Condo, residential tower (mixed-use, multi-family elevator) [derived]
One Strivers Row Condominium
2605 FREDRICK DOUGLASS BL · BIN 1088730
💬 Discuss this project
1894Year Built
7Stories
RMBuilding Class
R7-2Zoning
20,844 sfGross Floor Area
16Units
Rent Stabilized1 Open Violation ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 4,514 sf lot · 4.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY1807/08/2026
HARLEM PROPERTY MANAGEMENT204/11/2026
ONE STRIVERS ROW CONDOMINIUM503/22/2026
PHIDEN CONSTRUCTION LLC203/22/2026
GRACE IRON WORKS INC103/22/2026
CARDINAL TRUCKING INC.103/22/2026
AG REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
JON LIBASCI RA403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor1907/08/2026
LCS RESTORATION CORPGeneral Contractor507/08/2026
BAY RESTORATION CORPGeneral Contractor206/27/2026
ALEXANDER EUGENEElectrical103/21/2026
DIMOS PAPADIMASElectrical103/21/2026
UNIQUE MECHANICAL CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616103/26/2026
BKH ARCHITECT, PLLC6255103/04/2026
WRG ENGINEERING, P.C.4403112/19/2025
LUKE LICALZI P.E.,P.C.3679207/28/2022
Building Lifecycle
All (118)Filed (10)Permit Issued (13)Signed Off (4)Facade (FISP) (9)Violation (60)Inspection (3)Special Inspection (19)
04/09/2026
Permit issued — General Construction
M01327373-I1-GC
03/26/2026
Filed — Alteration
ALTERATION TYPE 3 - INSTALL SUPPORTED PIPE SCAFFOLDING AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
M01372876-I1
03/25/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
03/23/2026
Filed — Alteration
CONSTRUCTION EQUIPMENT- SIDEWALK- SHED PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION, LIVE LOAD 300 # PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 BC
M01326787-P1
03/10/2026
Signed off — Alteration
DIRECT REPLACE RTU-1 ON ROOF, FURNACE & COOLING COIL FOR APARTMENT 5B
M01367103-I1
03/06/2026
Permit issued — Mechanical Systems
M01367103-I1-GC-CX
03/04/2026
Filed — Alteration
DIRECT REPLACE RTU-1 ON ROOF, FURNACE & COOLING COIL FOR APARTMENT 5B
M01367103-I1
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brandon Hamchuk
03/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Brandon Hamchuk
03/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
Brandon Hamchuk
03/04/2026
Special inspection requirement — Final
Brandon Hamchuk
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Brandon Hamchuk
03/04/2026
Special inspection requirement — Preliminary
Brandon Hamchuk
03/04/2026
Special inspection requirement — Air barrier - visual inspection
Brandon Hamchuk
03/04/2026
Special inspection requirement — Maintenance information
Brandon Hamchuk
03/04/2026
Special inspection requirement — Mechanical Systems
Brandon Hamchuk
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Brandon Hamchuk
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Brandon Hamchuk
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Brandon Hamchuk
12/19/2025
Filed — Alteration
LEAK REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01327373-I1
12/19/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Winston Garcia
12/02/2025
Permit issued — Sidewalk Shed
M01326787-I1-SH
12/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Winston Garcia
12/02/2025
Special inspection requirement — Final
Hans Arntsen
12/02/2025
Special inspection requirement — Air barrier - visual inspection
Hans Arntsen
12/01/2025
Filed — Alteration
CONSTRUCTION EQUIPMENT- SIDEWALK- SHED PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION, LIVE LOAD 300 # PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 BC
M01326787-I1
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
12/30/2022
Cycle 9 facade report signed — SAFE
12/09/2022
Cycle 9 facade inspection completed
11/18/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD
M00377370-I1
11/18/2022
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED
M00377369-I1
11/10/2022
Violation issued (ECB, closed)
Local Law
09/29/2022
Permit issued — Sidewalk Shed
M00377369-I1-SH
09/08/2022
Signed off — Alteration
facade repair
M00560120-I1
09/01/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/15/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/11/2022
Permit issued — Supported Scaffold
M00377370-I1-SF
08/08/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/02/2022
Special inspection requirement — Final
Mark LiCalzi
08/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mark LiCalzi
07/28/2022
Filed — Alteration
facade repair
M00560120-P1
05/18/2022
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
