← Back
Two stories - detached, small or mid-size
261 HECKER STREET
STATEN ISLAND · Tottenville-Charleston · BIN 5089014
💬 Discuss this project
1901Year Built
2Stories
A1Building Class
R3AZoning
1,160 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,095 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC311/08/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KCM PLUMBING & HEATING COPlumbing207/08/2026
Building Lifecycle
All (17)Filed (3)Permit Issued (2)Signed Off (1)Inspection (3)Special Inspection (8)
12/04/2024
Signed off — Alteration
CONVERSION FROM OIL TO GAS WITH INSTALLATION OF A NEW BOILER & HOT WATER STORAGE TANK IN THE CELLAR SPACE.
S00767028-I1
03/02/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/23/2023
Permit issued — Plumbing
S00767028-I1-PL
11/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2022
Filed — Alteration
CONVERSION FROM OIL TO GAS WITH INSTALLATION OF A NEW BOILER & HOT WATER STORAGE TANK IN THE CELLAR SPACE.
S00767028-P2
09/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
09/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
09/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
09/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
08/26/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2022
Permit issued — Plumbing
S00767028-I1-PL
07/28/2022
Filed — Alteration
CONVERSION FROM OIL TO GAS WITH INSTALLATION OF A NEW BOILER & HOT WATER STORAGE TANK IN THE CELLAR SPACE.
S00767028-P1
07/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
07/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
07/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
07/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
07/14/2022
Filed — Alteration
CONVERSION FROM OIL TO GAS WITH INSTALLATION OF A NEW BOILER & HOT WATER STORAGE TANK IN THE CELLAR SPACE.
S00767028-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO02/23/2023
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO07/29/2022
1 project · most recent 07/07/2022
FiledStatusContractorScope
07/07/2022CompleteS. J. ELECTRIC INC.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/02/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/08/2022HVAC-R and service water heating equipmentSteven Savinoenergy_progress
09/08/2022Energy Code Compliance InspectionsSteven Savinoprogress
09/08/2022HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
09/08/2022HVAC-R and service water heating system controlsSteven Savinoenergy_progress
07/22/2022Energy Code Compliance InspectionsSteven Savinoprogress
07/22/2022HVAC-R and service water heating system controlsSteven Savinoenergy_progress
07/22/2022HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
07/22/2022HVAC-R and service water heating equipmentSteven Savinoenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026S00767028-I1Request digital key ↗
08/24/2026S00767028-P2Request digital key ↗
08/24/2026S00767028-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026S00767028-P1Open ↗
09/02/2026S00767028-P1Open ↗
08/25/2026S00767028-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026S00767028-I1Open ↗
08/24/2026S00767028-P2Open ↗
08/24/2026S00767028-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00767028-I1Open ↗