← Back
BuildNYC
Hospital, sanitarium, mental institution
NYC Health + Hospitals/South Brooklyn Health
2619 OCEAN PARKWAY · BIN 3425771
💬 Discuss this project
1931Year Built
14Stories
I1Building Class
R4Zoning
1,085,103 sfGross Floor Area
2Units
LL97 Covered15 Active Violations 8 unresolved · 7 paperwork only ▸FDNY Report ↗
Hospital, sanitarium, mental institution · 455,333 sf lot · 2.38 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5H+H Coney Island Hospital17p · 1 filing · 12 docs
Floor 4
Floor 3New York City Health & Hospitals1 filing · 11 docs
Floor 25p · 1 filing · 3 docs
Floor 1H+H Coney Island Hospital2p · 7 filings · 16 docs
CellarH+H Coney Island Hospital7p · 1 filing · 9 docs
Site & exteriorH+H Coney Island Hospital, N<c Health Hospital Cone< Islan H10p · 4 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Coney Island Hospital6807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Douglas P. Gonzalez103/10/2026
Moody Nolan403/05/2026
Insight Civil Engineering811/04/2024
BR+A Consulting Engineers401/05/2023
JMV Architect109/22/2022
Afridi Associates205/24/2019
Donald Van Gerve PE108/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants1803/21/2026
Dennis Kim603/21/2026
A1 Expediting Service403/21/2026
Municipal Building Consultants103/21/2026
JMV Assosiates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
United Hoisting & ScaffScaffold1607/08/2026
Turner McKissack, A JointGeneral Contractor907/08/2026
Turner McKissack, A JointScaffold907/08/2026
Joe Cina & Sons ContractingGeneral Contractor503/22/2026
Primiano Corp DbaElectrical503/21/2026
Multi-Phase Electrical ServicesGeneral Contractor203/22/2026
Primiano Corp DbaElectrical103/22/2026
A.S.R. Electrical ContractingElectrical103/22/2026
Maccarone PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589401/05/2023
Building Lifecycle
All (163)Filed (21)Permit Issued (28)Signed Off (13)Violation (60)Inspection (6)Objection (12)Special Inspection (23)
03/10/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-S4
03/09/2026
Special inspection requirement — Designated Seismic System
03/05/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-S3
02/26/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-S2
02/13/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-S1
02/02/2026
Special inspection requirement — Post-installed Anchors
02/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/02/2026
Special inspection requirement — Structural Steel - Welding
02/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/02/2026
Special inspection requirement — Structural Steel - Details
02/02/2026
Special inspection requirement — Preliminary
01/28/2026
Filed — Alteration
STRUCTURAL FILING FOR ADDITION OF MODULAR CEILING SYSTEM SUPPORT & MEDICAL EQUIP SUPPORT ON FL 3 CEILING AS SHOWN HERWITH. NO CHANGES TO EGRESS, OCCIPANCY OR USE
B01297605-I1
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/14/2025
Signed off — Alteration
B01134189-I1
11/14/2025
Signed off — Alteration
B00466404-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2025
Signed off — Alteration
B00472582-I1
10/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/10/2025
Signed off — Alteration
B00472625-I1
10/10/2025
Signed off — Alteration
B00472630-I1
10/03/2025
Signed off — Alteration
B00070597-I1
10/03/2025
Special inspection requirement — Sprinkler Systems
10/03/2025
Special inspection requirement — Final
10/02/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/19/2025
Signed off — Alteration
B00472530-I1
08/18/2025
Signed off — Alteration
B00472565-I1
08/18/2025
Signed off — Alteration
B00472637-I1
07/31/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/22/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/04/2024
Permit issued — Plumbing
B01134189-I1-PL
11/04/2024
Filed — Alteration
B01134189-I1
10/31/2024
Permit issued — Construction Fence
B00070597-I1-FN
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMaccarone Plumbing12/04/2024
DOB NOWConstruction FenceSigned-offTurner McKissack, A Joint10/31/2024
