← Back
Elevator apt, fireproof with stores
262 Fifth Avenue
262 5 AVENUE · BIN 1015733
💬 Discuss this project
2023Year Built
54Stories
D6Building Class
C5-2Zoning
188,514 sfGross Floor Area
42Units
3 Open Violations 0 unresolved · 3 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: FIVE POINTS 262 PROJECT LLC · 4,942 sf lot · 38.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof2p · 2 filings · 12 docs
Bulkhead9p · 2 filings · 13 docs
Floor 562p · 1 filing · 4 docs
Floor 553p · 3 filings · 16 docs
Floor 541p · 1 filing · 4 docs
Floor 531p · 1 filing · 8 docs
Floor 52
Floor 51
Floor 501p · 1 filing · 8 docs
Floor 491p · 1 filing · 8 docs
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 432p · 2 filings · 8 docs
Floor 42
Floor 412p · 2 filings · 12 docs
Floor 402p · 1 filing · 8 docs
Floor 392p · 1 filing · 8 docs
Floor 383p · 1 filing · 8 docs
Floor 371p · 1 filing · 8 docs
Floor 36
Floor 35
Floor 34
Floor 33
Floor 321p · 1 filing · 8 docs
Floor 311p · 1 filing · 8 docs
Floor 301p · 1 filing · 8 docs
Floor 291p · 1 filing · 8 docs
Floor 281p · 1 filing · 8 docs
Floor 272p · 2 filings · 12 docs
Floor 261p · 1 filing · 8 docs
Floor 251p · 1 filing · 8 docs
Floor 242p · 1 filing · 8 docs
Floor 232p · 1 filing · 8 docs
Floor 222p · 1 filing · 8 docs
Floor 211p · 1 filing · 8 docs
Floor 201p · 1 filing · 8 docs
Floor 191p · 1 filing · 8 docs
Floor 18
Floor 171p · 1 filing · 4 docs
Floor 161p · 1 filing · 8 docs
Floor 154p · 2 filings · 12 docs
Floor 143p · 2 filings · 12 docs
Floor 13
Floor 123p · 3 filings · 14 docs
Floor 111p · 1 filing · 2 docs
Floor 102p · 2 filings · 10 docs
Floor 91p · 1 filing · 2 docs
Floor 81p · 1 filing · 2 docs
Floor 71p · 1 filing · 2 docs
Floor 6
Floor 51p · 1 filing · 8 docs
Floor 41p · 1 filing · 8 docs
Floor 32p · 2 filings · 12 docs
Floor 21p · 1 filing · 8 docs
Floor 1
Mezzanine1p · 1 filing · 8 docs
Cellar1p · 1 filing · 8 docs
Sub-Cellar2p · 1 filing · 8 docs
1 job · most recent 09/11/2025
Suspended Scaffold
FiledStatusContractorScope
09/11/2025Permit IssuedDORIA SCAFFOLDING LLCSuspended Scaffold
2 jobs · most recent 04/21/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/21/2026Permit IssuedDORIA SCAFFOLDING LLCSuspended Scaffold (SC)
09/11/2025Permit IssuedDORIA SCAFFOLDING LLCSuspended Scaffold (SC)
Building Lifecycle
All (132)Filed (37)Permit Issued (10)Signed Off (7)Violation (27)Objection (32)Special Inspection (19)
04/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY MATERIAL HOIST ON OUTRIGGERS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01330105-P3
04/21/2026
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
04/21/2026
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
04/21/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ZELJKO STEVANOVIC
04/21/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ZELJKO STEVANOVIC
04/02/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-A4
03/23/2026
Filed — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00961939-P5
03/19/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-A3
03/07/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-A2
03/04/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-A1
03/02/2026
Filed — Alteration
INSTALLATION OF TEMPORARY MATERIAL HOIST ON OUTRIGGERS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01330105-S1
03/02/2026
Violation issued (ECB, closed)
Construction
03/02/2026
Violation issued (ECB, open)
Construction
03/02/2026
Violation issued (ECB, open)
Site Safety
03/02/2026
Violation issued (ECB, open)
Construction
03/02/2026
Violation issued (ECB, closed)
Cranes and Derricks
03/02/2026
Special inspection requirement — Post-installed Anchors
Michael Lombardo
12/17/2025
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
12/17/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ZELJKO STEVANOVIC
12/16/2025
Filed — Alteration
INSTALLATION OF TEMPORARY MATERIAL HOIST ON OUTRIGGERS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01330105-P1
12/16/2025
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
12/16/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ZELJKO STEVANOVIC
12/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY MATERIAL HOIST ON OUTRIGGERS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01330105-I1
