← Back
One story - permanent living quarter
261-03 69 AVENUE
QUEENS · BIN 4623372
💬 Discuss this project
1975Year Built
2Stories
A2Building Class
R1-2AZoning
4,475 sfGross Floor Area
1Units
4 Open Violations 2 unresolved · 2 paperwork only ▸
One story - permanent living quarter · 8,990 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivil
Roof4p · 2 filings · 12 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
V A BUILDERS203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2018$835K—— → —$187/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SELF EMPLOYED208/12/2026
KOJO SIMPSON ARCHITECT806/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GO SOLAR/GREEN NY LLCGeneral Contractor1803/21/2026
JOE ELECTRICAL INCElectrical103/22/2026
G.M.A. PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519106/19/2026
KOJO SIMPSON ARCHITECT1664312/08/2023
TRIANGLE INSPECTION & TES7495312/08/2023
Building Lifecycle
All (81)Filed (10)Permit Issued (7)Signed Off (3)Violation (11)Inspection (5)Objection (15)Special Inspection (30)
08/12/2026
Filed — Alteration
THE ERECTED OF AN 8-FOOT PLYWOOD CONSTRUCTION FENCE
Q01408572-S3
08/04/2026
Special inspection requirement — Footing and Foundation
08/04/2026
Special inspection requirement — Final
08/04/2026
Special inspection requirement — Concrete - Cast-In-Place
08/04/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/20/2026
Filed — Alteration
THE ERECTED OF AN 8-FOOT PLYWOOD CONSTRUCTION FENCE
Q01408572-P1
06/19/2026
Filed — Alteration
THE ERECTED OF AN 8-FOOT PLYWOOD CONSTRUCTION FENCE
Q01408572-S2
05/28/2026
Filed — Alteration
THE ERECTED OF AN 8-FOOT PLYWOOD CONSTRUCTION FENCE
Q01408572-I1
05/26/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/25/2026
Violation issued (ECB, open)
Construction
05/25/2026
Violation issued (ECB, open)
Construction
05/25/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/25/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/03/2024
Signed off — Alteration
HEREWITH FILED IN CONJUNCTION WITH APPLICATION NO. 440629447 FOR INSTALLATION OF PLUMBING EQUIPMENT AND FIXTURES.
Q00414296-I1
04/25/2024
Objection raised — Other
04/25/2024
Objection raised — Energy
04/25/2024
Objection raised — Structural
04/25/2024
Objection raised — Structural
04/25/2024
Objection raised — Zoning
04/17/2024
Filed — Alteration
Application filed to install (29) Q-Cells 405 watts solar panels and also apply for property tax abatement.
Q01032481-I1
04/08/2024
Special inspection requirement — Air barrier - visual inspection
04/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/08/2024
Special inspection requirement — Energy Code Compliance Inspections
04/08/2024
Special inspection requirement — Final
12/21/2023
Special inspection requirement — Energy Code Compliance Inspections
KOJO SIMPSON
12/21/2023
Special inspection requirement — HVAC and service water heating equipment
KOJO SIMPSON
12/21/2023
Special inspection requirement — Maintenance information
KOJO SIMPSON
12/21/2023
Special inspection requirement — HVAC insulation and sealing
KOJO SIMPSON
12/21/2023
Special inspection requirement — HVAC and service water heating system controls
KOJO SIMPSON
12/21/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KOJO SIMPSON
12/21/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/21/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
KOJO SIMPSON
12/08/2023
Filed — Alteration
HEREWITH FILED IN CONJUNCTION WITH APPLICATION NO. 440629447 FOR INSTALLATION OF PLUMBING EQUIPMENT AND FIXTURES.
