Two family converted from one family
261 CLIFTON PLACE
BROOKLYN · BIN 3049912
💬 Discuss this project
1899Year Built
3Stories
B3Building Class
R6BZoning
3,000 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: NOSTRAND TILDEN LLC · 1,667 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 32p · 3 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar2p · 1 filing · 19 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MY BK MANAGEMENT2107/08/2026
QUALITY G BUILDERS503/22/2026
QUAITY G BUILDERS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/24/2020$999K—Private party → Private party$333/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L & C ASSOCIATES1111/28/2022
FL&M ENGINEERING DESIGN &INSPECTION104/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES1103/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QUALITY G BUILDERS INCGeneral Contractor807/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor603/21/2026
PETER MICELI PLUMBINGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM AND CO CONSULTING LLC8065511/28/2022
LAM &CO CONSULTING LLC DB2159409/15/2022
YAN ENGINEERING PLLC7851207/09/2021
Building Lifecycle
All (70)Filed (12)Permit Issued (8)Signed Off (5)Violation (15)Special Inspection (30)
11/24/2025
Violation issued (HPD, closed)
I
04/13/2023
Signed off — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477018-I1
03/21/2023
Signed off — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477004-S1
11/28/2022
Filed — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477018-P3
11/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
11/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
11/04/2022
Permit issued — Plumbing
B00477018-I1-PL
10/17/2022
Signed off — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477004-I1
10/14/2022
Signed off — Alteration
PROVIDE NEW MECHANICAL SYSTEM THROUGHOUT 2-FAMILY FOUR-STORY BUILDING, IN CONJUNCTION WITH ALT-2 APPLICATION# B00477004
B00551823-I1
09/20/2022
Special inspection requirement — Heating Systems
CHI WAI CHUNG
09/20/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
09/20/2022
Special inspection requirement — Mechanical Systems
CHI WAI CHUNG
09/20/2022
Special inspection requirement — Final
JAN PEREZ
09/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
09/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
09/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
09/15/2022
Filed — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477018-P2
09/15/2022
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477004-P3
09/15/2022
Filed — Alteration
PROVIDE NEW MECHANICAL SYSTEM THROUGHOUT 2-FAMILY FOUR-STORY BUILDING, IN CONJUNCTION WITH ALT-2 APPLICATION# B00477004
B00551823-P1
09/13/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
09/13/2022
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
09/13/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
09/13/2022
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
09/13/2022
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
09/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONNY LAM
09/13/2022
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
09/13/2022
Special inspection requirement — Fenestration air leakage
RONNY LAM
09/13/2022
Special inspection requirement — Interior lighting power
RONNY LAM
09/13/2022
Special inspection requirement — Insulation placement and R values
RONNY LAM
09/13/2022
Special inspection requirement — Air barrier - visual inspection
RONNY LAM
09/13/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
RONNY LAM
09/13/2022
Special inspection requirement — Fenestration areas
RONNY LAM
09/13/2022
Special inspection requirement — Air barrier — testing
RONNY LAM
09/13/2022
Special inspection requirement — Heating Systems
CHI WAI CHUNG
09/13/2022
Special inspection requirement — Mechanical Systems
CHI WAI CHUNG
09/13/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
09/13/2022
Special inspection requirement — Final
JAN PEREZ
09/09/2022
Violation issued (ECB, closed)
Construction
05/23/2022
Violation issued (ECB, closed)
Construction
03/16/2022
Violation issued (HPD, closed)
I
03/09/2022
Permit issued — General Construction
B00477004-I1-GC
12/15/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00502450-I1
09/16/2021
Violation issued (ECB, closed)
Construction
08/12/2021
Permit issued — Mechanical Systems
B00551823-I1-MS
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/26/2021
Filed — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477018-P1
07/23/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477004-P1
07/09/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477004-P2
07/09/2021
Violation issued (ECB, closed)
Construction
07/06/2021
Filed — Alteration
PROVIDE NEW MECHANICAL SYSTEM THROUGHOUT 2-FAMILY FOUR-STORY BUILDING, IN CONJUNCTION WITH ALT-2 APPLICATION# B00477004
B00551823-I1
06/11/2021
Violation issued (ECB, closed)
Construction
06/07/2021
Permit issued — Structural
B00477004-S1-ST
05/29/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00477004-S1
05/11/2021
Violation issued (ECB, closed)
Construction
04/27/2021
Permit issued — Plumbing
B00477018-I1-PL
04/13/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00502450-I1
04/13/2021
Permit issued — Sidewalk Shed
B00502450-I1-SH
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING11/04/2022
DOB NOWGeneral ConstructionSigned-offQUALITY G BUILDERS INC03/09/2022
DOB NOWMechanical SystemsSigned-offQUALITY G BUILDERS INC08/12/2021
DOB NOWStructuralSigned-offQUALITY G BUILDERS INC06/07/2021
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING04/27/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES04/13/2021
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES04/13/2021
DOB NOWGeneral ConstructionSigned-offQUALITY G BUILDERS INC03/17/2021
2 projects · most recent 04/08/2021
General Wiring
FiledStatusContractorScope
04/08/2021CompleteV. VASS ELECTRIC CORP—
03/31/2021CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
11/28/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
11/28/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
11/28/2022HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
11/28/2022Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
11/28/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
09/20/2022Heating SystemsCHI WAI CHUNGspecial
09/20/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
09/20/2022Mechanical SystemsCHI WAI CHUNGspecial
09/20/2022FinalJAN PEREZprogress
09/20/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
09/20/2022HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
09/20/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
09/13/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
09/13/2022Energy Code Compliance InspectionsRONNY LAMprogress
09/13/2022HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
09/13/2022HVAC-R and service water heating system controlsRONNY LAMenergy_progress
09/13/2022HVAC-R and service water heating equipmentRONNY LAMenergy_progress
09/13/2022Fire-Resistant Penetrations and JointsRONNY LAMspecial
09/13/2022Energy Code Compliance InspectionsRONNY LAMprogress
09/13/2022Fenestration air leakageRONNY LAMenergy_progress
09/13/2022Interior lighting powerRONNY LAMenergy_progress
09/13/2022Insulation placement and R valuesRONNY LAMenergy_progress
09/13/2022Air barrier - visual inspectionRONNY LAMenergy_progress
09/13/2022Fenestration and door U-factor and product ratingsRONNY LAMenergy_progress
09/13/2022Fenestration areasRONNY LAMenergy_progress
Latest 25 of 55.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch5
09/01/2026B00502450-I1Request digital key ↗
09/01/2026B00477004-P2Request digital key ↗
09/01/2026B00477004-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/01/2026B00477018-I1Request digital key ↗
09/01/2026B00477018-P3Request digital key ↗
09/01/2026B00477018-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00477004-P3Request digital key ↗
09/01/2026B00477004-P1Request digital key ↗
09/01/2026B00477004-I1Request digital key ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature40
09/02/2026B00477004-P3Open ↗
09/02/2026B00477004-P3Open ↗
09/02/2026B00477004-P3Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026B00477018-P1Open ↗
09/01/2026B00477018-P3Open ↗
09/01/2026B00477018-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026B00477004-P3Open ↗
09/01/2026B00551823-I1Open ↗
09/01/2026B00551823-I1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026B00477018-P1Open ↗
09/01/2026B00477018-I1Open ↗
09/01/2026B00477018-P3Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00477018-I1Open ↗
08/13/2026B00551823-I1Open ↗
08/13/2026B00477004-I1Open ↗