← Back
BuildNYC
One family attached or semi-detached
262 15TH STREET
BROOKLYN · BIN 3023962
💬 Discuss this project
1899Year Built
2Stories
A5Building Class
R6BZoning
975 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 1,375 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
AtticUnder Construction10p · 2 filings · 20 docs
Floor 2Under Construction11p · 2 filings · 20 docs
Floor 1Under Construction11p · 2 filings · 20 docs
BasementUnder Construction2p · 1 filing · 17 docs
Sub-BasementUnder Construction10p · 2 filings · 20 docs
Site & exteriorProposed Heavy Duty Sidewalk Shed (live Load - 300 Psf)Under Construction13p · 2 filings · 4 docs
Filed — no permit issued1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Oren Neria Apt 7A608/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/27/2026$725K—— → —$744/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Prime Zone Building Consulting607/28/2026
Always Fast Services206/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Park Contracting GroupScaffold309/13/2026
MG DecorationsGeneral Contractor107/08/2026
Samuel & Sons P & HPlumbing107/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244307/27/2026
Prime Zone Building Consulting9474307/27/2026
Building Lifecycle
All (38)Filed (8)Permit Issued (5)Violation (2)Inspection (3)Special Inspection (20)
09/11/2026
Permit issued — Sidewalk Shed
B01409586-I1-SH
09/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/28/2026
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE FOR ALT-2 FILED UNDER DOB # B01359109
B01437636-I1
07/27/2026
Filed — Alteration
PLUMBING WORK IN EXISTING 2 STORY WITH ATTIC & BASEMENT, 1 FAMILY BUILDING, AS PER PLANS IN CONJUNCTION WITH ALT 2 APPLICATION # B01359109-I1, NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01359130-P1
07/27/2026
Filed — Alteration
INTERIOR RENOVATION IN EXISTING (2) TWO STORY WITH ATTICE AND BASEMENT, (1) ONE-FAMILY BUILDING TO RECTIFY ECB VIOLATIONS # 34183840Z, AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01359109-P2
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
07/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
07/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
07/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
07/24/2026
Special inspection requirement — Fenestration air leakage
JICHEN SUN
07/24/2026
Special inspection requirement — Interior lighting power
JICHEN SUN
07/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JICHEN SUN
07/24/2026
Special inspection requirement — Fenestration areas
JICHEN SUN
07/24/2026
Special inspection requirement — Air barrier - visual inspection
JICHEN SUN
07/07/2026
Permit issued — Plumbing
B01359130-I1-PL
06/12/2026
Permit issued — Sidewalk Shed
B01409586-I1-SH
06/05/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01409588-I1
06/05/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01409586-I1
06/05/2026
Permit issued — Supported Scaffold
B01409588-I1-SF
06/03/2026
Filed — Alteration
INTERIOR RENOVATION IN EXISTING (2) TWO STORY WITH ATTICE AND BASEMENT, (1) ONE-FAMILY BUILDING TO RECTIFY ECB VIOLATIONS # 34183840Z, AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01359109-P1
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
06/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
06/02/2026
Special inspection requirement — Air barrier - visual inspection
JICHEN SUN
06/02/2026
Special inspection requirement — Fenestration air leakage
JICHEN SUN
06/02/2026
Special inspection requirement — Fenestration areas
JICHEN SUN
06/02/2026
Special inspection requirement — Interior lighting power
JICHEN SUN
06/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JICHEN SUN
05/04/2026
Permit issued — General Construction
B01359109-I1-GC
02/24/2026
Filed — Alteration
INTERIOR RENOVATION IN EXISTING (2) TWO STORY WITH ATTICE AND BASEMENT, (1) ONE-FAMILY BUILDING TO RECTIFY ECB VIOLATIONS # 34183840Z, AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01359109-I1
02/24/2026
Filed — Alteration
PLUMBING WORK IN EXISTING 2 STORY WITH ATTIC & BASEMENT, 1 FAMILY BUILDING, AS PER PLANS IN CONJUNCTION WITH ALT 2 APPLICATION # B01359109-I1, NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01359130-I1
10/21/1998
Violation issued (DOB, closed)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
10/21/1998
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPark Contracting Group09/11/2026
DOB NOWPlumbingPermit IssuedSamuel & Sons P & H07/07/2026
DOB NOWSidewalk ShedPermit IssuedPark Contracting Group06/12/2026
DOB NOWSupported ScaffoldPermit IssuedPark Contracting Group06/05/2026
DOB NOWGeneral ConstructionPermit IssuedMG Decorations05/04/2026
1 project · most recent 07/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/27/2026Permit IssuedSamuel & Sons P & HGas, Water/Sanitary
2 projects · most recent 08/07/2026
General Wiring
FiledStatusContractorScope
08/07/2026Permit IssuedCYM Electrical ContractorGeneral Wiring
06/12/2026Permit IssuedRichard Neu—
3 projects · most recent 07/28/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
07/28/2026——Fence
06/05/2026Permit IssuedPark Contracting GroupSidewalk Shed
06/05/2026Permit IssuedPark Contracting GroupScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
07/24/2026Energy Code Compliance InspectionsJICHEN SUNprogress
07/24/2026HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
07/24/2026HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
07/24/2026HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
07/24/2026Fire-Resistant Penetrations and JointsJICHEN SUNspecial
07/24/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
07/24/2026Energy Code Compliance InspectionsJICHEN SUNprogress
07/24/2026Fenestration air leakageJICHEN SUNenergy_progress
07/24/2026Interior lighting powerJICHEN SUNenergy_progress
07/24/2026Fenestration and door U-factor and product ratingsJICHEN SUNenergy_progress
07/24/2026Fenestration areasJICHEN SUNenergy_progress
07/24/2026Air barrier - visual inspectionJICHEN SUNenergy_progress
06/02/2026Fire-Resistant Penetrations and JointsJICHEN SUNspecial
06/02/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
06/02/2026Energy Code Compliance InspectionsJICHEN SUNprogress
06/02/2026Air barrier - visual inspectionJICHEN SUNenergy_progress
06/02/2026Fenestration air leakageJICHEN SUNenergy_progress
06/02/2026Fenestration areasJICHEN SUNenergy_progress
06/02/2026Interior lighting powerJICHEN SUNenergy_progress
06/02/2026Fenestration and door U-factor and product ratingsJICHEN SUNenergy_progress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/18/2026B01359130-P1Request digital key ↗
08/18/2026B01359130-I1Request digital key ↗
08/16/2026B01359109-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026B01359130-P1Open ↗
08/16/2026B01359109-P2Open ↗
08/16/2026B01359109-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
10/15/2026B01359109-P1Open ↗
10/15/2026B01359109-P1Open ↗
09/01/2026B01359109-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
10/15/2026B01359109-P1Open ↗
10/15/2026B01359109-P1Open ↗
09/01/2026B01359109-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026B01359130-P1Open ↗
08/16/2026B01359109-P2Open ↗
08/16/2026B01359109-P1Open ↗
Showing 3 of 5 on file for this type