Elevator apt, fireproof with stores
2605 SNYDER AVENUE
BROOKLYN · BIN 3429672
💬 Discuss this project
2024Year Built
7Stories
D6Building Class
R6Zoning
67,822 sfGross Floor Area
65Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: ROGERS PLAZA NY LLC · 9,849 sf lot · 6.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof104p · 2 filings · 20 docs
Floor 494p · 1 filing · 20 docs
Floor 395p · 1 filing · 20 docs
Floor 2100p · 1 filing · 20 docs
Floor 196p · 1 filing · 20 docs
Cellar96p · 1 filing · 20 docs
1 job · most recent 04/10/2025
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2025Signed-offMANHATTAN MANAGEMENTAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Mitsubishi Electric PUY A42NKA7 42,000 BTU · Vrf Outdoor ×5
Heat / Cool
Daikin RXTQ36TBVJUA 36,000 BTU · Vrf Outdoor ×165
RXTQ48TBVJUA 48,000 BTU · Vrf Outdoor ×35
Aaon RN-013-6-0-EB09-3GB 158,900 BTU · Condensing Unit ×5
1 job · most recent 04/10/2025
Sprinkler System
FiledStatusContractorScope
04/10/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 job · most recent 04/10/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/10/2025Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
5 jobs · most recent 04/16/2025
General Wiring
FiledStatusContractorScope
04/16/2025CompleteJAM ELECTRICAL CORP—
02/24/2025CompleteCOUNTY ELECL CONTRACTOR IGeneral Wiring
05/02/2024CompleteCOUNTY ELECL CONTRACTOR I—
05/02/2024CompleteCOUNTY ELECL CONTRACTOR I—
03/19/2024CompleteNASH ELECTRIC SERVICES IN—
1 job · most recent 04/10/2025
Concrete
FiledStatusContractorScope
04/10/2025Signed-offPRIME PIPING & HEATING INConcrete
Building Lifecycle
All (190)Filed (29)Permit Issued (27)Signed Off (14)Violation (14)Inspection (15)Objection (58)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
10/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2025
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
04/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
04/23/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
04/23/2025
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
04/23/2025
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
04/23/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Soorjbally Harilall
04/23/2025
Special inspection requirement — Lighting controls
Soorjbally Harilall
04/23/2025
Special inspection requirement — Interior lighting power
Soorjbally Harilall
04/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
04/23/2025
Special inspection requirement — Maintenance information
Soorjbally Harilall
04/23/2025
Special inspection requirement — Air barrier continuity plan testing
Soorjbally Harilall
04/23/2025
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
04/23/2025
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
04/23/2025
Special inspection requirement — Fenestration areas
Soorjbally Harilall
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/23/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
04/23/2025
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
04/23/2025
Special inspection requirement — Metering
Soorjbally Harilall
04/10/2025
Filed — New Building
INSTALLATION OF NEW AUTOMATIC COMBINED CLASS I STANDPIPE AND SPRINKLER SYSTEM FOR NEW BUILDING AS PER NYC BC 2014, FC 2014, NFPA 13 2007, NFPA 142007 & NFPA 20 2007 ALL AS AMENDED BY NYC BC 2014 APPENDIX Q. FILED SUBSEQUENT TO NB FILING B00588575
B00588575-A8
04/09/2025
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
04/09/2025
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
04/09/2025
Special inspection requirement — Lighting controls
Soorjbally Harilall
04/09/2025
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
04/09/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
04/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
04/09/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Soorjbally Harilall
04/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
04/09/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
03/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2025
Signed off — New Building
INSTALLATION OF NEW AUTOMATIC COMBINED CLASS I STANDPIPE AND SPRINKLER SYSTEM FOR NEW BUILDING AS PER NYC BC 2014, FC 2014, NFPA 13 2007, NFPA 142007 & NFPA 20 2007 ALL AS AMENDED BY NYC BC 2014 APPENDIX Q. FILED SUBSEQUENT TO NB FILING B00588575
B00588575-S5
03/12/2025
Objection resolved — Addressed
03/11/2025
Objection raised — Other
03/10/2025
Objection resolved — Addressed
03/07/2025
Signed off — New Building
INSTALLATION OF NEW AUTOMATIC COMBINED CLASS I STANDPIPE AND SPRINKLER SYSTEM FOR NEW BUILDING AS PER NYC BC 2014, FC 2014, NFPA 13 2007, NFPA 142007 & NFPA 20 2007 ALL AS AMENDED BY NYC BC 2014 APPENDIX Q. FILED SUBSEQUENT TO NB FILING B00588575
B00588575-S4
03/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/03/2025
Signed off — New Building
INSTALLATION OF NEW AUTOMATIC COMBINED CLASS I STANDPIPE AND SPRINKLER SYSTEM FOR NEW BUILDING AS PER NYC BC 2014, FC 2014, NFPA 13 2007, NFPA 142007 & NFPA 20 2007 ALL AS AMENDED BY NYC BC 2014 APPENDIX Q. FILED SUBSEQUENT TO NB FILING B00588575
B00588575-S1
03/03/2025
Signed off — Alteration
install construction site fence
B00967111-I1
02/28/2025
Signed off — New Building
INSTALLATION OF NEW AUTOMATIC COMBINED CLASS I STANDPIPE AND SPRINKLER SYSTEM FOR NEW BUILDING AS PER NYC BC 2014, FC 2014, NFPA 13 2007, NFPA 142007 & NFPA 20 2007 ALL AS AMENDED BY NYC BC 2014 APPENDIX Q. FILED SUBSEQUENT TO NB FILING B00588575
B00588575-S2
02/27/2025
Signed off — Alteration
Installation of a 4 point suspended scaffold.
