← Back
BuildNYC
Public elementary, junior or senior high
P.S. 35 Franz Siegel
261 EAST 163RD STREET · BIN 2101573
💬 Discuss this project
1903Year Built
4Stories
W1Building Class
R7-1Zoning
176,400 sfGross Floor Area
2Units
LL97 Covered7 Active Violations 0 unresolved · 7 paperwork only 3 likely answered ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 87,000 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
EquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofP.S. 35 Franz Siegel2 filings · 16 docs
Floor 4P.S. 35 Franz Siegel1 filing · 16 docs
Floor 3P.S. 35 Franz Siegel1 filing · 16 docs
Floor 2P.S. 35 Franz Siegel1 filing · 16 docs
Floor 1P.S. 35 Franz Siegel1 filing · 16 docs
CellarP.S. 35 Franz Siegel1 filing · 16 docs
Filed — no permit issuedP.S. 35 Franz Siegel13p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority3010/13/2026
NYC Department of Education203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
360 Engineering408/27/2026
MP Engineers310/17/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Atomic ElectricElectrical103/21/2026
Colony Electric CoElectrical103/21/2026
Selectric Electrical Cont Co IElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hudson Peaks Consulting8381310/17/2025
Building Lifecycle
All (84)Filed (7)Violation (54)Objection (10)Special Inspection (13)
10/12/2026
Objection resolved — Resolved
09/17/2026
Objection resolved — Addressed
09/17/2026
Objection resolved — Addressed
09/17/2026
Objection resolved — Resolved
09/03/2026
Objection raised — Other
09/02/2026
Objection raised — Other
08/31/2026
Objection raised — Other
08/31/2026
Objection raised — Other
08/27/2026
Filed — Alteration
Chute installation for debris removals, Filed in conjunction with job#X01302013-I1.
X01451541-I1
08/27/2026
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD FOR WORK LOCATION ACCESS. FILED IN CONJUNCTION WITH JOB#X01302013-I1.
X01422712-I1
08/27/2026
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK. FILED IN CONJUCTION WITH JOB#X01302013-I1.
X01422705-I1
08/27/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK. FILED IN CONJUNCTION WITH JOB#X01302013-I1.
X01422708-I1
06/26/2026
Special inspection requirement — Post-installed Anchors
11/25/2025
Objection resolved — Addressed
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/2025
Objection raised — Other
10/17/2025
Filed — Alteration
Roof drain replacement
X01302013-S1
10/16/2025
Filed — Alteration
Roof drain replacement
X01302013-S2
10/15/2025
Filed — Alteration
Roof drain replacement
X01302013-I1
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
10/14/2025
Special inspection requirement — Masonry
GIORGI KHARDZEISHVILI
10/14/2025
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
10/14/2025
Special inspection requirement — Concrete - Cast-In-Place
GIORGI KHARDZEISHVILI
10/14/2025
Special inspection requirement — Structural Steel - Details
GIORGI KHARDZEISHVILI
10/14/2025
Special inspection requirement — Structural Steel - High Strength Bolting
GIORGI KHARDZEISHVILI
10/14/2025
Special inspection requirement — Structural Steel - Welding
GIORGI KHARDZEISHVILI
10/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
GIORGI KHARDZEISHVILI
10/14/2025
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
10/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIORGI KHARDZEISHVILI
10/13/2025
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
07/05/2025
Violation issued (ECB, open)
Construction
07/19/2024
Violation issued (ECB, closed)
Construction
09/08/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2023
Violation issued (ECB, closed)
Construction
03/16/2023
Violation issued (ECB, closed)
Construction
03/16/2023
Violation issued (ECB, closed)
Construction
03/16/2023
Violation issued (ECB, closed)
Construction
03/16/2023
Violation issued (ECB, closed)
Construction
09/01/2020
Violation issued (ECB, open)
Boilers
09/01/2020
Violation issued (ECB, open)
Boilers
04/14/2020
Violation issued (ECB, closed)
Construction
03/14/2019
Violation issued (ECB, closed)
Construction
05/02/2016
Violation issued (ECB, closed)
Construction
04/25/2014
Violation issued (ECB, closed)
Construction