09/11/2025
Filed — Alteration
Installation of ADT suspended scaffold system
M01243878-P1
06/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01227012-I1
05/30/2025
Filed — Alteration
Using a vacuum glass manipulator to replace windows on the 16th, 24th, 33rd, 37th, 49th & 50th floors
M01231488-I1
05/27/2025
Special inspection requirement — Final
05/23/2025
Permit issued — Protection and Mechanical Methods
M01227012-I1-PMM
05/22/2025
Filed — Alteration
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01227012-I1
04/01/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-P9
03/28/2025
Filed — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00961939-P4
03/28/2025
Violation issued (ECB, closed)
Construction
02/27/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-P8
02/10/2025
Special inspection requirement — Post-installed Anchors
Michael Lombardo
12/31/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-P7
12/06/2024
Signed off — Alteration
M08052558-I1
12/05/2024
Violation issued (ECB, closed)
Construction
11/27/2024
Violation issued (ECB, closed)
Unknown
11/26/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-P6
11/07/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-P5
10/28/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-P4
10/23/2024
Permit issued — Construction Fence
M08032957-I1-FN
10/18/2024
Filed — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00961939-P3
10/17/2024
Special inspection requirement — Post-installed Anchors
Michael Lombardo
10/03/2024
Signed off — Alteration
Exterior supported working and loading platform to be used at the typical floors to load and unload the materials. No changes to the use or to the egress.
M08047911-I1
10/03/2024
Signed off — Alteration
Installation of a scaffold is to be supported by the working platform at each level and braced to the wall from level 13 to level 56. This application is filed in conjunction with applications # M00811904 & # 122874906
M00868593-I1
08/29/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01030524-P3
06/14/2024
Violation issued (ECB, closed)
Unknown
06/13/2024
Signed off — Alteration
M08018127-I1
06/13/2024
Signed off — Alteration
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 122874906
M00811904-I1
03/26/2024
Filed — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00961939-P2
03/21/2024
Special inspection requirement — Post-installed Anchors
Michael Lombardo
02/21/2024
Filed — Alteration
Beams will be used to facilitate installation of facade panels of new building under construction. No changes to use or egress. Filed in relation to NB 122874906
M00998521-I1
02/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steve Valjato
02/08/2024
Violation issued (ECB, closed)
Construction
02/08/2024
Violation issued (ECB, closed)
Unknown
02/05/2024
Filed — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00961939-P1
01/31/2024
Special inspection requirement — Final
Steve Valjato
01/23/2024
Objection resolved — Addressed
01/16/2024
Objection raised — Other
Latest 60 of 132 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIVE POINTS DEVELOPMENT GROUP7907/08/2026
ALBA SERVICES INC3103/22/2026
STRUCTURETECH NEW YORK INC503/22/2026
CM AND ASSOCIATES CONST1703/22/2026
CM & ASSOCIATES CONSSTRU.203/22/2026
FIVE POINTS 262 PROJECT LLC503/21/2026
FIVE POINTS DEVELOPMENT403/21/2026
RTH REALTY303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2015$17.4M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP1203/21/2026
LOMBARDO PROFESSIONAL ENGINEERING203/21/2026
LOMBARDO BUILDING CONSULTANTS503/21/2026
JM ZONING, LLC.803/21/2026
EUROCELT EXPEDITING, INC203/21/2026
VALJATO ENGINEERING P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor2807/08/2026
CM AND ASSOCIATES CONSTGeneral Contractor2007/08/2026
ALBA SERVICES INCGeneral Contractor803/21/2026
TT MECHANICAL CORPPlumbing507/08/2026
DORIA SCAFFOLDING LLCGeneral Contractor504/09/2026
SKYTRAC ACCESS GROUP, LLCGeneral Contractor507/08/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor407/08/2026
STRUCTURETECH NEW YORK INGeneral Contractor203/21/2026
