← Back
BuildNYC
Elevator apt, semi-fireproof without stores
260 SEAMAN AVENUE
MANHATTAN · Inwood · BIN 1065084
💬 Discuss this project
1930Year Built
6Stories
D1Building Class
R7AZoning
37,482 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized8 Active Violations 2 unresolved · 6 paperwork only 2 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: 260 Seaman · 8,950 sf lot · 4.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Installation of heavy duty sidewalk shed4p · 1 filing · 3 docs
CellarMoss Management LLC7p · 2 filings · 13 docs
Site & exteriorMoss Management LLCUnder Construction6p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
260 Seaman303/22/2026
215 Seaman Associates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green Design208/17/2026
Roman S. Mardarewich Architect310/15/2021
Enthink Engineers107/20/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKY Management Group603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JascoScaffold1507/08/2026
Impact PlumbingPlumbing607/08/2026
B Raj SunGeneral Contractor307/08/2026
Akala ConstructionScaffold211/19/2026
B Raj SunScaffold203/21/2026
LXS Airspecialty_contractor107/08/2026
Ariston ChimneyGeneral Contractor108/15/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Butterfield & O'Connor4189208/17/2026
A&B World Consulting5704110/21/2020
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/17/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M00372705-I1-SH
09/14/2026
Objection raised — Scope
08/20/2026
Permit renewed — Sidewalk Shed
Renewed with changes
M00372705-I1-SH
08/17/2026
Filed — Alteration
REPOINTING AND BRICK REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION.
M01037931-P1
218 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAkala Construction11/17/2026
DOB NOWSidewalk ShedPermit IssuedAkala Construction08/20/2026
DOB NOWGeneral ConstructionPermit IssuedB Raj Sun05/27/2026
DOB NOWSidewalk ShedPermit IssuedJasco05/27/2026
DOB NOWSuspended ScaffoldPermit IssuedHarmel Singh03/11/2026
DOB NOWGeneral ConstructionPermit IssuedB Raj Sun05/29/2025
DOB NOWSidewalk ShedPermit IssuedJasco05/27/2025
DOB NOWSuspended ScaffoldPermit IssuedHarmel Singh03/14/2025
DOB NOWSuspended ScaffoldSigned-offHarmel Singh08/09/2024
DOB NOWSidewalk ShedPermit IssuedJasco06/14/2024
DOB NOWSidewalk ShedPermit IssuedJasco06/29/2023
DOB NOWMechanical SystemsSigned-offLXS Air09/12/2022
DOB NOWSidewalk ShedPermit IssuedJasco07/07/2022
DOB NOWSidewalk ShedPermit IssuedJasco07/19/2021
DOB NOWPlumbingSigned-offImpact Plumbing04/27/2021
DOB NOWSidewalk ShedPermit IssuedJasco07/21/2020
BISOTISSUEDB Raj Sun08/17/2021
BISOTISSUEDB Raj Sun10/11/2020
BISOTISSUEDB Raj Sun02/26/2019
BISOTISSUEDAriston Chimney08/15/2018
BISBLISSUEDIrving Bauer12/03/1997
1 project · most recent 08/14/2020
FiledStatusContractorScope
08/14/2020Permit IssuedRichard Neu—
1 project · most recent 03/11/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/11/2025Permit IssuedDosanjh ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/18/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/03/2026FinalVicente Varelaprogress
06/03/2026Tenant Protection Plan ComplianceBRIAN T. O'CONNORspecial
06/03/2026Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
06/03/2026MasonryBRIAN T. O'CONNORspecial
05/06/2024Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
04/18/2024FinalVicente Varelaprogress
04/18/2024Tenant Protection Plan ComplianceBRIAN T. O'CONNORspecial
04/18/2024MasonryBRIAN T. O'CONNORspecial
10/14/2020Mechanical SystemsAlexander Bomsteinspecial
10/14/2020Duct leakage testing ROMAN MARDAREWICHenergy_progress
10/14/2020FinalROMAN MARDAREWICHprogress
79 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account