Office with commercial, 1-6 stories
260 EAST 138TH STREET
BRONX · Mott Haven-Port Morris · BIN 2000802
💬 Discuss this project
1931Year Built
5Stories
O5Building Class
M1-4/R7XZoning
12,200 sfGross Floor Area
5Units
0 Active Violations
Office with commercial, 1-6 stories · Owner of record: Sobro Third · 2,451 sf lot · 4.98 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLal Restaurant GroupUnder Construction8p · 1 filing · 4 docs
Floor 2Cap't Loui7p · 2 filings · 20 docs
Floor 1Lal Restaurant Group, Cap't Loui +1Under Construction13p · 8 filings · 20 docs
CellarLal Restaurant Group, Cap't Loui +1Under Construction13p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sobro Third1403/22/2026
E 138 BX Realty203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2016$2.5M—— → —$205/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nyron Hall Engineering1102/20/2025
Alfredo T. Fredericks RA105/04/2022
FC Consulting Engineering310/27/2021
Ert Design Group206/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SR Consultant603/21/2026
Designworks Consultant503/21/2026
Ert Design Group203/21/2026
FC Consulting Engineer603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Caruso ContractingGeneral Contractor1707/08/2026
Structural Preservation *General Contractor407/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
Flint MechanicalFire Protection107/08/2026
Metrocity GroupPlumbing107/08/2026
PipestylistsPlumbing107/08/2026
DNA Plumbing ContractorsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I62521002/20/2025
City-Wide Testing416105/04/2022
FC Consulting Engineer, PL1958210/27/2021
Crosscheck Inspection Services544106/29/2021
Building Lifecycle
All (136)Filed (17)Permit Issued (19)Signed Off (1)Violation (60)Inspection (15)Objection (6)Special Inspection (18)
06/10/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/18/2026
Permit issued — General Construction
X00614061-I1-GC-CX
05/18/2026
Permit issued — Mechanical Systems
X00587633-I1-MS
06/16/2025
Permit issued — Structural
X00614061-I1-GC-CX
06/16/2025
Permit issued — Mechanical Systems
X00587633-I1-MS
03/31/2025
Violation issued (FDNY_NOV, closed)
03/24/2025
Permit issued — Plumbing
X00698186-I1-PL
03/18/2025
Signed off — Alteration
RENOVATION OF EXISTING RESTAURANT, ADDING LIFT, CHANGING HVAC UNITS, ADDING TOILET IN CELLAR.
X00637293-I1
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
02/20/2025
Filed — Alteration
INSTALLATION OF NEW BATHROOM, COOKING EQUIPMENT GAS LINE,FLOOR DRAINS, SINKS, GREASE TRAP.
X00698186-P8
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
02/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/29/2025
Filed — Alteration
INSTALLATION OF NEW BATHROOM, COOKING EQUIPMENT GAS LINE,FLOOR DRAINS, SINKS, GREASE TRAP.
X00698186-P7
01/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
01/22/2025
Filed — Alteration
INSTALLATION OF NEW BATHROOM, COOKING EQUIPMENT GAS LINE,FLOOR DRAINS, SINKS, GREASE TRAP.
X00698186-P6
01/10/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/09/2025
Objection resolved — Addressed
01/07/2025
Objection raised — Other
01/06/2025
Filed — Alteration
INSTALLATION OF NEW BATHROOM, COOKING EQUIPMENT GAS LINE,FLOOR DRAINS, SINKS, GREASE TRAP.
X00698186-P5
12/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/23/2024
Special inspection requirement — Final
FAHAD FATEH
12/23/2024
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
12/23/2024
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
12/19/2024
Filed — Alteration
RENOVATION OF EXISTING RESTAURANT, ADDING LIFT, CHANGING HVAC UNITS, ADDING TOILET IN CELLAR.
X00637293-P2
12/19/2024
Filed — Alteration
INSTALLATION OF NEW BATHROOM, COOKING EQUIPMENT GAS LINE,FLOOR DRAINS, SINKS, GREASE TRAP.
X00698186-P4
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/19/2024
Special inspection requirement — Final
NAVEEN KUMAR
12/19/2024
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
12/19/2024
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
11/15/2024
Filed — Alteration
INSTALLATION OF NEW BATHROOM, COOKING EQUIPMENT GAS LINE,FLOOR DRAINS, SINKS, GREASE TRAP.
X00698186-P2
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
10/21/2024
Permit issued — Plumbing
X00698186-I1-PL
10/17/2024
Permit issued — Mechanical Systems
X00637293-I1-GC
10/17/2024
Permit issued — Mechanical Systems
X00637293-I1-MS
09/05/2024
Objection resolved — Addressed
08/30/2024
Objection raised — Other
08/28/2024
Filed — Alteration
INSTALLATION OF NEW BATHROOM, COOKING EQUIPMENT GAS LINE,FLOOR DRAINS, SINKS, GREASE TRAP.
X00698186-P1
08/28/2024
Filed — Alteration
RENOVATION OF EXISTING RESTAURANT, ADDING LIFT, CHANGING HVAC UNITS, ADDING TOILET IN CELLAR.