Q00414296-P2
12/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KOJO SIMPSON
12/08/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
KOJO SIMPSON
12/08/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/08/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/08/2023
Special inspection requirement — Energy Code Compliance Inspections
KOJO SIMPSON
12/08/2023
Special inspection requirement — Maintenance information
KOJO SIMPSON
12/08/2023
Special inspection requirement — HVAC and service water heating system controls
KOJO SIMPSON
12/08/2023
Special inspection requirement — HVAC and service water heating equipment
KOJO SIMPSON
12/08/2023
Special inspection requirement — HVAC insulation and sealing
KOJO SIMPSON
11/21/2023
Signed off — Alteration
HEREWITH FILED FOR INSTALLATION OF NEW CURB-CUT IN CONJUNCTION WITH APPLICATION #440629447
Q00414286-I1
11/20/2023
Signed off — Alteration
Q00414277-I1
11/20/2023
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
10/27/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/19/2023
Objection resolved — Addressed
10/07/2023
Objection raised — Scope
10/02/2023
Filed — Alteration
HEREWITH FILED IN CONJUNCTION WITH APPLICATION NO. 440629447 FOR INSTALLATION OF PLUMBING EQUIPMENT AND FIXTURES.
Q00414296-P1
09/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KOJO SIMPSON
09/27/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
KOJO SIMPSON
09/27/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/20/2022
Permit issued — Construction Fence
Q00414277-I1-FN
11/09/2022
Permit issued — Construction Fence
Q00414277-I1-FN
10/07/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/07/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/07/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/23/2022
Violation issued (ECB, closed)
Unknown
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offGO SOLAR/GREEN NY LLC12/20/2022
DOB NOWConstruction FenceSigned-offGO SOLAR/GREEN NY LLC11/09/2022
DOB NOWCurb CutSigned-offGO SOLAR/GREEN NY LLC09/21/2022
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING07/18/2022
DOB NOWConstruction FenceSigned-offGO SOLAR/GREEN NY LLC12/17/2021
DOB NOWConstruction FenceSigned-offGO SOLAR/GREEN NY LLC08/31/2021
DOB NOWConstruction FenceSigned-offGO SOLAR/GREEN NY LLC05/19/2021
BIS—ISSUEDGO SOLAR/GREEN NY LLC08/16/2023
BIS—ISSUEDGO SOLAR/GREEN NY LLC08/23/2022
BIS—ISSUEDV.A BUILDERS CORP05/10/2022
BIS—RE-ISSUEDV.A BUILDERS CORP09/17/2021
BIS—ISSUEDGO SOLAR/GREEN NY LLC08/31/2021
2 projects · most recent 03/06/2024
General Wiring
FiledStatusContractorScope
03/06/2024CompleteJOE ELECTRICAL INC—
11/30/2023CompleteJOE ELECTRICAL INCGeneral Wiring
1 project · most recent 08/12/2026
FiledStatusContractorScope
08/12/2026——1 scope_items
1 project · most recent 04/17/2024
FiledStatusContractorScope
04/17/2024——29 panels, 11.71 kw, 503 roof_area_sqft
1 project · most recent 08/12/2026
Fence
FiledStatusContractorScope
08/12/2026——Fence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/20/2023Pass-Final Fence Non-Directive 14PassView ↗
10/27/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/07/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/04/2026Footing and Foundation—progress
08/04/2026Final—progress
08/04/2026Concrete - Cast-In-Place—special
08/04/2026Excavations - Sheeting, Shoring, and Bracing—special
04/08/2024Air barrier - visual inspection—energy_progress
04/08/2024Fire-Resistant Penetrations and Joints—special
04/08/2024Structural Stability – Alterations of existing buildings—special
04/08/2024Energy Code Compliance Inspections—progress
04/08/2024Final—progress
12/21/2023Energy Code Compliance InspectionsKOJO SIMPSONprogress
12/21/2023HVAC and service water heating equipment KOJO SIMPSONenergy_progress
12/21/2023Maintenance informationKOJO SIMPSONenergy_progress
12/21/2023HVAC insulation and sealing KOJO SIMPSONenergy_progress
12/21/2023HVAC and service water heating system controls KOJO SIMPSONenergy_progress
12/21/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/21/2023Fire-Resistant Penetrations and JointsKOJO SIMPSONspecial
12/21/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/21/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationKOJO SIMPSONspecial
12/08/2023Fire-Resistant Penetrations and JointsKOJO SIMPSONspecial
12/08/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationKOJO SIMPSONspecial
12/08/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/08/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/08/2023Energy Code Compliance InspectionsKOJO SIMPSONprogress
12/08/2023Maintenance informationKOJO SIMPSONenergy_progress
12/08/2023HVAC and service water heating system controls KOJO SIMPSONenergy_progress
Latest 25 of 36.