DOB NOWConstruction FenceSigned-offTurner McKissack, A Joint10/19/2023
DOB NOWBoiler EquipmentSigned-offChampion Combustion12/13/2022
DOB NOWConstruction FenceSigned-offTurner McKissack, A Joint10/19/2022
DOB NOWCurb CutSigned-offTurner McKissack, A Joint12/17/2021
DOB NOWCurb CutSigned-offTurner McKissack, A Joint12/17/2021
DOB NOWCurb CutSigned-offTurner McKissack, A Joint12/17/2021
DOB NOWCurb CutSigned-offTurner McKissack, A Joint12/17/2021
DOB NOWCurb CutSigned-offTurner McKissack, A Joint12/17/2021
DOB NOWCurb CutSigned-offTurner McKissack, A Joint12/17/2021
DOB NOWCurb CutSigned-offTurner McKissack, A Joint12/17/2021
DOB NOWConstruction FencePermit IssuedUnited Hoisting & Scaff12/07/2021
DOB NOWSidewalk ShedSigned-offUnited Hoisting & Scaff12/07/2021
DOB NOWConstruction FenceSigned-offTurner McKissack, A Joint10/27/2021
DOB NOWBoiler EquipmentSigned-offChampion Combustion09/17/2021
DOB NOWBoiler EquipmentSigned-offChampion Combustion09/17/2021
DOB NOWBoiler EquipmentSigned-offChampion Combustion04/27/2021
DOB NOWBoiler EquipmentSigned-offChampion Combustion02/04/2021
DOB NOWConstruction FencePermit IssuedUnited Hoisting & Scaff01/21/2021
DOB NOWSidewalk ShedSigned-offUnited Hoisting & Scaff01/19/2021
DOB NOWSidewalk ShedSigned-offUnited Hoisting & Scaff12/23/2019
DOB NOWConstruction FencePermit IssuedUnited Hoisting & Scaff12/16/2019
DOB NOWConstruction FenceSigned-offTurner McKissack, A Joint10/29/2019
DOB NOWConstruction FenceSigned-offTurner McKissack, A Joint09/09/2019
DOB NOWConstruction FencePermit IssuedUnited Hoisting & Scaff05/28/2019
DOB NOWSidewalk ShedSigned-offUnited Hoisting & Scaff05/28/2019
DOB NOWConstruction FenceSigned-offTurner McKissack, A Joint09/06/2018
BISOTISSUEDTurner McKissack, A Joint10/21/2025
BIS—ISSUEDTurner McKissack, A Joint10/21/2025
BIS—ISSUEDTurner McKissack, A Joint10/21/2025
BISSDISSUEDRael Automatic Sprinkler Co02/06/2025
BISSPISSUEDRael Automatic Sprinkler Co02/06/2025
BIS—ISSUEDTurner McKissack, A Joint10/29/2024
BIS—ISSUEDTurner McKissack, A Joint10/22/2024
BISOTISSUEDTurner McKissack, A Joint10/22/2024
BIS—ISSUEDTurner McKissack, A Joint10/22/2024
BISPLISSUEDAlliance Plumbing08/23/2024
BIS—ISSUEDTurner McKissack, A Joint08/02/2024
BIS—ISSUEDTurner McKissack, A Joint08/02/2024
+ 38 more permits on file
1 project · most recent 03/10/2026
Medical Gas Water/Sanitary
FiledStatusContractorScope
03/10/2026——Medical Gas, Water/Sanitary
7 projects · most recent 09/11/2025
General Wiring HVAC Wiring Lighting
FiledStatusContractorScope
09/11/2025CompletePrimiano Corp DbaGeneral Wiring
08/09/2022CompleteLCJ Electrical Contractors—
07/07/2021CompleteE-J Electric Installation Co—
12/01/2020CompleteMulti-Phase Electrical ServicesHVAC Wiring
03/20/2020Permit IssuedTransel Elev. & ElectricGeneral Wiring
02/18/2020CompleteA.S.R. Electrical ContractingGeneral Wiring, Lighting
01/10/2019CancelledVerde Electric—
1 project · most recent 03/10/2026
Steel Concrete
FiledStatusContractorScope
03/10/2026——Steel, Concrete
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/31/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/22/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/29/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
03/09/2026Designated Seismic System—special
02/02/2026Post-installed Anchors—special
02/02/2026Structural Stability – Alterations of existing buildings—special
02/02/2026Structural Steel - Welding—special
02/02/2026Structural Steel - High Strength Bolting—special
02/02/2026Structural Steel - Details—special
02/02/2026Preliminary—progress
01/22/2026Fire-Resistant Penetrations and Joints—special
01/22/2026Fire-Resistant Penetrations and Joints—special
10/03/2025Sprinkler Systems—special
10/03/2025Final—progress
01/08/2023Maintenance informationStephen Marcheseenergy_progress
01/08/2023Heating SystemsStephen Marchesespecial
01/08/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Marchesespecial
01/08/2023HVAC-R and service water heating equipmentStephen Marcheseenergy_progress
