Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof23p · 3 filings · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Application filed herewith for a part. second floor rear addition. Minor interior renov. of bathrms and kit. on upper fls. New porch in rear yard. No change in use, egress or occupancy.
On file for this project
18 documents · 2 drawing sheets
Application filed herewith modifications to existing plumbing sanitary and storm system. No change in use, egress or occupancy.
On file for this project
30 documents · 5 drawing sheets
Application filed herewith for modification of existing HVAC system. No change in use, egress or occupancy.
On file for this project
14 documents · 3 drawing sheets
Floor 331p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Application filed for structural modification for new second floor addition.
On file for this project
6 documents · 1 drawing sheet
Application filed herewith for a part. second floor rear addition. Minor interior renov. of bathrms and kit. on upper fls. New porch in rear yard. No change in use, egress or occupancy.
On file for this project
18 documents · 2 drawing sheets
Application filed herewith modifications to existing plumbing sanitary and storm system. No change in use, egress or occupancy.
On file for this project
30 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 227p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Application filed for structural modification for new second floor addition.
On file for this project
6 documents
Application filed herewith for a part. second floor rear addition. Minor interior renov. of bathrms and kit. on upper fls. New porch in rear yard. No change in use, egress or occupancy.
On file for this project
18 documents
Application filed herewith modifications to existing plumbing sanitary and storm system. No change in use, egress or occupancy.
On file for this project
30 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1Unit 1F26p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Application filed for structural modification for new second floor addition.
On file for this project
6 documents
Application filed herewith for a part. second floor rear addition. Minor interior renov. of bathrms and kit. on upper fls. New porch in rear yard. No change in use, egress or occupancy.
On file for this project
18 documents
Application filed herewith modifications to existing plumbing sanitary and storm system. No change in use, egress or occupancy.
On file for this project
30 documents
Latest 3 of 4 filings on this floor.
Cellar35p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Application filed for structural modification for new second floor addition.
On file for this project
6 documents · 1 drawing sheet
Application filed herewith for a part. second floor rear addition. Minor interior renov. of bathrms and kit. on upper fls. New porch in rear yard. No change in use, egress or occupancy.
On file for this project
18 documents · 2 drawing sheets
Application filed herewith modifications to existing plumbing sanitary and storm system. No change in use, egress or occupancy.
On file for this project
30 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Site & exteriorLight duty pipe scaffold8p · 2 filings · 4 docs
EquipmentGeneralPlumbingOther
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
2 documents · 4 drawing sheets
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Filed — no permit issuedBrick repair and re-pointing5p · 1 filing · 6 docs
ArchitectureGeneralStructural
Application being for the reparation of the building facade that includes stone lintel, crack, and brick repair, No change in use, egress, or occupancy.
On file for this project
6 documents · 5 drawing sheets