| Owner | Filings | Most Recent |
|---|---|---|
| DOM | 60 | 07/08/2026 |
| SWINERTON BUILDERS | 3 | 07/08/2026 |
| DON INC | 2 | 03/22/2026 |
| OWNER OF 261 DRIGGS AVE | 2 | 03/22/2026 |
| DOM INC AKA POLISH NATIONAL HOME | 1 | 03/21/2026 |
| DOM INC D B A NATL HOME | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| JERZY LESNIAK RA | 2 | 01/30/2025 |
| MSM ENGINEERING SERVICES, PLLC | 2 | 08/14/2024 |
| WAKE DESIGN ARCHITECTURE PLLC | 4 | 09/05/2023 |
| THOMAS VELTRE P.E., P.C. | 3 | 07/22/2023 |
| URBAN INTEGRATIONS | 1 | 03/29/2023 |
| MADSEN CONSULTING ENGINEERING, PLLC | 2 | 02/10/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| RICHARD WAINER ARCHITECT, PLLC | 16 | 03/21/2026 |
| BIG ORANGE EXPEDITING | 2 | 03/21/2026 |
| RAMOS NY CONSULTING | 2 | 03/21/2026 |
| SWA ARCHITECTURE | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SWINERTON BUILDERS | General Contractor | 10 | 07/08/2026 |
| PHOENIX SUTTON STR INC | General Contractor | 3 | 07/08/2026 |
| MER ELECTRIC, INC | Electrical | 2 | 03/22/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 1 | 07/08/2026 |
| M&T PLBG AND HTG CO., INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| THOMAS VELTRE, P.E, P.C. | 459 | 3 | 07/22/2023 |
| MADSEN ENGINEERING | 5423 | 2 | 02/10/2023 |
| GZA GEOENVIRONMENTAL OF N | 1179 | 1 | 01/30/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Signed-off | PHOENIX SUTTON STR INC | 02/03/2025 |
| DOB NOW | General Construction | Signed-off | PHOENIX SUTTON STR INC | 12/03/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | PHOENIX SUTTON STR INC | 08/12/2024 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 06/09/2023 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 05/18/2023 |
| DOB NOW | Mechanical Systems | Signed-off | SWINERTON BUILDERS | 04/17/2023 |
| DOB NOW | Plumbing | Signed-off | ALLSTATE SPRINKLER LLC | 03/30/2023 |
| DOB NOW | Construction Fence | Signed-off | SWINERTON BUILDERS | 03/29/2023 |
| DOB NOW | Plumbing | Signed-off | M&T PLBG AND HTG CO., INC | 03/29/2023 |
| DOB NOW | Foundation | Signed-off | SWINERTON BUILDERS | 03/23/2023 |
| DOB NOW | Structural | Signed-off | SWINERTON BUILDERS | 03/17/2023 |
| DOB NOW | General Construction | Signed-off | SWINERTON BUILDERS | 02/24/2023 |
| BIS | — | ISSUED | SWINERTON BUILDERS | 05/17/2023 |
| BIS | — | ISSUED | SWINERTON BUILDERS | 02/07/2023 |
| BIS | — | ISSUED | SKYVIEW BUILDERS LLC | 04/25/2017 |
| BIS | PL | ISSUED | PRACTICAL PLBG & HTG INC | 07/15/2015 |
| BIS | PL | ISSUED | A.M.N. CORPORATION | 10/23/2014 |
| BIS | BL | ISSUED | A.M.N. CORPORATION | 10/23/2014 |
| BIS | PL | ISSUED | PRACTICAL PLBG & HTG INC | 06/17/2013 |
| BIS | OT | ISSUED | VEBICON CONSTRUCTION CORP | 03/23/2011 |
| BIS | PL | ISSUED | TT MECHANICAL CORP | 12/04/2009 |
| BIS | FP | ISSUED | ALLIED FIRE CONTROL | 01/05/2006 |
| BIS | OT | ISSUED | ERIN ISLE CONSTRUCTION | 11/17/2005 |
| BIS | MH | ISSUED | INTERGRATE COMFORT SYSTEMS INC | 04/02/2001 |
| BIS | SP | ISSUED | DEPENDABLE SPRINKLER CO, INC. | 07/12/1994 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/02/2025 | Permit Issued | MER ELECTRIC, INC | General Wiring |
| 08/09/2024 | Complete | RICHARD NEU | — |
| 01/10/2023 | Complete | MER ELECTRIC, INC | General Wiring |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/15/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/07/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/05/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/17/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 11/27/2024 | Final | JERZY LESNIAK | progress |
| 11/12/2024 | Final | JERZY LESNIAK | progress |
| 07/27/2023 | Sprinkler Systems | Thomas Veltre | special |
| 07/21/2023 | Sprinkler Systems | Thomas Veltre | special |
| 04/13/2023 | Exterior Insulation and Finish Systems (EIFS) | Gregory Perotto | special |
| 02/24/2023 | Fenestration areas | Gregory Perotto | energy_progress |
| 02/24/2023 | Fire-Resistance Rated Construction | Gregory Perotto | progress |
| 02/24/2023 | Final | Gregory Perotto | progress |
| 02/24/2023 | Air barrier - visual inspection | Gregory Perotto | energy_progress |
| 02/24/2023 | Insulation placement and R values | Gregory Perotto | energy_progress |
| 02/22/2023 | Fire-Resistant Penetrations and Joints | Thomas Veltre | special |
| 12/21/2022 | Subgrade Inspections | Muktar Khatari | special |
| 12/21/2022 | Structural Steel - Welding | Erik Madsen | special |
| 12/21/2022 | Construction Operations Influencing Adjacent Structures | Erik Madsen | special |
| 12/21/2022 | Structural Stability – Alterations of existing buildings | Erik Madsen | special |
| 12/21/2022 | Concrete - Cast-In-Place | Erik Madsen | special |
| 12/21/2022 | Subsurface Investigations (Borings/Test Pits) | Muktar Khatari | special |
| 12/21/2022 | Post-installed Anchors | Erik Madsen | special |
| 12/21/2022 | Structural Cold-Formed Steel | Erik Madsen | special |
| 12/21/2022 | Structural Steel - Details | Erik Madsen | special |
| 12/21/2022 | Concrete - Cast-In-Place | Erik Madsen | special |
| 12/21/2022 | Post-installed Anchors | Erik Madsen | special |
| 12/21/2022 | Structural Steel - High Strength Bolting | Erik Madsen | special |
| 12/13/2022 | Mechanical Systems | Thomas Veltre | special |
| 12/13/2022 | Final | Thomas Veltre | progress |