M00735574-I1
05/18/2022
Permit issued — Supported Scaffold
M00735574-I1-SH
05/18/2022
Permit issued — Supported Scaffold
M00735574-I1-SF
04/01/2022
Permit issued — Structural
M00560120-I1-GC-CX
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
I
09/15/2021
Filed — Alteration
facade repair
M00560120-I1
07/29/2021
Permit issued — Supported Scaffold
M00377370-I1-SF
07/28/2021
Permit issued — Sidewalk Shed
M00377369-I1-SH
07/13/2021
Permit issued — Supported Scaffold
M00377370-I1-SF
04/01/2021
Violation issued (HPD, closed)
A
07/30/2020
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD
M00377370-I1
07/30/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED
M00377369-I1
07/30/2020
Permit issued — Sidewalk Shed
M00377369-I1-SH
07/30/2020
Permit issued — Supported Scaffold
M00377370-I1-SF
07/17/2020
Cycle 9 facade report submitted
06/30/2020
Cycle 8 facade report signed — No Report Filed
06/09/2020
Cycle 8 facade inspection completed
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBAY RESTORATION CORP04/09/2026
DOB NOWMechanical SystemsSigned-offUNIQUE MECHANICAL CORP03/06/2026
DOB NOWSidewalk ShedPermit IssuedBAY RESTORATION CORP12/02/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/29/2022
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP08/11/2022
DOB NOWSupported ScaffoldPermit IssuedLCS RESTORATION CORP05/18/2022
DOB NOWSupported ScaffoldPermit IssuedLCS RESTORATION CORP05/18/2022
DOB NOWStructuralSigned-offLCS RESTORATION CORP04/01/2022
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP07/29/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP07/28/2021
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP07/13/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP07/30/2020
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP07/30/2020
BISOTISSUEDWINSTAR RESTORATION INC09/16/2020
BISOTISSUEDWINSTAR CONTRACTING INC08/19/2020
BISOTISSUEDNTS CONTRACTORS, CORP01/02/2019
BISMHISSUEDDYNAMIC AIR CONDITIONING09/14/2018
BISPLISSUEDAUTHENTIC PLBG CORP10/17/2017
BISOTISSUEDNTS CONTRACTING LLC10/12/2017
BISOTISSUEDJC HOME DEVELOPMENT MANAG01/23/2017
BISBLISSUEDSUNSET PLBG & FIRE PROT01/05/2012
BISPLISSUEDSUNSET PLBG & FIRE PROT12/13/2011
BISBLISSUEDSUNSET PLBG & FIREPROTECTION02/02/2007
BISSPISSUEDSUNSET PLUMBING & FIRE PROTECTIO10/03/2006
BISOTISSUEDPHIDEN CONSTR. LLC07/17/2006
BIS—ISSUEDPHIDEN CONSTRUCTION, LLC07/17/2006
BISMHISSUEDPHIDEN CONSTRUCTION07/14/2006
BISPLISSUEDSUNSET PLUMBING & FIRE CORP.09/12/2005
BISPLISSUEDSUNSET PLUMB FIRE PROT. CORP08/03/2005
BIS—ISSUEDPHIDEN CONSTRUCTION, LLC04/26/2005
BISEQISSUEDJ & G GENERAL CONTRACTING INC04/25/2005
BISOTISSUEDPHIDEN CONSTR. LLC04/20/2005
BISEQISSUEDJ AND G GENERAL CONTRACTING INC04/05/2005
BISOTISSUEDWILSON HARVEY09/21/2000
BISOTISSUEDN/A08/31/1999
BISOTISSUEDN/A04/25/1995
BISOTISSUEDN/A11/22/1993
2 projects · most recent 12/04/2025
FiledStatusContractorScope
12/04/2025Permit IssuedVERTEX ELECTRIC CORP.—
12/13/2020Permit IssuedHIGH QUALITY ELECTRIC OF—
3 projects · most recent 03/26/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/26/2026——Scaffold
03/23/2026Permit IssuedBAY RESTORATION CORPSidewalk Shed
05/18/2022Permit IssuedLCS RESTORATION CORPScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/01/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/15/2022Fail-Final General Construction Non-Directive 14FailView ↗
08/08/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
03/25/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
03/04/2026Fire-Resistant Penetrations and JointsBrandon Hamchukspecial
03/04/2026Structural Stability – Alterations of existing buildingsBrandon Hamchukspecial
03/04/2026Tenant Protection Plan ComplianceBrandon Hamchukspecial
03/04/2026FinalBrandon Hamchukprogress
03/04/2026Energy Code Compliance InspectionsBrandon Hamchukprogress
03/04/2026PreliminaryBrandon Hamchukprogress
03/04/2026Air barrier - visual inspectionBrandon Hamchukenergy_progress
03/04/2026Maintenance informationBrandon Hamchukenergy_progress
03/04/2026Mechanical SystemsBrandon Hamchukspecial
03/04/2026HVAC-R and service water heating equipmentBrandon Hamchukenergy_progress
03/04/2026HVAC-R and service water piping design and insulationBrandon Hamchukenergy_progress
03/04/2026HVAC-R and service water heating system controlsBrandon Hamchukenergy_progress
12/19/2025Exterior Insulation and Finish Systems (EIFS)Winston Garciaspecial
12/02/2025Tenant Protection Plan ComplianceWinston Garciaspecial
12/02/2025FinalHans Arntsenprogress
12/02/2025Air barrier - visual inspectionHans Arntsenenergy_progress