DORNEVIL, DAVIDElectrical103/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
TTM GROUP CORPFire Protection105/29/2026
KNIGHT ELEC'L SERV. CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE RIGGING7880504/21/2026
LOMBARDO PROF ENGINEERING8566603/23/2026
VALJATO ENGINEERING PC2486202/21/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC05/23/2025
DOB NOWConstruction FencePermit IssuedANDAMIO SCAFFOLDING LLC10/23/2024
DOB NOWProtection and Mechanical MethodsSigned-offCHRISTOPHER B. MESBAH01/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offALBA SERVICES INC10/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offCHRISTOPHER B. MESBAH05/21/2023
DOB NOWSupported ScaffoldSigned-offALBA SERVICES INC05/11/2023
DOB NOWProtection and Mechanical MethodsSigned-offCHRISTOPHER B. MESBAH01/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offALBA SERVICES INC12/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offALBA SERVICES INC10/13/2022
DOB NOWConstruction FenceSigned-offCHRISTOPHER B. MESBAH10/13/2021
BIS—ISSUEDCM AND ASSOCIATES CONST03/04/2026
BISEQISSUEDANDAMIO SCAFFOLDING LLC10/16/2025
BISPLISSUEDTT MECHANICAL CORP04/18/2025
BIS—ISSUEDCM AND ASSOCIATES CONST03/11/2025
BISEQISSUEDANDAMIO SCAFFOLDING LLC10/23/2024
BISPLISSUEDTT MECHANICAL CORP04/18/2024
BIS—ISSUEDCM AND ASSOCIATES CONST03/04/2024
BISEQISSUEDANDAMIO SCAFFOLDING LLC10/27/2023
BIS—ISSUEDCM AND ASSOCIATES CONST08/25/2023
BISEQISSUEDCM AND ASSOCIATES CONST08/25/2023
BISEQISSUEDANDAMIO SCAFFOLDING LLC11/10/2022
BIS—ISSUEDCM AND ASSOCIATES CONST10/04/2022
BIS—ISSUEDCM AND ASSOCIATES CONST10/04/2022
BIS—ISSUEDCM AND ASSOCIATES CONST09/08/2022
BISEQISSUEDCM AND ASSOCIATES CONST09/08/2022
BIS—RE-ISSUEDCM AND ASSOCIATES CONST06/15/2022
BISEQISSUEDCM AND ASSOCIATES CONST09/29/2021
BIS—ISSUEDCM AND ASSOCIATES CONST09/29/2021
BISEQISSUEDRED BALL CONTRACTING CORP05/16/2017
BISEQISSUEDRED BALL CONTRACTING CORP05/16/2017
BIS—ISSUEDRED BALL CONTRACTING CORP05/16/2017
BISEQISSUEDSPRING SCAFFOLDING LLC02/22/2017
BISEQISSUEDSPRING SCAFFOLDING LLC02/22/2017
BISOTISSUEDPRIMEHOUSE GENERAL CONTRACTING02/12/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP11/26/2007
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
04/21/2026Post-installed AnchorsZELJKO STEVANOVICspecial
04/21/2026Post-installed AnchorsZELJKO STEVANOVICspecial
04/21/2026Alternative Materials - OTCR Buildings Bulletin NumberZELJKO STEVANOVICspecial
04/21/2026Alternative Materials - OTCR Buildings Bulletin NumberZELJKO STEVANOVICspecial
03/02/2026Post-installed AnchorsMichael Lombardospecial
12/17/2025Post-installed AnchorsZELJKO STEVANOVICspecial
12/17/2025Alternative Materials - OTCR Buildings Bulletin NumberZELJKO STEVANOVICspecial
12/16/2025Post-installed AnchorsZELJKO STEVANOVICspecial
12/16/2025Alternative Materials - OTCR Buildings Bulletin NumberZELJKO STEVANOVICspecial
05/27/2025Final—progress
02/10/2025Post-installed AnchorsMichael Lombardospecial
10/17/2024Post-installed AnchorsMichael Lombardospecial
03/21/2024Post-installed AnchorsMichael Lombardospecial
02/21/2024Structural Stability – Alterations of existing buildingsSteve Valjatospecial
01/31/2024FinalSteve Valjatoprogress
11/30/2023Post-installed AnchorsMichael Lombardospecial
02/28/2023Structural Steel - DetailsSteve Valjatospecial
02/28/2023Structural Steel - WeldingSteve Valjatospecial
02/28/2023PreliminarySteve Valjatoprogress
▾Documents — 370 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch46
09/03/2026M00599900-I1Request digital key ↗
09/02/2026M00772705-I1Request digital key ↗
09/02/2026M00774302-I1Request digital key ↗
Showing 3 of 46 on file for this type
▸Applications & Permits80
▸BISPLAN / WORK APPROVAL APPLICATION60
12/15/2025122874906Open ↗
11/14/2025122874906Open ↗
10/20/2025122874906Open ↗
Showing 3 of 60 on file for this type
▸BISWORK PERMIT APPLICATION14
04/18/2024122874906Open ↗
11/10/2022141021445Open ↗
10/04/2022122874906Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
12/15/2023122874906Open ↗
07/21/2022121291529Open ↗
07/21/2022121291529Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/13/2017121291529Open ↗
09/13/2017121291529Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT V: CERTIFICATION1