01/08/2023HVAC-R and service water heating system controlsStephen Marcheseenergy_progress
01/05/2023HVAC-R and service water heating equipmentStephen Marcheseenergy_progress
01/05/2023Heating SystemsStephen Marchesespecial
01/05/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Marchesespecial
01/05/2023Maintenance informationStephen Marcheseenergy_progress
01/05/2023HVAC-R and service water heating system controlsStephen Marcheseenergy_progress
04/21/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Marchesespecial
12/22/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsStephen Marchesespecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York City Health & HospitalsMedical / HealthcareFloor 3
Project B01297605 Alteration · Approved · 01/28/2026
H+H Coney Island HospitalMedical / HealthcareCellar, Floors 1, 5
Project B01134189 Alteration · LOC Issued · 11/04/2024
Project B07994870 Alteration · LOC Issued · 09/12/2022
Project B00466404 Alteration · LOC Issued · 03/02/2021
Project B00472530 Alteration · LOC Issued · 03/02/2021
Project B00472565 Alteration · LOC Issued · 03/02/2021
Project B00472582 Alteration · LOC Issued · 03/02/2021
Project B00472625 Alteration · LOC Issued · 03/02/2021
Project B00472630 Alteration · LOC Issued · 03/02/2021
Project B00472637 Alteration · LOC Issued · 03/02/2021
Project B00419115 Alteration · LOC Issued · 10/29/2020
Project B00172098 Alteration · LOC Issued · 05/24/2019
N<c Health Hospital Cone< Islan HospitalMedical / Healthcare—
Project B00070597 Alteration · LOC Issued · 08/16/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 682 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch9
09/03/2026B00070597-I1Request digital key ↗
08/28/2026B07994870-I1Request digital key ↗
08/28/2026B07994870-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut7
09/01/2026B00472625-I1Request digital key ↗
09/01/2026B00472630-I1Request digital key ↗
09/01/2026B00472565-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00419115-I1Request digital key ↗
08/14/2026B00419115-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00172111-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00172098-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/28/2026B08004574-I1Request digital key ↗
▸Applications & Permits149
▸BISPLAN / WORK APPROVAL APPLICATION96
01/28/2026321385826Open ↗
08/13/2025340608104Open ↗
06/16/2025320911171Open ↗
Showing 3 of 96 on file for this type
▸BISWORK PERMIT APPLICATION47
10/30/2024320911171Open ↗
11/21/2023320911171Open ↗
11/21/2023320911171Open ↗
Showing 3 of 47 on file for this type
▸BISPLAN - WORK &amp; PERMITS - SUPPPORTING DOCUMENTATION3
04/21/2023321465543Open ↗
Showing 1 of 3 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Zoning, Tax Lot & Property Records11
▸BISFLOOD ZONE COMPLIANCE8
06/27/2025321071594Open ↗
02/22/2024340655295Open ↗
05/05/2023340655231Open ↗
Showing 3 of 8 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION PRIOR TO FULL NB APPROVAL1
08/09/2022320911171Open ↗
▸Seals & Professional Certifications70
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/03/2026B00070597-I1Open ↗
09/02/2026B00172098-I1Open ↗
09/02/2026B00172111-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
03/16/2023340883299Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
03/16/2023340883299Open ↗
Showing 1 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
03/16/2023340883299Open ↗
Showing 1 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00419115-I1Open ↗
08/24/2026B00419115-P1Open ↗
08/23/2026B07994870-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/21/2023321465543Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B07994870-P1Open ↗
08/23/2026B07994870-I1Open ↗
▸Trade Schedules & Equipment41
▸BISSCHEDULE B - PLUMBING20
06/16/2025320911171Open ↗
10/06/2023340655295Open ↗
09/06/2023320911171Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE C - HEATING &amp; COMBUSTION EQUIPMENT7
09/09/2022340655231Open ↗
