← Back
Gas station with retail store
2600 BOSTON ROAD
BRONX · Allerton · BIN 2051552
💬 Discuss this project
2002Year Built
1Stories
G3Building Class
C8-1Zoning
4,136 sfGross Floor Area
1Units
1 Open Violation ▸
Gas station with retail store · Owner of record: NAPA REALTY CORP · 24,000 sf lot · 0.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof5p · 3 filings · 20 docs
Floor 112p · 3 filings · 20 docs
Site & exterior14p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LARGAVISTA COMPANIES1407/08/2026
GNKBIENERGY1003/22/2026
HIGH POINT ENGINEERING307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAYMOND HO ARCHITECT, PLLC212/07/2023
FLORINELA MURESAN601/20/2023
VAA308/04/2022
HIGH POINT ENGINEERING108/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH POINT ENGINEERING103/21/2026
VAA903/21/2026
BELFIORE CONSUTLANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MPC PLUMBING HEATING INGeneral Contractor603/22/2026
GEMSTAR CONSTRUCTION CORP.General Contractor207/08/2026
MPC PLUMBING & HEATING INCPlumbing207/08/2026
ACTIVE SIGNSScaffold207/08/2026
DELTA PHASE ELEC'L CORP.Electrical103/22/2026
RESTORE AMERICA, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MWB ENGINEERING7942201/20/2023
HIGH POINT ENGINEERING1151108/09/2019
Building Lifecycle
All (95)Filed (12)Permit Issued (6)Signed Off (6)Violation (16)Inspection (5)Objection (20)Special Inspection (30)
12/19/2023
Signed off — Alteration
Replace existing canopy sign for gas station. No change to occupancy egress or use.
X00486919-I1
12/07/2023
Filed — Alteration
Replace existing canopy sign for gas station. No change to occupancy egress or use.
X00486919-P1
02/09/2023
Signed off — Alteration
Propose to install and alter mechanical equipment as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
X00705530-I1
01/23/2023
Special inspection requirement — Final
FLORINELA MURESAN
01/23/2023
Special inspection requirement — Mechanical Systems
FLORINELA MURESAN
01/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
FLORINELA MURESAN
01/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FLORINELA MURESAN
01/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
FLORINELA MURESAN
01/20/2023
Filed — Alteration
Propose to install and alter mechanical equipment as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
X00705530-P1
01/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
FLORINELA MURESAN
01/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
FLORINELA MURESAN
01/19/2023
Special inspection requirement — Final
FLORINELA MURESAN
01/19/2023
Special inspection requirement — Mechanical Systems
FLORINELA MURESAN
01/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FLORINELA MURESAN
10/12/2022
Signed off — Alteration
Propose to install and repalce plumbing fixtures as per plans filed herewith. No change in use egress or occuapcny is proposed under this application.
X00704123-I1
09/29/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/27/2022
Special inspection requirement — Energy Code Compliance Inspections
FLORINELA MURESAN
09/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FLORINELA MURESAN
09/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
FLORINELA MURESAN
09/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
FLORINELA MURESAN
09/26/2022
Filed — Alteration
Propose to install and repalce plumbing fixtures as per plans filed herewith. No change in use egress or occuapcny is proposed under this application.
X00704123-P3
09/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FLORINELA MURESAN
09/16/2022
Special inspection requirement — HVAC-R and service water heating system controls
FLORINELA MURESAN
09/16/2022
Special inspection requirement — HVAC-R and service water heating equipment
FLORINELA MURESAN
09/16/2022
Special inspection requirement — Energy Code Compliance Inspections
FLORINELA MURESAN
09/13/2022
Filed — Alteration
Propose to install and repalce plumbing fixtures as per plans filed herewith. No change in use egress or occuapcny is proposed under this application.
X00704123-P2
08/23/2022
Filed — Alteration
Propose to install and repalce plumbing fixtures as per plans filed herewith. No change in use egress or occuapcny is proposed under this application.
X00704123-P1
08/17/2022
Special inspection requirement — HVAC-R and service water heating system controls
FLORINELA MURESAN
08/17/2022
Special inspection requirement — Energy Code Compliance Inspections
FLORINELA MURESAN
08/17/2022
Special inspection requirement — HVAC-R and service water heating equipment
FLORINELA MURESAN
08/17/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FLORINELA MURESAN
08/05/2022
Signed off — Alteration
Propose to install a wall sign as per plans filed herewith. No change in use egress or occuapcny is proposed under this application.
X00751701-I1
08/05/2022
Special inspection requirement — Final
JAMES VASSALOTTI
08/04/2022
Filed — Alteration
Propose to install a wall sign as per plans filed herewith. No change in use egress or occuapcny is proposed under this application.
X00751701-P1
08/04/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/03/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/03/2022
Special inspection requirement — Final
08/02/2022
Signed off — Alteration
X00705499-I1
07/22/2022
Permit issued — Sign
X00751701-I1-SG
06/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/06/2022
Filed — Alteration
Propose to install a wall sign as per plans filed herewith. No change in use egress or occuapcny is proposed under this application.
X00751701-I1
04/27/2022
Permit issued — Plumbing
X00704123-I1-PL
04/26/2022
Permit issued — Mechanical Systems
X00705530-I1-MS
04/22/2022
Filed — Alteration
Propose to install and alter mechanical equipment as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
X00705530-I1
04/21/2022
Filed — Alteration
Propose to install and repalce plumbing fixtures as per plans filed herewith. No change in use egress or occuapcny is proposed under this application.
