Large suburban residence
262-09 GRAND CENTRAL PKWY
QUEENS · Douglaston-Little Neck · BIN 4173351
💬 Discuss this project
1955Year Built
2.25Stories
A3Building Class
R2AZoning
4,064 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · Owner of record: HAJRAH PROPERTIES LLC · 7,633 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Attic12p · 2 filings · 20 docs
Floor 27p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar12p · 2 filings · 20 docs
Site & exterior2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED RESTORATION & DEVELOP203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2020$840K—Private party → HAJRAH PROPERTIES LLC$207/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT706/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONTI UNITED CONSTRUCTIONGeneral Contractor1907/08/2026
PERSPECTIVE GENERAL CONSTGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing307/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642506/24/2025
Building Lifecycle
All (91)Filed (7)Permit Issued (15)Signed Off (2)Violation (3)Inspection (10)Objection (24)Special Inspection (30)
05/01/2026
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Ventilation and air distribution system
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Protection of exposed foundation insulation
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Masonry
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Heating Systems
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Final
TARIQ SIDDIQUI
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Footing and Foundation
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Metering
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
05/01/2026
Special inspection requirement — Electric vehicle service equipment requirements
MUZAFFAR JAMAL
04/23/2026
Objection resolved — Resolved
04/23/2026
Objection resolved — Resolved
02/05/2026
Objection raised — Structural
12/18/2025
Objection raised — Energy
10/30/2025
Signed off — Alteration
INSTALLATION OF NEW CURB CUT AS PER DRAWING.
Q00474431-I1
10/29/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/07/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/16/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
06/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION AND VERTICAL EXTENSION OF EXISTING ONE FAMILY HOUSE, AS PER DRAWINGS HEREWITH FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. RELATED NEW ONE CAR GARAGE,FENCE,CURBCUT,PLUMBING & BPP WORK HAS BEEN FILED UNDER APPLICATION # 440666637,Q00474438,Q004
Q00565024-P3
04/18/2025
Permit issued — Curb Cut
Q00474431-I1-CC
04/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/12/2024
Permit issued — Structural
Q00565024-I1-GC-CX
08/09/2024
Signed off — Alteration
Q00474438-I1
06/12/2024
Violation issued (ECB, closed)
Construction
06/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
06/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
05/28/2024
Objection raised — Admin
05/28/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Mechanical
05/28/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Other
05/28/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Scope
05/28/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Inspections
05/28/2024
Objection resolved — Addressed
05/16/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
ALTERATION AND VERTICAL EXTENSION OF EXISTING ONE FAMILY HOUSE, AS PER DRAWINGS HEREWITH FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. RELATED NEW ONE CAR GARAGE,FENCE,CURBCUT,PLUMBING & BPP WORK HAS BEEN FILED UNDER APPLICATION # 440666637,Q00474438,Q004
Q00565024-P1
05/15/2024
Filed — Alteration
Install new plumbing fixtures and related piping as per drawing.
Q00474426-P1
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMONTI UNITED CONSTRUCTION04/18/2025
DOB NOWStructuralPermit IssuedMONTI UNITED CONSTRUCTION09/12/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG04/03/2024
DOB NOWEarth WorkPermit IssuedMONTI UNITED CONSTRUCTION11/22/2023
DOB NOWConstruction FenceSigned-offMONTI UNITED CONSTRUCTION09/15/2023
DOB NOWConstruction FenceSigned-offMONTI UNITED CONSTRUCTION06/26/2023
DOB NOWConstruction FenceSigned-offMONTI UNITED CONSTRUCTION12/29/2022
DOB NOWStructuralPermit IssuedMONTI UNITED CONSTRUCTION12/09/2022
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG06/24/2022
DOB NOWFoundationPermit IssuedMONTI UNITED CONSTRUCTION02/25/2022
DOB NOWEarth WorkPermit IssuedMONTI UNITED CONSTRUCTION02/10/2022
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/17/2021
DOB NOWConstruction FenceSigned-offMONTI UNITED CONSTRUCTION12/06/2021
DOB NOWMechanical SystemsPermit IssuedMONTI UNITED CONSTRUCTION11/18/2021
DOB NOWConstruction FenceSigned-offPERSPECTIVE GENERAL CONST07/20/2021
1 project · most recent 06/24/2025
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2025Permit IssuedMONTI UNITED CONSTRUCTIONAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Goodman ASPT39C14 3 tons · Ahu ×15
Heating
A.O. Smith GDHE 75 100,000 BTU · Water Heater ×3
Ventilation
Greenheck SP-C50-QD 50 CFM · Exhaust Fan ×18
SP-B90 100 CFM · Exhaust Fan ×6
Ducts & Piping
Williamson GWA 70 70,000 BTU · Boiler ×6
1 project · most recent 05/15/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/15/2024Signed-offJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
3 projects · most recent 04/29/2026
General Wiring
FiledStatusContractorScope
04/29/2026Permit IssuedBERGER QUALITY ELEC'L CON—
09/18/2024CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
09/18/2024CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
1 project · most recent 06/24/2025
Wood
FiledStatusContractorScope
06/24/2025Permit IssuedMONTI UNITED CONSTRUCTIONWood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/29/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/07/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
09/16/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