10/19/2017122874906Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/19/2017122874906Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
04/01/2022122874906Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
10/19/2017122874906Open ↗
▸BISZONING DIAGRAM1
10/23/2017122874906Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
10/19/2017122874906Open ↗
▸Seals & Professional Certifications92
▸DOB NOWDPL-1: Design Professional Seal & Signature47
09/29/2026M01330105-S2Open ↗
09/03/2026M00599900-I1Open ↗
09/02/2026M00774302-I1Open ↗
Showing 3 of 47 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
09/29/2021122874906Open ↗
09/29/2021122874906Open ↗
09/29/2021122874906Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/03/2026M00998521-I1Open ↗
09/01/2026M01243878-I1Open ↗
08/29/2026M01330105-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/03/2017123026215Open ↗
02/28/2017123026180Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/09/2022141021445Open ↗
03/03/2017123026215Open ↗
02/28/2017123026180Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/03/2026M00998521-I1Open ↗
08/22/2026M00836079-I1Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/09/2022141021445Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/09/2022141021445Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING1
02/14/2025122874906Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
10/23/2017122874906Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
10/23/2017122874906Open ↗
10/23/2017121291529Open ↗
Showing 2 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/24/2017122611762Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/24/2017122611762Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/24/2017122611762Open ↗
03/03/2017123026215Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/29/2021122874906Open ↗
09/29/2021122874906Open ↗
Showing 2 of 4 on file for this type
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX20
01/13/2023122874906Open ↗
07/15/2022122874906Open ↗
07/06/2022122874906Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
12/21/2023122874906Open ↗
11/10/2022141021445Open ↗
11/09/2022141021445Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
10/23/2017122874906Open ↗
04/12/2017122874906Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/29/2021122874906Open ↗
▸BISSOIL REPORT1
10/23/2017122874906Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/11/2023122874906Open ↗
▸Approvals, Objections & Sign-offs34
▸BISSCHEDULE A - OCCUPANCY / USE18
11/14/2025122874906Open ↗
10/20/2025122874906Open ↗
10/14/2025122874906Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/29/2021122874906Open ↗
09/29/2021122874906Open ↗
09/29/2021122874906Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER4
10/04/2022122874906Open ↗
10/04/2022122874906Open ↗
10/04/2022122874906Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/07/2018123026215Open ↗
Showing 1 of 2 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHPD: INCLUSIONARY HOUSING LETTER1
10/19/2017122874906Open ↗
▸BISLANDMARKS APPROVAL1
05/24/2017122611762Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/29/2021122874906Open ↗
05/24/2017122611762Open ↗
▸BISCOST AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION14
12/16/2024121291529Open ↗
10/13/2023122874906Open ↗
12/08/2022122874906Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET12
09/13/2017121291529Open ↗
08/21/2017122874906Open ↗
03/03/2017123026215Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM5
10/04/2022122874906Open ↗
09/29/2021122874906Open ↗
09/28/2021122874906Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/09/2022141021445Open ↗
Showing 1 of 2 on file for this type
▸Other Documents27
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION13
11/02/2017123026180Open ↗
05/24/2017122611762Open ↗
05/24/2017122611762Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWManufacturer's Specifications6
08/17/2026M01330105-P3Open ↗
08/13/2026M01243878-P1Open ↗
08/13/2026M01243878-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCalculations6
08/17/2026M01330105-P3Open ↗
08/13/2026M01243878-I1Open ↗
08/13/2026M01243878-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/24/2017122874906Open ↗