← Back
BuildNYC
Elevator apt, semi-fireproof without stores
261 EAST 202ND STREET
BRONX · BIN 2017263
💬 Discuss this project
2021Year Built
11Stories
D1Building Class
R8Zoning
136,328 sfGross Floor Area
163Units
LL97 CoveredRent Stabilized57 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: CHV Bedford Park Housing Developemtn Fun D · 20,200 sf lot · 6.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsCamba Housing Ventures, INC.5 filings
RoofCamba Housing Ventures, INC.1 filing
Floor 6Heavy duty sidewalk shed and pipe scaffold installation1 filing
Floor 5Heavy duty sidewalk shed and pipe scaffold installation1 filing
Floor 4Heavy duty sidewalk shed and pipe scaffold installation1 filing
Floor 3Heavy duty sidewalk shed and pipe scaffold installation1 filing
Floor 2Heavy duty sidewalk shed and pipe scaffold installation1 filing
Floor 1Heavy duty sidewalk shed and pipe scaffold installation3 filings
Site & exteriorCurb cut at driveway5 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Camba Housing Ventures2503/21/2026
Walnut 2021003/21/2026
CHV Bedford Park703/21/2026
CHV Bedford Park Housing Developemtn Fun D103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/30/2017$800K—Private party → WALNUT 202 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ettinger Engineering Associates1909/29/2025
Paul G. Jones, P.E108/07/2024
Tohfaz Uddin PE907/19/2023
Ashraf108/22/2021
McNamara Salvia208/03/2021
Kevin Louis Pellon102/06/2020
AKRF101/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates2203/21/2026
Platinum Services NY1003/21/2026
Green Studio203/21/2026
KD Designs103/21/2026
Expedite Dem203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold3607/08/2026
Safety Fire SprinklerFire Protection807/08/2026
Bolivar BuildersScaffold707/08/2026
Consolidated ScaffoldingScaffold603/21/2026
Bolivar BuildersGeneral Contractor507/08/2026
Demar MechanicalPlumbing407/08/2026
DC Building ServicesFire Protection307/08/2026
K.N.C. ElectricElectrical203/22/2026
Adrias PlumbingPlumbing207/08/2026
Coast Building ManagementScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ettinger Commissioning73841709/29/2025
20/20 Inspections1471504/08/2024
AP Professional Engineering5974307/19/2023
Building Lifecycle
09/22/2026
1) the cat-1 tag is expired (8.11.1.6). 2) the elevator rail are rusty (could effect the operation of the car safety)(8.11.2.1.3). 3) the pit is…
ECB violation · open
08/20/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
08/06/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT COMPACTOR CLOSET, 11th STORY
HPD violation · open
07/22/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 4th…
HPD violation · open
07/22/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM…
HPD violation · open
238 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offDC Building Services01/28/2025
DOB NOWStandpipeSigned-offDC Building Services01/27/2025
DOB NOWSprinklersSigned-offDC Building Services01/27/2025
DOB NOWCurb CutSigned-offBolivar Builders01/24/2025
DOB NOWStandpipeSigned-offSafety Fire Sprinkler11/06/2024
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding08/08/2024
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding08/08/2024
DOB NOWSprinklersSigned-offSafety Fire Sprinkler12/28/2023
DOB NOWStandpipeSigned-offSafety Fire Sprinkler12/28/2023
DOB NOWStructuralSigned-offBolivar Builders12/08/2023
DOB NOWPlumbingSigned-offDemar Mechanical12/05/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/06/2023
DOB NOWConstruction FenceSigned-offPlatinum Services NY08/24/2023
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY08/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY08/21/2023
DOB NOWStructuralSigned-offBolivar Builders02/28/2023
DOB NOWConstruction FenceSigned-offBolivar Builders12/08/2022
DOB NOWPlumbingSigned-offDemar Mechanical12/06/2022
DOB NOWMechanical SystemsSigned-offBolivar Builders12/02/2022