08/02/2022FinalMark LiCalziprogress
08/02/2022Structural Stability – Alterations of existing buildingsMark LiCalzispecial
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
09/02/2026M00735574-I1Request digital key ↗
09/02/2026M00560120-I1Request digital key ↗
09/02/2026M00560120-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00377369-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00377370-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION15
08/27/2020140911011Open ↗
06/26/2020140911011Open ↗
11/26/2019123791405Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION9
09/16/2020140911011Open ↗
08/19/2020123791405Open ↗
01/03/2019122944724Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00377370-I1Open ↗
09/02/2026M00560120-I1Open ↗
08/18/2026M01367103-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026M01367103-I1Open ↗
09/02/2026M01367103-I1Open ↗
09/02/2026M01367103-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/26/2019123791405Open ↗
08/20/2019122944724Open ↗
01/16/2019123239398Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026M01367103-I1Open ↗
09/01/2026M00560120-I1Open ↗
08/26/2026M01372876-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
09/14/2018123239398Open ↗
12/08/2017123239398Open ↗
01/24/2017122944724Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/26/2020140911011Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/09/2011120919676Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/08/2017123239398Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING3
02/24/2012120919676Open ↗
02/13/2012120919676Open ↗
12/09/2011120919676Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/06/2017122944724Open ↗
12/04/2017122944724Open ↗
01/24/2017122944724Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
03/05/2012120919676Open ↗
02/08/2012120919676Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/14/2019123239398Open ↗
▸BISEQUIPMENT USE PERMITS1
01/14/2019123239398Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/09/2011120919676Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
11/26/2019123791405Open ↗
12/08/2017123239398Open ↗
01/24/2017122944724Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
09/14/2020140911011Open ↗
08/28/2020140911011Open ↗
11/26/2019123791405Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026M00560120-I1Open ↗
08/13/2026M01327373-I1Open ↗
08/13/2026M00560120-P1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/26/2019123791405Open ↗
01/16/2019123239398Open ↗
12/08/2017123239398Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/17/2020123791405Open ↗
08/20/2019122944724Open ↗
01/16/2019123239398Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/17/2023140911011Open ↗
09/14/2020140911011Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/17/2023140911011Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/17/2023140911011Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/17/2023140911011Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/09/2011120919676Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/17/2023140911011Open ↗
02/14/2023140911011Open ↗
09/17/2020123791405Open ↗
Showing 3 of 7 on file for this type
▸BISPOST-INSTALLED ANCHORS2
02/14/2023140911011Open ↗
09/17/2020123791405Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/20/2019122944724Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
09/17/2020123791405Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/21/2023140911011Open ↗
09/17/2020123791405Open ↗
08/20/2019122944724Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
10/12/2017122944724Open ↗
10/12/2017122944724Open ↗
▸BISFINAL1
02/17/2023140911011Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/09/2011120919676Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/03/2019122944724Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT8
09/17/2020123791405Open ↗
06/26/2020140911011Open ↗
11/26/2019123791405Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
06/26/2020140911011Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/17/2023140911011Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION8
09/14/2020140911011Open ↗
08/28/2020140911011Open ↗
08/21/2020140911011Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM7
08/20/2019122944724Open ↗
05/08/2019122944724Open ↗
01/16/2019123239398Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET4
11/26/2019123791405Open ↗
12/08/2017123239398Open ↗
01/24/2017122944724Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/26/2020140911011Open ↗