
11/06/2015$850K—TDA DEVELOPMENT, INC. → 260 CLIFTON REALTY LLC$202/sf building
09/18/2015$625K—Private party → TDA DEVELOPMENT, INC.$148/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA804/21/2026
Chun Engineering Consultant101/20/2024
Fabian Cruz PE103/31/2023
Asr Engineering111/17/2022
Jose A Velasquez, PE102/18/2022
Lombardo Professional Engineering102/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jose A Velasquez PE203/21/2026
Lombardo Building Consultants103/21/2026
Javith Camino703/21/2026
KC Expediting203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC Building SolutionsGeneral Contractor707/08/2026
Topline NYC ContractingScaffold603/21/2026
NYC Building Solutionsspecialty_contractor407/04/2026
Statewide DemolitionGeneral Contractor203/21/2026
L&J PLG & Heating Co of NYPlumbing107/08/2026
Vip Fire SprinklerFire Protection107/08/2026
Wasoff Plumbing & UtilityPlumbing107/08/2026
Arsenal ScaffoldScaffold107/08/2026
NYC Building SolutionsScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519104/21/2026
World Design Architecture9323204/07/2025
Doyun Kim; RA7415605/14/2024
IP Concrete Testing and I6252102/18/2022
Building Lifecycle
07/02/2026
Permit issued — Mechanical Systems
B01387395-I1-MS
04/21/2026
Filed — Alteration
B01387395-I1
07/30/2025
As per section 2113.1.5.1 of the 2022 NYC building code. Failure to alter the adjoining buildings 'previously constructed chimney (262 clifton…
ECB violation · open
06/04/2025
Failure to maintain building in a code-compliant manner. At the time of inspection, i observed the stainless-steel chimney pipe connection for 262…
ECB violation · open
05/29/2025
Closed: Fully demolish the building
DOB violation · closed on the city's record
109 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNYC Building Solutions07/02/2026
DOB NOWPlumbingSigned-offL&J PLG & Heating Co of NY06/11/2024
DOB NOWStructuralPermit IssuedNYC Building Solutions04/16/2024
DOB NOWStructuralSigned-offNYC Building Solutions01/31/2024
DOB NOWConstruction FenceSigned-offNYC Building Solutions01/24/2024
DOB NOWSprinklersSigned-offVip Fire Sprinkler07/14/2023
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility05/30/2023
DOB NOWGeneral ConstructionPermit IssuedNYC Building Solutions01/05/2023
DOB NOWMechanical SystemsPermit IssuedNYC Building Solutions12/14/2022
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting11/17/2022
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting11/17/2022
DOB NOWSidewalk ShedSigned-offArsenal Scaffold02/09/2022
BISEQISSUEDStatewide Demolition02/10/2022
BIS—ISSUEDStatewide Demolition02/10/2022
2 projects · most recent 04/07/2025
Heating Systems Air Conditioning Systems
FiledStatusContractorScope
04/07/2025Permit IssuedNYC Building SolutionsAir Conditioning Systems, Heating Systems
02/18/2022——Heating Systems
3 projects · most recent 01/07/2025
General Wiring
FiledStatusContractorScope
01/07/2025CompleteWebstar Electrical ContractorsGeneral Wiring
11/21/2022CompleteRichard Neu—
02/11/2022CancelledNash Electric Services—
2 projects · most recent 04/07/2025
Wood Steel
FiledStatusContractorScope
04/07/2025Permit IssuedNYC Building SolutionsSteel, Wood
02/18/2022——Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
04/07/2025Structural Cold-Formed SteelWilliam Aliceaspecial
04/07/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
04/07/2025Mechanical SystemsWilliam Aliceaspecial
04/07/2025Air barrier - visual inspectionWilliam Aliceaenergy_progress
04/07/2025Interior lighting powerWilliam Aliceaenergy_progress
04/07/2025Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
04/07/2025Permanent certificateWilliam Aliceaenergy_progress
04/07/2025Lighting controlsWilliam Aliceaenergy_progress
04/07/2025Fenestration areasWilliam Aliceaenergy_progress
04/07/2025HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
04/07/2025Lighting in dwelling unitsWilliam Aliceaenergy_progress
04/07/2025Insulation placement and R valuesWilliam Aliceaenergy_progress
04/07/2025Maintenance informationWilliam Aliceaenergy_progress
04/07/2025HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
04/07/2025HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
04/07/2025Fenestration air leakageWilliam Aliceaenergy_progress
04/07/2025FinalWilliam Aliceaprogress
04/07/2025Structural Steel - DetailsWilliam Aliceaspecial
05/20/2024Energy Code Compliance InspectionsDOYUN KIMprogress
05/20/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
02/01/2024HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
02/01/2024Mechanical SystemsDOYUN KIMspecial
02/01/2024Structural Cold-Formed SteelDOYUN KIMspecial
02/01/2024Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
02/01/2024Structural Steel - DetailsDOYUN KIMspecial
Latest 25 of 75.
113 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account