Hospital, sanitarium, mental institution
Ambulatory Care Clinic at Union Hosp
260 EAST 188TH STREET · BIN 2013469
💬 Discuss this project
1922Year Built
5Stories
I1Building Class
R7-1Zoning
204,433 sfGross Floor Area
1Units
LL97 Covered3 Active Violations 0 unresolved · 3 paperwork only 1 old, status unconfirmed ▸
Hospital, sanitarium, mental institution · 55,284 sf lot · 3.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAmbulatory Care Clinic at Union Hospital18p · 3 filings · 16 docs
Floor 2Ambulatory Care Clinic at Union Hospital, Medly Pharmacy15p · 4 filings · 18 docs
Floor 1Ambulatory Care Clinic at Union Hospital, Medly Pharmacy22p · 5 filings · 17 docs
CellarAmbulatory Care Clinic at Union Hospital20p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St Barnabas Hospital1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Salamon Engineering603/21/2026
Maryclare Nepogoda Expediter103/21/2026
Louis Striar403/21/2026
Lee Engineering Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Marlin Mechanicalspecialty_contractor203/21/2026
Signstar NYCSign hanger207/08/2026
New Age Electrical ContractingElectrical203/21/2026
TF ElectricalElectrical103/21/2026
FgiGeneral Contractor107/08/2026
GRR Cooling ExpertsGeneral Contractor107/08/2026
JNR Flooringspecialty_contractor107/08/2026
Blaze ElectricElectrical103/21/2026
F.S. SitePlumbing107/08/2026
Harley Electric CoElectrical103/21/2026
TF ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Studio Nyandak Architectu8378201/16/2024
Richmond Testing Lab263311/15/2022
McSweeney Engineering4451110/11/2019
Building Lifecycle
All (123)Filed (9)Permit Issued (7)Signed Off (6)Violation (60)Inspection (1)Objection (10)Special Inspection (30)
01/08/2025
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/01/2024
Violation issued (ECB, closed)
Construction
04/11/2024
Signed off — Alteration
THE NEW EXHAUST SYSTEM SHALL INCLUDE: INSTALLATION OF (1) NEW GARAGE EXHAUST FAN IN 1ST FLOOR ROOF MECHANICAL ROOM BULKHEAD & INSTALLATION OF ASSOCIATED DUCTS, DIFFUSERS, LOUVERS, REGISTERS, AND CONTROL WIRING.
X00974415-I1
03/19/2024
Permit issued — Mechanical Systems
X00974415-I1-MS
03/04/2024
Signed off — Alteration
Installation of new area drains and repair plumbing pipes per plans submitted herewith.
X00858899-S1
02/26/2024
Signed off — Alteration
Installation of new area drains and repair plumbing pipes per plans submitted herewith.
X00858899-I1
02/02/2024
Violation issued (ECB, closed)
Construction
01/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/18/2024
Objection raised — Other
01/18/2024
Objection raised — Other
01/16/2024
Filed — Alteration
THE NEW EXHAUST SYSTEM SHALL INCLUDE: INSTALLATION OF (1) NEW GARAGE EXHAUST FAN IN 1ST FLOOR ROOF MECHANICAL ROOM BULKHEAD & INSTALLATION OF ASSOCIATED DUCTS, DIFFUSERS, LOUVERS, REGISTERS, AND CONTROL WIRING.
X00974415-I1
01/08/2024
Permit issued — Plumbing
X00858899-S1-PL
12/08/2023
Special inspection requirement — Mechanical Systems
TENZIN NYANDAK
12/08/2023
Special inspection requirement — Ventilation and air distribution system
TENZIN NYANDAK
12/08/2023
Special inspection requirement — Maintenance information
TENZIN NYANDAK
12/08/2023
Special inspection requirement — Final
TENZIN NYANDAK
12/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
10/10/2023
Filed — Alteration
Installation of new area drains and repair plumbing pipes per plans submitted herewith.
X00858899-S1
09/13/2023
Permit issued — Structural
X00858899-I1-ST
09/01/2023
Filed — Alteration
Installation of new area drains and repair plumbing pipes per plans submitted herewith.