X00637293-P1
08/27/2024
Special inspection requirement — Mechanical Systems
08/27/2024
Special inspection requirement — Final
08/27/2024
Special inspection requirement — Masonry
08/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
05/22/2024
Permit issued — Mechanical Systems
X00587633-I1-MS
05/22/2024
Permit issued — Structural
X00614061-I1-GC-CX
05/25/2023
Permit issued — General Construction
X00614061-I1-GC-CX
05/25/2023
Permit issued — Mechanical Systems
X00587633-I1-MS
04/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/17/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/14/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/27/2023
Permit issued — Plumbing
X00585027-I1-PL
10/28/2022
Permit issued — Sprinklers
X00587636-I1-EW-SP
10/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2022
Permit issued — Structural
X00614061-I1-GC-CX
08/26/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCaruso Contracting05/18/2026
DOB NOWMechanical SystemsPermit IssuedCaruso Contracting05/18/2026
DOB NOWStructuralPermit IssuedCaruso Contracting06/16/2025
DOB NOWMechanical SystemsPermit IssuedCaruso Contracting06/16/2025
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS03/24/2025
DOB NOWPlumbingSigned-offDNA Plumbing Contractors10/21/2024
DOB NOWMechanical SystemsSigned-offStructural Preservation *10/17/2024
DOB NOWMechanical SystemsPermit IssuedStructural Preservation *10/17/2024
DOB NOWMechanical SystemsPermit IssuedCaruso Contracting05/22/2024
DOB NOWStructuralPermit IssuedCaruso Contracting05/22/2024
DOB NOWGeneral ConstructionPermit IssuedCaruso Contracting05/25/2023
DOB NOWMechanical SystemsPermit IssuedCaruso Contracting05/25/2023
DOB NOWPlumbingSigned-offDPH Plumbing & Heating01/27/2023
DOB NOWSprinklersSigned-offBletsas P&H10/28/2022
DOB NOWStructuralPermit IssuedCaruso Contracting09/16/2022
DOB NOWMechanical SystemsPermit IssuedCaruso Contracting05/02/2022
DOB NOWPlumbingSigned-offMetrocity Group04/25/2022
DOB NOWPlumbingSigned-offT & T Plumbing01/24/2022
DOB NOWMechanical SystemsPermit IssuedCaruso Contracting11/01/2021
BIS—ISSUEDLoyola Painting & Construction12/07/2018
BISSPISSUEDExpert Fire Sprinkler10/26/2018
BISPLISSUEDCape Plumbing08/29/2018
BISPLISSUEDCape Plumbing08/07/2018
BISMHISSUEDH&S Air Condtn Ref & Heating03/02/2018
BIS—ISSUEDLoyola Painting & Construction02/09/2018
BIS—ISSUEDLoyola Painting & Construction05/30/2017
BISPLISSUEDCape Plumbing05/30/2017
BISEQISSUEDBhaghiana General Construction01/31/2017
BISOTISSUEDLoyola Painting & Construction01/13/2017
BISPLISSUEDCape Plumbing11/10/2016
BISOTISSUEDBhaghiana General Construction09/30/2016
BISEQISSUEDBhaghiana General Construction09/26/2016
BISFPISSUEDMaster Fire Systems04/22/2008
BISOTISSUEDVishal Construction02/05/2008
BISPLISSUEDA P Plumbing & Heating11/10/1998
BISPLISSUEDLuver Plumbing & Heating09/29/1998
BIS—ISSUEDPequa Contracting09/29/1998
BISOTISSUEDN/A09/21/1998
BISOTISSUEDTri-Millenium06/23/1998
BIS—ISSUEDManhattanville Needle Trade SCH08/18/1993
1 project · most recent 06/29/2021
FiledStatusContractorScope
06/29/2021——26 heads
2 projects · most recent 02/20/2025
Gas Water/Sanitary
FiledStatusContractorScope
02/20/2025Signed-offDynamic Plumbing & SprinklerGas, Water/Sanitary
06/29/2021——Gas, Water/Sanitary
5 projects · most recent 10/28/2022
General Wiring
FiledStatusContractorScope
10/28/2022Permit IssuedJohn H. Moore8 meters, 2 new_meters
11/12/2021Permit IssuedJohn H. Moore8 meters, 1 new_meters
11/11/2021Permit IssuedJohn H. MooreGeneral Wiring
11/20/2018CompleteAccurate ElectricalGeneral Wiring
11/15/2018CompleteContact Plus Electrical—
1 project · most recent 05/04/2022
Steel
FiledStatusContractorScope
05/04/2022Permit IssuedCaruso ContractingSteel
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
06/10/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/10/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/17/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
02/25/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
02/14/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
01/29/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
12/23/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
12/23/2024FinalFAHAD FATEHprogress
12/23/2024MasonryINDARDEO PARBHUNATHspecial
12/23/2024Mechanical SystemsINDARDEO PARBHUNATHspecial
12/19/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
12/19/2024FinalNAVEEN KUMARprogress
12/19/2024MasonryINDARDEO PARBHUNATHspecial
12/19/2024Mechanical SystemsINDARDEO PARBHUNATHspecial
11/14/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/27/2024Mechanical Systems—special
08/27/2024Final—progress
08/27/2024Masonry—special
08/27/2024Fire-Resistant Penetrations and Joints—special
08/27/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
06/28/2021Sprinkler SystemsEUGENE BIFULCOspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lal Restaurant GroupRestaurant / Food ServiceCellar, Floor 1, Roof
Project X00614061 Alteration · Permit Entire · 05/04/2022
Project X00587633 Alteration · Permit Entire · 10/27/2021
Project X00587636 Alteration · Permit Entire · 10/27/2021
Project X00585027 Alteration · Permit Entire · 10/21/2021
Cap't LouiRestaurant / Food ServiceCellar, Floors 1, 2
Project X00698186 Alteration · Permit Entire · 03/21/2022
PopeyesRestaurant / Food ServiceCellar, Floor 1