X00704123-I1
04/19/2022
Permit issued — General Construction
X00705499-I1-GC
04/01/2022
Filed — Alteration
X00705499-I1
04/01/2022
Special inspection requirement — Final
JAMES VASSALOTTI
04/01/2022
Special inspection requirement — Interior lighting power
JAMES VASSALOTTI
04/01/2022
Special inspection requirement — Lighting controls
JAMES VASSALOTTI
05/25/2021
Permit issued — Sign
X00486919-I1-SG
04/16/2021
Objection raised — Admin
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Admin
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Admin
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Admin
04/16/2021
Objection resolved — Addressed
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offACTIVE SIGNS INC07/22/2022
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN04/27/2022
DOB NOWMechanical SystemsSigned-offGEMSTAR CONSTRUCTION CORP.04/26/2022
DOB NOWGeneral ConstructionSigned-offGEMSTAR CONSTRUCTION CORP.04/19/2022
DOB NOWSignSigned-offACTIVE SIGNS INC05/25/2021
DOB NOWMechanical SystemsSigned-offRESTORE AMERICA, INC01/24/2020
BISMHISSUEDMASTER FIRE MECH CORP02/05/2015
BISPLISSUEDMAJOR SEWER AND WATER CORP.10/24/2002
BISCCISSUEDMAJOR HOMES CORP08/08/2002
BISCCISSUEDTYREE ORGANIZATION08/08/2002
BIS—ISSUEDACE HIGH CRANE INC06/21/2002
BIS—ISSUEDACE HIGH CRANE INC06/21/2002
BIS—ISSUEDACE HIGH CRANE INC06/21/2002
BIS—ISSUEDACE HIGH CRANE INC06/21/2002
BISFPISSUEDFIRE GUARD OF LONG ISLAND INC05/09/2002
BISOTISSUEDTYREE ORGANIZATION04/15/2002
BISOTISSUEDTYREE ORGANIZATION04/15/2002
BISOTISSUEDTYREE ORGANIZATION04/15/2002
BISOTISSUEDTYREE ORGANIZATION04/15/2002
BIS—ISSUEDSALOMONE BROS INC03/14/2002
BISEQISSUEDTYREE ORGANIZATION03/13/2002
BIS—ISSUEDTYREE ORGANIZATION03/13/2002
BISEQISSUEDSALOMONE BROTHERS, INC.03/08/2002
2 projects · most recent 06/09/2022
General Wiring
FiledStatusContractorScope
06/09/2022Permit IssuedDELTA PHASE ELEC'L CORP.General Wiring
07/10/2018CompleteROBERT S. COVELLO—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/29/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/03/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
01/23/2023FinalFLORINELA MURESANprogress
01/23/2023Mechanical SystemsFLORINELA MURESANspecial
01/23/2023HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
01/23/2023HVAC-R and service water piping design and insulationFLORINELA MURESANenergy_progress
01/23/2023HVAC-R and service water heating equipmentFLORINELA MURESANenergy_progress
01/19/2023HVAC-R and service water heating equipmentFLORINELA MURESANenergy_progress
01/19/2023HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
01/19/2023FinalFLORINELA MURESANprogress
01/19/2023Mechanical SystemsFLORINELA MURESANspecial
01/19/2023HVAC-R and service water piping design and insulationFLORINELA MURESANenergy_progress
09/27/2022Energy Code Compliance InspectionsFLORINELA MURESANprogress
09/27/2022HVAC-R and service water piping design and insulationFLORINELA MURESANenergy_progress
09/27/2022HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
09/27/2022HVAC-R and service water heating equipmentFLORINELA MURESANenergy_progress
09/16/2022HVAC-R and service water piping design and insulationFLORINELA MURESANenergy_progress
09/16/2022HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
09/16/2022HVAC-R and service water heating equipmentFLORINELA MURESANenergy_progress
09/16/2022Energy Code Compliance InspectionsFLORINELA MURESANprogress
08/17/2022HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
08/17/2022Energy Code Compliance InspectionsFLORINELA MURESANprogress
08/17/2022HVAC-R and service water heating equipmentFLORINELA MURESANenergy_progress
08/17/2022HVAC-R and service water piping design and insulationFLORINELA MURESANenergy_progress
08/05/2022FinalJAMES VASSALOTTIprogress
08/03/2022Final—progress
04/01/2022FinalJAMES VASSALOTTIprogress
Latest 25 of 32.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/25/2026X00486919-P1Request digital key ↗
08/24/2026X00705499-I1Request digital key ↗
08/24/2026X00704123-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00208296-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
02/05/2015220424618Open ↗
02/05/2015220424618Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/28/2015220424618Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature27
09/28/2026X00704123-P3Open ↗
09/28/2026X00704123-P3Open ↗
09/28/2026X00704123-P3Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026X00208296-I1Open ↗
08/25/2026X00486919-I1Open ↗
08/25/2026X00486919-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X00705530-P1Open ↗
08/28/2026X00705530-I1Open ↗
08/27/2026X00208296-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/15/2015220424618Open ↗
01/28/2015220424618Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/28/2015220424618Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/28/2015220424618Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
06/15/2015220424618Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/28/2015220424618Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026X00704123-I1Open ↗
08/13/2026X00705530-I1Open ↗
08/13/2026X00705499-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00705530-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/15/2015220424618Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/15/2015220424618Open ↗
01/28/2015220424618Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/28/2015220424618Open ↗