X00858899-I1
09/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
09/01/2023
Special inspection requirement — Structural Steel - High Strength Bolting
TENZIN NYANDAK
09/01/2023
Special inspection requirement — Structural Steel - Details
TENZIN NYANDAK
09/01/2023
Special inspection requirement — Sprayed fire-resistant materials
TENZIN NYANDAK
09/01/2023
Special inspection requirement — Concrete - Cast-In-Place
TENZIN NYANDAK
05/24/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/10/2023
Violation issued (ECB, closed)
Construction
04/26/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2023
Special inspection requirement — Structural Steel - Welding
TENZIN NYANDAK
04/12/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
TENZIN NYANDAK
04/12/2023
Special inspection requirement — Final
TENZIN NYANDAK
01/10/2023
Signed off — Alteration
Removal of surface concrete; Demolition and install concerete slab on deck
X00569029-I1
11/16/2022
Special inspection requirement — Sprayed fire-resistant materials
RICHARD LEMANSKY
11/16/2022
Special inspection requirement — Final
Sunil Saigal
11/16/2022
Special inspection requirement — Concrete - Cast-In-Place
RICHARD LEMANSKY
11/16/2022
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD LEMANSKY
11/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD LEMANSKY
11/16/2022
Special inspection requirement — Structural Steel - Details
RICHARD LEMANSKY
11/15/2022
Filed — Alteration
Removal of surface concrete; Demolition and install concerete slab on deck
X00569029-P2
10/19/2022
Special inspection requirement — Final
Sunil Saigal
10/19/2022
Special inspection requirement — Concrete - Cast-In-Place
RICHARD LEMANSKY
10/19/2022
Special inspection requirement — Sprayed fire-resistant materials
RICHARD LEMANSKY
10/19/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD LEMANSKY
10/19/2022
Special inspection requirement — Structural Steel - Details
RICHARD LEMANSKY
10/19/2022
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD LEMANSKY
10/04/2022
Filed — Alteration
Removal of surface concrete; Demolition and install concerete slab on deck
X00569029-P1
09/28/2022
Special inspection requirement — Concrete - Cast-In-Place
RICHARD LEMANSKY
09/28/2022
Special inspection requirement — Final
Sunil Saigal
09/28/2022
Special inspection requirement — Structural Steel - Details
RICHARD LEMANSKY
09/28/2022
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD LEMANSKY
09/28/2022
Special inspection requirement — Sprayed fire-resistant materials
RICHARD LEMANSKY
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/20/2022
Permit issued — Structural
X00569029-I1-ST
02/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2021
Violation issued (ECB, closed)
Construction
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGRR Cooling Experts03/19/2024
DOB NOWPlumbingSigned-offAlan J Brutosky PLBR Cont01/08/2024
DOB NOWStructuralSigned-offJNR Flooring09/13/2023
DOB NOWStructuralSigned-offFgi07/20/2022
DOB NOWSignSigned-offSignstar NYC03/23/2021
DOB NOWSignSigned-offSignstar NYC03/23/2021
DOB NOWMechanical SystemsSigned-offMarlin Mechanical12/24/2019
BISFBISSUEDStar Industrial Ser Co11/09/2004
BISOTISSUEDA.L. Eastmond & Sons10/26/2004
BISOTISSUEDJ. Giarnella & Son09/25/2000
BISFPISSUEDMaster Fire Systems07/21/2000
BISOTISSUEDJ Giarnella & Sons03/24/2000
BISOTISSUEDClean Air & Controls11/01/1999
BISEQISSUEDUnion Hospital11/22/1995
BISMHISSUEDThe Jabco Organization06/13/1995
BISEQISSUEDLu Ruocco General Contracting Co04/28/1994
BISOTISSUEDLu Ruocco General Contracting Co04/28/1994
BISEQISSUEDRockledge Scaffold04/08/1994
BISPLISSUEDStellmar Plumbing & Mechanical03/28/1994
BISMHISSUEDT.R. Ricotta Contractors02/24/1994
BISOTISSUEDT.R. Ricotta Contractors02/24/1994
BISEQISSUEDRockledge Scaffold11/24/1993
BISOTISSUEDPhoenix Combustion04/15/1992
1 project · most recent 10/11/2019