▾Documents — 172 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch5
08/16/2026Q01408572-S2Request digital key ↗
08/16/2026Q01408572-I1Request digital key ↗
08/16/2026Q01408572-S3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/27/2026Q00414296-I1Request digital key ↗
08/15/2026Q00414296-P1Request digital key ↗
08/15/2026Q00414296-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026Q00414286-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00414277-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION15
01/15/2026440629447Open ↗
01/13/2026440629447Open ↗
11/25/2025440629447Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION5
11/16/2023440629447Open ↗
10/21/2022440629447Open ↗
10/13/2021440629447Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/08/2025440638231Open ↗
10/17/2023440638231Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/22/2024440629447Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/31/2021440629447Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/18/2021440629447Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
05/07/2025440629447Open ↗
▸BISZONING DIAGRAM1
08/10/2021440629447Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026Q00414296-P1Open ↗
09/01/2026Q00414296-P1Open ↗
09/01/2026Q00414296-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00414286-I1Open ↗
08/27/2026Q00414277-I1Open ↗
08/27/2026Q00414296-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00414296-P1Open ↗
09/01/2026Q00414296-P1Open ↗
08/24/2026Q00414296-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/08/2021440629447Open ↗
12/14/2020440646847Open ↗
10/29/2020440638231Open ↗
▸BISAPPLICANT OWNER SIGNATURE3
01/08/2021440629447Open ↗
12/14/2020440646847Open ↗
10/29/2020440638231Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/12/2021440629447Open ↗
09/29/2021440629447Open ↗
▸Trade Schedules & Equipment5
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/29/2023440629447Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/29/2023440629447Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
07/26/2021440629447Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/17/2024440629447Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/17/2024440629447Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
09/16/2022440638231Open ↗
01/08/2021440629447Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/18/2021440629447Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00414296-I1Open ↗
08/15/2026Q00414296-P1Open ↗
08/13/2026Q01032481-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/06/2021440629447Open ↗
01/08/2021440629447Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
12/02/2023440629447Open ↗
11/09/2023440629447Open ↗
08/10/2021440629447Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/08/2021440629447Open ↗
10/29/2020440638231Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/29/2023440629447Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/29/2023440629447Open ↗
▸BISFENESTRATION AREAS1
11/29/2023440629447Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/31/2021440629447Open ↗
▸BISNYCECC ANALYSIS1
08/10/2021440629447Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/29/2023440629447Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/29/2023440629447Open ↗
▸BISLIGHTING CONTROLS1
11/29/2023440629447Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/07/2025440629447Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/29/2021440629447Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00414296-I1Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY8
11/09/2023440629447Open ↗
08/31/2021440629447Open ↗
07/27/2021440629447Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSOIL REPORT3
08/27/2026Q00414296-I1Open ↗
08/15/2026Q00414296-P1Open ↗
08/13/2026Q00414296-P2Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/29/2023440629447Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
12/15/2023440629447Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/31/2021440629447Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/29/2023440629447Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/29/2023440629447Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/29/2023440629447Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/29/2023440629447Open ↗
▸BISMASONRY1
11/29/2023440629447Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/29/2023440629447Open ↗
▸BISSOIL REPORT1
01/08/2021440629447Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
05/07/2025440629447Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/08/2021440629447Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00414296-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/16/2026Q01408572-S3Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE7
11/25/2025440629447Open ↗
10/28/2025440629447Open ↗
10/24/2025440629447Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER1
10/21/2022440629447Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/06/2021440629447Open ↗
01/08/2021440629447Open ↗
12/14/2020440646847Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION7
11/13/2025440629447Open ↗
09/16/2022440638231Open ↗
08/10/2021440629447Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
01/08/2021440629447Open ↗
12/14/2020440646847Open ↗
10/29/2020440638231Open ↗
▸BISBOROUGH INTAKE FORM1
11/16/2023440629447Open ↗
▸Other Documents9
▸BISSUSTAINABLE ROOF ZONE FORM1
01/08/2021440629447Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/16/2022440638231Open ↗
▸BISMAINTENANCE INFORMATION1
11/29/2023440629447Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/16/2022440638231Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
11/29/2023440629447Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/19/2021440646847Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
11/29/2023440629447Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
12/02/2023440629447Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
11/29/2023440629447Open ↗