Project X00548070 Alteration · Approved · 06/29/2021
Project X00476561 Alteration · Objections · 05/25/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 260 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
08/25/2026X00548070-I1Request digital key ↗
08/25/2026X00548070-P1Request digital key ↗
08/25/2026X00585027-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00476561-I1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION21
10/12/2021240299609Open ↗
06/17/2021240299609Open ↗
06/16/2021240299609Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION15
12/11/2018220558180Open ↗
10/26/2018240232967Open ↗
08/29/2018220545373Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/23/2018220558180Open ↗
▸Seals & Professional Certifications59
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/25/2026X00476561-I1Open ↗
08/25/2026X00548070-I1Open ↗
08/25/2026X00548070-P1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
12/11/2019210032347Open ↗
02/19/2019220558180Open ↗
02/19/2019220558180Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026X00698186-P1Open ↗
08/31/2026X00698186-P2Open ↗
08/28/2026X00637293-I1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
03/12/2021240299609Open ↗
08/15/2018240232967Open ↗
04/28/2017240181281Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/12/2021240299609Open ↗
12/18/2016240166397Open ↗
09/02/2016240155265Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/18/2016240166397Open ↗
09/02/2016240155265Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/18/2016240166397Open ↗
09/02/2016240155265Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026X00637293-I1Open ↗
08/26/2026X00637293-P2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/24/2008210032347Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/24/2008210032347Open ↗
▸BISPC FULL REPORT1
01/24/2008210032347Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
07/13/2018220558180Open ↗
04/21/2017220558180Open ↗
11/09/2016220558180Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
08/15/2018240232967Open ↗
04/28/2017240181281Open ↗
03/26/2008210041667Open ↗
▸BISEQUIPMENT USE PERMITS2
01/07/2019240181281Open ↗
01/07/2019240181281Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/07/2019240181281Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
11/09/2016220558180Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
12/18/2016240166397Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/12/2021240299609Open ↗
▸Environmental & Asbestos32
▸DOB NOWOER: Notice to Proceed11
08/20/2026X00698186-P5Open ↗
08/20/2026X00698186-P1Open ↗
08/15/2026X00698186-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026X00476561-I1Open ↗
08/25/2026X00548070-P1Open ↗
08/25/2026X00548070-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/20/2026X00698186-P5Open ↗
08/20/2026X00698186-P1Open ↗
08/15/2026X00698186-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/15/2018240232967Open ↗
04/28/2017240181281Open ↗
11/09/2016220558180Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
12/18/2016240166397Open ↗
09/02/2016240155265Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/26/2008210041667Open ↗
01/24/2008210032347Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
12/19/2018240232967Open ↗
12/19/2018240181281Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/19/2019220558180Open ↗
12/19/2018240181281Open ↗
02/02/2018240181281Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/19/2019220558180Open ↗
12/19/2018240181281Open ↗
11/07/2018220545373Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/28/2017240181281Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/15/2018240232967Open ↗
11/28/2017240181281Open ↗
12/18/2016240166397Open ↗
Showing 3 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
02/19/2019220558180Open ↗
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
12/27/2019220558180Open ↗
12/26/2019220558180Open ↗
12/20/2019220558180Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/19/2019220558180Open ↗
02/19/2019220558180Open ↗
11/07/2018220545373Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
12/27/2019220558180Open ↗
04/21/2017220558180Open ↗
04/12/2017220558180Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/26/2008210041667Open ↗
01/24/2008210032347Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT14
03/12/2021240299609Open ↗
10/21/2019210041667Open ↗
10/21/2019210032347Open ↗
Showing 3 of 14 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST3
01/31/2017240166397Open ↗
09/24/2016240155265Open ↗
09/21/2016240155265Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
03/12/2021240299609Open ↗
▸Filing & Intake Forms37
▸BISBOROUGH INTAKE FORM17
12/27/2019220558180Open ↗
12/26/2019210041667Open ↗
12/20/2019220558180Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION14
03/15/2022240299609Open ↗
06/16/2021240299609Open ↗
12/26/2019220558180Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/12/2021240299609Open ↗
08/15/2018240232967Open ↗
04/28/2017240181281Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
11/09/2016220558180Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
02/19/2019220558180Open ↗
11/09/2016220558180Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
03/12/2021240299609Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION1
11/03/2016220545373Open ↗