04/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2024Fail-Final CND-Occupancy InspectionFailView ↗
04/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
05/01/2026Electric vehicle service equipment requirementsMUZAFFAR JAMALenergy_progress
05/01/2026Ventilation and air distribution systemMUZAFFAR JAMALenergy_progress
05/01/2026HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
05/01/2026HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
05/01/2026Interior lighting powerMUZAFFAR JAMALenergy_progress
05/01/2026Maintenance informationMUZAFFAR JAMALenergy_progress
05/01/2026Fenestration areasMUZAFFAR JAMALenergy_progress
05/01/2026Protection of exposed foundation insulationMUZAFFAR JAMALenergy_progress
05/01/2026Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
05/01/2026Mechanical SystemsMUZAFFAR JAMALspecial
05/01/2026Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
05/01/2026MasonryMUZAFFAR JAMALspecial
05/01/2026Excavations - Sheeting, Shoring, and BracingMUZAFFAR JAMALspecial
05/01/2026Subgrade InspectionsMUZAFFAR JAMALspecial
05/01/2026Heating SystemsMUZAFFAR JAMALspecial
05/01/2026Structural Stability – Alterations of existing buildingsMUZAFFAR JAMALspecial
05/01/2026Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
05/01/2026FinalTARIQ SIDDIQUIprogress
05/01/2026Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
05/01/2026Footing and FoundationMUZAFFAR JAMALprogress
05/01/2026Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
05/01/2026MeteringMUZAFFAR JAMALenergy_progress
05/01/2026HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
05/01/2026Fenestration air leakageMUZAFFAR JAMALenergy_progress
05/01/2026Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
Latest 25 of 62.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch3
08/19/2026Q00565024-P1Request digital key ↗
08/15/2026Q00565024-P3Request digital key ↗
08/15/2026Q00565024-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/22/2026Q00474426-I1Request digital key ↗
08/15/2026Q00474426-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00474438-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/23/2026Q00474431-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
06/16/2025440666637Open ↗
02/07/2025440666637Open ↗
04/08/2021421786231Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/21/2025440817680Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00565024-P3Open ↗
08/13/2026Q00565024-I1Open ↗
08/13/2026Q00565024-P1Open ↗
▸BISZONING DIAGRAM2
06/28/2021421786231Open ↗
05/26/2021440666637Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00565024-I1Open ↗
▸Seals & Professional Certifications72
▸DOB NOWProgress Inspector Seal & Signature43
09/01/2026Q00474426-I1Open ↗
09/01/2026Q00474426-I1Open ↗
09/01/2026Q00474426-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026Q00474426-I1Open ↗
09/01/2026Q00474426-I1Open ↗
09/01/2026Q00565024-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00474438-I1Open ↗
08/23/2026Q00474431-I1Open ↗
08/19/2026Q00565024-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
02/13/2025440817680Open ↗
03/24/2021440666637Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/29/2024440817680Open ↗
03/24/2021440666637Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00565024-P1Open ↗
08/13/2026Q00565024-I1Open ↗
08/13/2026Q00565024-P3Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
02/13/2025440817680Open ↗
05/26/2021440666637Open ↗
03/16/2021421786231Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/13/2025440817680Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00565024-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026Q00565024-P1Open ↗
08/15/2026Q00565024-P3Open ↗
08/15/2026Q00565024-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/02/2021421786231Open ↗
03/16/2021421786231Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/28/2021421786231Open ↗
03/24/2021440666637Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/24/2021440666637Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
06/28/2021421786231Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00565024-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY9
06/28/2021421786231Open ↗
06/28/2021421786231Open ↗
04/02/2021421786231Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
04/02/2021421786231Open ↗
03/24/2021440666637Open ↗
03/16/2021421786231Open ↗
▸BISSOIL REPORT2
04/02/2021421786231Open ↗
03/24/2021440666637Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE3
04/02/2021421786231Open ↗
03/29/2021421786231Open ↗
03/24/2021440666637Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
06/28/2021421786231Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
06/28/2021421786231Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026Q00565024-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00565024-I1Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION2
06/28/2021421786231Open ↗
03/16/2021421786231Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/29/2024440817680Open ↗
03/24/2021440666637Open ↗
▸BISBOROUGH INTAKE FORM1
07/02/2021421786231Open ↗
▸BISEFILING COVER SHEET1
07/02/2021421786231Open ↗
▸Other Documents15
▸BISPLOT DIAGRAM3
05/19/2021440666637Open ↗
04/02/2021421786231Open ↗
03/24/2021440666637Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00565024-P3Open ↗
08/13/2026Q00565024-I1Open ↗
08/13/2026Q00565024-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026Q00565024-I1Open ↗
08/13/2026Q00565024-P1Open ↗
08/13/2026Q00565024-P3Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/21/2025440817680Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
03/24/2021440666637Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/21/2025440817680Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00565024-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00565024-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00565024-I1Open ↗