DOB NOWBoiler EquipmentSigned-offAdrias Plumbing11/28/2022
DOB NOWBoiler EquipmentSigned-offAdrias Plumbing11/17/2022
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY11/17/2022
DOB NOWStandpipeSigned-offSafety Fire Sprinkler10/21/2022
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY08/24/2022
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY08/24/2022
DOB NOWConstruction FenceSigned-offPlatinum Services NY08/24/2022
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY08/24/2022
DOB NOWSprinklersSigned-offSafety Fire Sprinkler04/25/2022
DOB NOWStandpipeSigned-offSafety Fire Sprinkler04/25/2022
DOB NOWConstruction FenceSigned-offBolivar Builders03/02/2022
DOB NOWPlumbingSigned-offDemar Mechanical12/08/2021
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY09/20/2021
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY09/01/2021
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY09/01/2021
DOB NOWConstruction FenceSigned-offPlatinum Services NY09/01/2021
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY08/23/2021
DOB NOWStandpipeSigned-offSafety Fire Sprinkler07/29/2021
DOB NOWPlumbingSigned-offDemar Mechanical04/19/2021
DOB NOWConstruction FenceSigned-offCoast Building Management03/23/2021
DOB NOWConstruction FenceSigned-offBolivar Builders12/23/2020
+ 18 more permits on file
10 projects · most recent 01/06/2025
General Wiring
FiledStatusContractorScope
01/06/2025CompleteCounty Electrical Contractor IGeneral Wiring
11/12/2023CancelledCreative Cablng & Bertram—
11/12/2023CancelledBertram Electric ContngGeneral Wiring
12/28/2022CompleteStar Electrical Contractors—
09/20/2022CompleteCounty Electrical Contractor IGeneral Wiring
08/31/2022CompleteIlluminous ElectricGeneral Wiring
12/29/2021CompleteCounty Electrical Contractor I—
10/04/2021CompleteIlluminous Electric—
05/18/2021CompleteK.N.C. Electric—
02/08/2021CompleteK.N.C. Electric—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/18/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/03/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
01/30/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
05/31/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/17/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/17/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/08/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
10/03/2025Standpipe SystemsWaldir Alvarezspecial
10/03/2025Sprinkler SystemsWaldir Alvarezspecial
09/25/2025Standpipe SystemsWaldir Alvarezspecial
09/25/2025Sprinkler SystemsWaldir Alvarezspecial
05/02/2025Mechanical SystemsWaldir Alvarezspecial
05/02/2025FinalWaldir Alvarezprogress
05/02/2025Heating SystemsWaldir Alvarezspecial
04/04/2025HVAC insulation and sealing Waldir Alvarezenergy_progress
04/04/2025Electrical energy consumptionWaldir Alvarezenergy_progress
04/04/2025HVAC and service water heating equipment Waldir Alvarezenergy_progress
04/04/2025Maintenance informationWaldir Alvarezenergy_progress
04/04/2025Heating SystemsWaldir Alvarezspecial
04/04/2025Mechanical SystemsWaldir Alvarezspecial
04/04/2025FinalWaldir Alvarezprogress
04/04/2025Electrical motorsWaldir Alvarezenergy_progress
04/04/2025HVAC and service water heating system controls Waldir Alvarezenergy_progress
04/04/2025Shutoff dampersWaldir Alvarezenergy_progress
11/04/2024Mechanical SystemsWaldir Alvarezspecial
11/04/2024Electrical motorsWaldir Alvarezenergy_progress
11/04/2024Electrical energy consumptionWaldir Alvarezenergy_progress
11/04/2024HVAC and service water heating system controls Waldir Alvarezenergy_progress
11/04/2024Shutoff dampersWaldir Alvarezenergy_progress
11/04/2024HVAC insulation and sealing Waldir Alvarezenergy_progress
11/04/2024Maintenance informationWaldir Alvarezenergy_progress
11/04/2024FinalWaldir Alvarezprogress
Latest 25 of 102.
368 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account