← Back
BuildNYC
Three families
260 PALMETTO STREET
BROOKLYN · BIN 3076633
💬 Discuss this project
1931Year Built
2Stories
C0Building Class
R6Zoning
1,360 sfGross Floor Area
3Units
Rent Stabilized21 Active Violations ▸FDNY Report ↗
Three families · 1,700 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed interior renovation and ADA bath2p · 1 filing · 20 docs
Floor 2Proposed interior renovation and ADA bath22p · 2 filings · 20 docs
Floor 1Proposed interior renovation and ADA bath19p · 2 filings · 20 docs
BasementProposed interior renovation and ADA bath1p · 1 filing · 20 docs
Sub-BasementProposed interior renovation and ADA bath19p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nmi Architecture306/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nmi Architecture203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Migliore Restorationspecialty_contractor603/21/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jun Yan, PE7170206/20/2025
Nmi Architecture6825306/20/2025
Building Lifecycle
05/29/2026
Closed: Failure to submit an acceptable inspectn rpt for structurally compromised bldg.
DOB violation · closed on the city's record
05/21/2026
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons # 39106155N issued…
ECB violation · open
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/12/2026
Signed off — Alteration
This project is filed for some cosmetic repair at basement 1st & 2nd floors due to fire, Water & smoke damage, minor layout changes, new ADA bath at 1st floor, no change of use ,egress or occupancy .
B01032741-I1
02/12/2026
Signed off — Alteration
B01032846-I1
79 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMigliore Restoration05/30/2025
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing03/07/2025
DOB NOWGeneral ConstructionSigned-offMigliore Restoration09/19/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/14/2025Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
07/14/2025Structural Stability – Alterations of existing buildingsJUN YANspecial
07/14/2025Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
07/14/2025Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
07/14/2025Fenestration areasNASHAT IBRAHIMenergy_progress
07/14/2025Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
07/14/2025Fenestration air leakageNASHAT IBRAHIMenergy_progress
07/14/2025Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
03/26/2025Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
03/26/2025Structural Stability – Alterations of existing buildingsJUN YANspecial
03/26/2025Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
03/26/2025Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
03/26/2025Fenestration air leakageNASHAT IBRAHIMenergy_progress
03/26/2025Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
03/26/2025Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
03/26/2025Fenestration areasNASHAT IBRAHIMenergy_progress
25 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account