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/11/2019Signed-offMarlin MechanicalAir Conditioning Systems
Cooling
Trane RT-PRC033L-EN 20,000 CFM · Rooftop Unit ×1
4 projects · most recent 12/05/2025
General Wiring Lighting
FiledStatusContractorScope
12/05/2025Permit IssuedHarley Electric CoGeneral Wiring
10/29/2025CompleteNew Age Electrical ContractingGeneral Wiring
01/22/2025Permit IssuedTF ElectricalGeneral Wiring
03/27/2024Permit IssuedNew Age Electrical ContractingGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
12/08/2023Mechanical SystemsTENZIN NYANDAKspecial
12/08/2023Ventilation and air distribution systemTENZIN NYANDAKenergy_progress
12/08/2023Maintenance informationTENZIN NYANDAKenergy_progress
12/08/2023FinalTENZIN NYANDAKprogress
12/08/2023Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
09/01/2023Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
09/01/2023Structural Steel - High Strength BoltingTENZIN NYANDAKspecial
09/01/2023Structural Steel - DetailsTENZIN NYANDAKspecial
09/01/2023Sprayed fire-resistant materialsTENZIN NYANDAKspecial
09/01/2023Concrete - Cast-In-PlaceTENZIN NYANDAKspecial
04/12/2023Structural Steel - WeldingTENZIN NYANDAKspecial
04/12/2023Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
04/12/2023FinalTENZIN NYANDAKprogress
11/16/2022Sprayed fire-resistant materialsRICHARD LEMANSKYspecial
11/16/2022FinalSunil Saigalprogress
11/16/2022Concrete - Cast-In-PlaceRICHARD LEMANSKYspecial
11/16/2022Structural Steel - High Strength BoltingRICHARD LEMANSKYspecial
11/16/2022Structural Stability – Alterations of existing buildingsRICHARD LEMANSKYspecial
11/16/2022Structural Steel - DetailsRICHARD LEMANSKYspecial
10/19/2022FinalSunil Saigalprogress
10/19/2022Concrete - Cast-In-PlaceRICHARD LEMANSKYspecial
10/19/2022Sprayed fire-resistant materialsRICHARD LEMANSKYspecial
10/19/2022Structural Stability – Alterations of existing buildingsRICHARD LEMANSKYspecial
10/19/2022Structural Steel - DetailsRICHARD LEMANSKYspecial
10/19/2022Structural Steel - High Strength BoltingRICHARD LEMANSKYspecial
Latest 25 of 38.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ambulatory Care Clinic at Union HospitalMedical / HealthcareCellar, Floors 1, 2, Roof
Project X00974415 Alteration · LOC Issued · 01/16/2024
Project X00858899 Alteration · LOC Issued · 09/01/2023
Project X00569029 Alteration · LOC Issued · 08/13/2021
Project X00239772 Alteration · Permit Entire · 10/11/2019
Medly PharmacyRetailFloors 1, 2
Project X00478817 Alteration · LOC Issued · 03/11/2021
Project X00478829 Alteration · LOC Issued · 03/11/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/25/2026X00478817-I1Request digital key ↗
08/25/2026X00478829-I1Request digital key ↗
08/25/2026X00569029-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026X00239772-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/11/2011220128127Open ↗
▸Seals & Professional Certifications48
▸DOB NOWSpecial Inspector Seal & Signature25
08/28/2026X00239772-I1Open ↗
08/26/2026X00569029-I1Open ↗
08/26/2026X00569029-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/28/2026X00239772-I1Open ↗
08/28/2026X00239772-I1Open ↗
08/28/2026X00239772-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026X00239772-I1Open ↗
08/25/2026X00478829-I1Open ↗
08/25/2026X00569029-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/11/2011220128127Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
07/11/2011220128127Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/25/2026X00478829-I1Open ↗
08/25/2026X00569029-P2Open ↗
08/25/2026X00569029-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/11/2011220128127Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X00974415-I1Open ↗
08/13/2026X00858899-S1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/11/2011220128127Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/11/2011220128127Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/11/2011220128127Open ↗