04/19/2013
Violation issued (ECB, closed)
Construction
04/19/2013
Violation issued (ECB, closed)
Construction
04/19/2013
Violation issued (ECB, closed)
Construction
06/29/2012
Violation issued (ECB, closed)
Construction
06/29/2012
Violation issued (ECB, closed)
Construction
06/29/2012
Violation issued (ECB, closed)
Construction
09/01/2011
Violation issued (ECB, closed)
Construction
09/01/2011
Violation issued (ECB, closed)
Construction
09/01/2011
Violation issued (ECB, closed)
Construction
06/25/2010
Violation issued (ECB, closed)
Construction
06/25/2010
Violation issued (ECB, closed)
Construction
06/25/2010
Violation issued (ECB, closed)
Construction
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDVarsity Plumbing and Heating03/02/2017
BISOTISSUEDCivil Contracting08/17/2016
BISPLISSUEDVarsity Plumbing and Heating03/08/2016
BISOTISSUEDNoble Electrical Contracting Co02/18/2016
BISOTISSUEDCivil Contracting09/08/2015
BISOTISSUEDCivil Contracting03/27/2015
BISEQISSUEDAdvanced Construction Equipment03/27/2015
BISPLISSUEDVarsity Plumbing and Heating03/27/2015
BISEQISSUEDAdvanced Construction Equipment03/18/2015
BISEQISSUEDCivil Contracting02/27/2015
BISOTISSUEDNoble Electrical Contracting Co02/10/2015
BISOTISSUEDVenus Electrical Constractors'06/13/2003
BISEQRE-ISSUEDAtlantic Heydt11/17/1998
BISEQISSUEDAtlantic Scaffolding02/13/1998
BISEQISSUEDShroid Construction02/04/1998
BISEQISSUEDShroid Constructon02/04/1998
BISOTISSUEDShroid Construction Co01/14/1998
BISBLISSUEDAnthony Patane11/26/1997
BISOTISSUEDShroid Construction Co09/12/1997
BISPLISSUEDJodinan Plumbing and Heating09/12/1997
BISEQISSUEDAtlantic Scaffolding08/26/1997
1 project · most recent 10/17/2025
Storm
FiledStatusContractorScope
10/17/2025——Storm
5 projects · most recent 04/19/2026
General Wiring
FiledStatusContractorScope
04/19/2026Permit IssuedCore Electric MEP IndsGeneral Wiring
10/09/2025CompleteAnco Electl Contctng—
12/10/2021CompleteCharan Electrical Enterp's—
08/05/2020CompleteCharan Electrical Enterp's—
01/14/2020CompleteCharan Electrical Enterp's—
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/26/2026Post-installed Anchors—special
10/14/2025Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
10/14/2025MasonryGIORGI KHARDZEISHVILIspecial
10/14/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
10/14/2025Concrete - Cast-In-PlaceGIORGI KHARDZEISHVILIspecial
10/14/2025Structural Steel - DetailsGIORGI KHARDZEISHVILIspecial
10/14/2025Structural Steel - High Strength BoltingGIORGI KHARDZEISHVILIspecial
10/14/2025Structural Steel - WeldingGIORGI KHARDZEISHVILIspecial
10/14/2025Fire-Resistance Rated ConstructionGIORGI KHARDZEISHVILIprogress
10/14/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
10/14/2025Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
10/13/2025Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
10/13/2025FinalGIORGI KHARDZEISHVILIprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 35 Franz SiegelEducationEntire building
Project X01422705 Alteration · Approved · 08/27/2026
Project X01422708 Alteration · Approved · 08/27/2026
Project X01451541 Alteration · Approved · 08/27/2026
Project X01302013 Alteration · Approved · 10/15/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
10/13/2026X01422712-I1Request digital key ↗
10/04/2026X01422705-I1Request digital key ↗
10/04/2026X01422708-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature7
10/13/2026X01422712-I1Open ↗
10/04/2026X01422705-I1Open ↗
10/04/2026X01422708-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X01302013-I1Open ↗
08/26/2026X01302013-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026X01302013-I1Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
10/13/2026X01422712-I1Open ↗
10/04/2026X01422705-I1Open ↗
10/04/2026X01422708-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
10/13/2026X01422712-I1Open ↗
10/04/2026X01422705-I1Open ↗
10/04/2026X01422708-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents8
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal7
10/13/2026X01422712-I1Open ↗
10/04/2026X01422705-I1Open ↗
10/04/2026X01422708-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026X01302013-I1Open ↗