08/30/2022340655231Open ↗
Showing 2 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/05/2023320911171Open ↗
01/05/2023320911171Open ↗
Showing 2 of 3 on file for this type
▸BISSTANDPIPE SYSTEMS3
06/27/2025321071594Open ↗
02/22/2024340655295Open ↗
11/03/2022321465543Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/05/2023320911171Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST5
08/22/2025340608104Open ↗
04/10/2023320911171Open ↗
Showing 2 of 5 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
07/28/2022320911171Open ↗
Showing 1 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
05/11/2023340659683Open ↗
05/05/2023340655231Open ↗
12/27/2022320911171Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* HVAC INSULATION AND SEALING2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸BISELECTRIC MOTORS2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B07994870-I1Open ↗
▸Inspections & Test Reports64
▸BISTECHNICAL REPORT: RESPONSIBILITY37
06/27/2025321071594Open ↗
05/15/2023321387110Open ↗
05/05/2023340655231Open ↗
Showing 3 of 37 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
03/16/2023340883299Open ↗
Showing 1 of 2 on file for this type
▸BISSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMECHANICAL SYSTEMS2
05/05/2023340659683Open ↗
12/27/2022320911171Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - WELDING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
08/12/2022320911171Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs101
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
09/02/2026B00172098-I1Open ↗
09/02/2026B00172111-I1Open ↗
09/02/2026B00419115-I1Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
05/02/2025321829722Open ↗
05/02/2025321829722Open ↗
05/02/2025321829722Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
07/23/2025321071594Open ↗
05/05/2025340655295Open ↗
05/02/2025321829722Open ↗
Showing 3 of 15 on file for this type
▸BISFINAL12
06/27/2025321071594Open ↗
07/09/2024340688303Open ↗
02/22/2024340655295Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
09/02/2026B00419115-I1Open ↗
08/14/2026B00419115-P1Open ↗
08/13/2026B00472637-I1Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
02/24/2023320911171Open ↗
02/21/2023320911171Open ↗
02/16/2023320911171Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
09/02/2026B00419115-I1Open ↗
08/13/2026B00472582-I1Open ↗
08/13/2026B00472637-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT (FINAL): PW313
07/22/2025321071594Open ↗
04/23/2025321829722Open ↗
06/27/2023340883299Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT13
03/16/2023340883299Open ↗
Showing 1 of 13 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
10/30/2024320911171Open ↗
11/21/2023320911171Open ↗
11/03/2023320911171Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
11/21/2023320911171Open ↗
11/03/2023320911171Open ↗
Showing 2 of 3 on file for this type
▸Filing & Intake Forms92
▸BISADDITIONAL INFORMATION65
08/22/2025340608104Open ↗
06/27/2024340608104Open ↗
11/02/2023340655295Open ↗
Showing 3 of 65 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
03/16/2023340883299Open ↗
Showing 1 of 12 on file for this type
▸BISEFILING COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISBOROUGH INTAKE FORM4
08/08/2023320911171Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWAI1 Form1
08/13/2026B08004574-I1Open ↗
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLOWEST FLOOR ELEVATION5
02/22/2024340655295Open ↗
06/13/2023321387110Open ↗
05/05/2023340655231Open ↗
Showing 3 of 5 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)4
11/02/2023340655295Open ↗
06/16/2023321387110Open ↗
05/12/2023340659683Open ↗
Showing 3 of 4 on file for this type
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS2
05/05/2023340659683Open ↗
08/12/2022320911171Open ↗
▸BISSHUTOFF DAMPERS2
05/05/2023340655231Open ↗
12/22/2022320911171Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)2
05/05/2023340659683Open ↗
08/12/2022320911171Open ↗