B01090524-I1
02/13/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/07/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/06/2025
Objection raised — Other
02/04/2025
Permit issued — Standpipe
B00588575-S4-EW-SD
02/04/2025
Permit issued — Standpipe
B00588575-S4-EW-SP
02/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/04/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/30/2025
Permit issued — Plumbing
B00588575-S2-PL
01/29/2025
Signed off — Alteration
B01021861-I1
01/29/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01034315-I1
01/29/2025
Signed off — Alteration
B01022827-I1
01/29/2025
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01021851-I1
01/29/2025
Signed off — Alteration
B01022850-I1
Latest 60 of 190 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARTIST CONSTRUCTION10007/08/2026
SMART CONSULTING NY503/22/2026
ROGERS PLAZA NY LLC103/22/2026
MANHATTAN MANAGEMENT1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S. WIEDER ARCHITECT P.C.704/10/2025
JRS CONSULTING1001/16/2025
KZ ENGINEERING, P.C108/05/2024
TITAN ENGINEERS PC606/20/2024
TOHFAZ UDDIN PE PC504/26/2024
GRID DRAFTING AND CONSULTING LLC111/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING3403/21/2026
ADVANCED BUILDERS SERVICES603/21/2026
SYNERGY BUILDING CONSULTANTS603/21/2026
SIERRA SAFETY CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN MANAGEMENTGeneral Contractor3307/08/2026
PRECISION HOIST & SCAFFO*General Contractor1207/08/2026
PRIME PIPING & HEATING INFire Protection407/08/2026
COUNTY ELECL CONTRACTOR IElectrical203/22/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
ALL STAR 1 LLCGeneral Contractor107/08/2026
S WIEDER ARCHITECTGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91682004/10/2025
KZ ENGINEERING, P.C.4665108/05/2024
TOHFAZ UDDIN P.E.2001104/26/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offA M B MECHANICAL INC02/04/2025
DOB NOWStandpipeSigned-offA M B MECHANICAL INC02/04/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/30/2025
DOB NOWCurb CutSigned-offMANHATTAN MANAGEMENT11/06/2024
DOB NOWSuspended ScaffoldSigned-offPRECISION HOIST & SCAFFO*08/09/2024
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*04/26/2024
DOB NOWStructuralSigned-offMANHATTAN MANAGEMENT03/29/2024
DOB NOWSupport of ExcavationSigned-offMANHATTAN MANAGEMENT03/29/2024
DOB NOWEarth WorkSigned-offMANHATTAN MANAGEMENT03/29/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*03/26/2024
DOB NOWGeneral ConstructionPermit IssuedMANHATTAN MANAGEMENT03/21/2024
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*03/21/2024
DOB NOWConstruction FenceSigned-offPRECISION HOIST & SCAFFO*03/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*03/20/2024
DOB NOWMechanical SystemsSigned-offMANHATTAN MANAGEMENT02/29/2024
DOB NOWStructuralSigned-offMANHATTAN MANAGEMENT02/07/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/24/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC01/24/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC01/24/2024
DOB NOWGeneral ConstructionPermit IssuedMANHATTAN MANAGEMENT12/05/2023
DOB NOWConstruction FenceSigned-offMANHATTAN MANAGEMENT11/29/2023
DOB NOWSupport of ExcavationSigned-offMANHATTAN MANAGEMENT10/13/2023
DOB NOWFoundationSigned-offMANHATTAN MANAGEMENT10/13/2023
DOB NOWConstruction FenceSigned-offMANHATTAN MANAGEMENT06/07/2023
DOB NOWFoundationSigned-offMANHATTAN MANAGEMENT05/30/2023
DOB NOWSupport of ExcavationSigned-offMANHATTAN MANAGEMENT03/11/2022
DOB NOWConstruction FenceSigned-offALL STAR 1 LLC01/24/2022
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
10/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/13/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/07/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/04/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/23/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/18/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 140
DateRequirementInspectorRole
04/23/2025Electrical motors and elevatorsSoorjbally Harilallenergy_progress
04/23/2025Insulation placement and R valuesSoorjbally Harilallenergy_progress
04/23/2025Energy Code Compliance InspectionsSoorjbally Harilallprogress
04/23/2025Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
04/23/2025Alternative Materials - OTCR Buildings Bulletin NumberSoorjbally Harilallspecial
04/23/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/23/2025Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
04/23/2025Fenestration areasSoorjbally Harilallenergy_progress
04/23/2025Fenestration air leakageSoorjbally Harilallenergy_progress
04/23/2025Lighting in dwelling unitsSoorjbally Harilallenergy_progress
04/23/2025Air barrier continuity plan testingSoorjbally Harilallenergy_progress
04/23/2025Air barrier - visual inspectionSoorjbally Harilallenergy_progress
