ECB10/24/2016Rcny 48-02 construction super has not adequately performed duties as to maintain a safe construction site. The following unsafe conditions observed. 1-unsafe construction practices resulted in a partial collapNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 4,000 sf lot · 0.53 FAR built
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
Firm
Trade
Roles
Most Recent
New York Fast General
General Contractor
2
05/05/2017
Building Lifecycle
03/15/2018
Failure to provide required notification prior to the commencement of demolition. Noted: a check of department records @ time of insp indicates…
ECB violation · closed
10/24/2016
Failure to provide protection at sides of excavation. At time of inspection a 8'sheer cut was observed where a new foundation was being…
ECB violation · closed
10/24/2016
BC1704.1 designated controlled inspector (special inspector) has not adeqiately performed his inspection duties. The special inspector on record…
ECB violation · closed
10/24/2016
Failure to safeguard all persons and property affected by constructionoperations. Contractor failed to implement safe construction practiceswhile…
ECB violation · closed
10/24/2016
Rcny 48-02 construction super has not adequately performed duties as to maintain a safe construction site. The following unsafe conditions…