04/23/2025Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
04/23/2025Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
04/23/2025Exterior lighting powerSoorjbally Harilallenergy_progress
04/23/2025Maintenance informationSoorjbally Harilallenergy_progress
04/23/2025MeteringSoorjbally Harilallenergy_progress
04/23/2025Lighting controlsSoorjbally Harilallenergy_progress
04/23/2025Interior lighting powerSoorjbally Harilallenergy_progress
04/09/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/09/2025Air barrier continuity plan testingSoorjbally Harilallenergy_progress
04/09/2025MeteringSoorjbally Harilallenergy_progress
04/09/2025Fenestration areasSoorjbally Harilallenergy_progress
04/09/2025Exterior lighting powerSoorjbally Harilallenergy_progress
04/09/2025Insulation placement and R valuesSoorjbally Harilallenergy_progress
Latest 25 of 140.
▾Documents — 201 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch38
08/26/2026B00967111-I1Request digital key ↗
08/25/2026B00588575-A8Request digital key ↗
08/25/2026B00588575-A8Request digital key ↗
Showing 3 of 38 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
03/29/2024340824941Open ↗
03/01/2022340824941Open ↗
02/26/2022340824941Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
09/11/2024340824941Open ↗
02/14/2022340824941Open ↗
02/02/2022340824941Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZoning Exhibit form (1-5)7
08/13/2026B00588575-P5Open ↗
08/13/2026B00588575-I1Open ↗
08/13/2026B00588575-A8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram7
08/13/2026B00588575-P5Open ↗
08/13/2026B00588575-A7Open ↗
08/13/2026B00588575-A7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00588575-I1Open ↗
▸Seals & Professional Certifications77
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/25/2026B00588575-A7Open ↗
08/25/2026B00588575-I1Open ↗
08/25/2026B00588575-S1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/05/2026B00588575-S2Open ↗
09/05/2026B00588575-S2Open ↗
08/30/2026B00588575-P3Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/05/2026B00588575-S2Open ↗
09/05/2026B00588575-S2Open ↗
08/28/2026B00588575-S1Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/02/2022340824941Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/02/2022340824941Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00588575-P5Open ↗
08/13/2026B00588575-I1Open ↗
08/13/2026B00588575-A8Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist5
08/25/2026B00588575-I1Open ↗
08/15/2026B00588575-P5Open ↗
08/14/2026B00588575-A7Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
02/02/2022340824941Open ↗
▸BISSTREET TREE CHECKLIST1
02/02/2022340824941Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00588575-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00588575-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00588575-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00588575-S1Open ↗
08/13/2026B00588575-S2Open ↗
08/13/2026B00588575-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00588575-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026B00588575-S6Open ↗
08/13/2026B00588575-S7Open ↗
08/13/2026B00588575-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram2
08/13/2026B00588575-S7Open ↗
08/13/2026B00588575-S6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00588575-S7Open ↗
08/13/2026B00588575-S6Open ↗
▸Approvals, Objections & Sign-offs4
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
12/24/2024340824941Open ↗
10/31/2024340824941Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/11/2024340824941Open ↗
09/11/2024340824941Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
09/11/2024340824941Open ↗
02/02/2022340824941Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/23/2022340824941Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/02/2022340824941Open ↗
▸Other Documents30
▸DOB NOWProperty Ownership Certification8
08/25/2026B00588575-I1Open ↗
08/25/2026B00588575-I1Open ↗
08/15/2026B00588575-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/13/2026B00588575-A8Open ↗
08/13/2026B00588575-I1Open ↗
08/13/2026B00588575-P5Open ↗
Showing 3 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
09/11/2024340824941Open ↗
03/11/2022340824941Open ↗
02/02/2022340824941Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00588575-P5Open ↗
08/13/2026B00588575-A7Open ↗
08/13/2026B00588575-A8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00588575-S7Open ↗
08/13/2026B00588575-S6Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/02/2022340824941Open ↗
▸DOB NOWCalculations1
08/13/2026B01090524-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01090524-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00588575-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00588575-I1Open ↗