RoofUnder Construction3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 60Under Construction1 filing · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Floor 59Under Construction1 filing · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Floor 58Under Construction1 filing · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Floor 57Under Construction1 filing · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Floor 56Under Construction1 filing · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Floor 55Under Construction1 filing · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Floor 54Under Construction2 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 53Under Construction3 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 52Under Construction3 filings · 20 docs
Issued Permit Scope
Protection and Mechanical Methods
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 51Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 50Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 49Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 48Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 47Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 46Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 45Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 44Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 43Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 42Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 41Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 40Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 39Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 38Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 37Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 36Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 35Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 34Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 33Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 32Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 31Under Construction5p · 5 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe
THIS APPLICATION IS FILED FOR TEMPORARY USE PERMIT FOR A MODEL APARTMENT PURSUANT TO SECTION AC 28-111 AND BUILDING BULLETIN 2010-002.
On file for this project
2 documents · 1 drawing sheet
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Latest 3 of 5 filings on this floor.
Floor 30Under Construction4p · 5 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe
THIS APPLICATION IS FILED FOR TEMPORARY USE PERMIT FOR A MODEL APARTMENT PURSUANT TO SECTION AC 28-111 AND BUILDING BULLETIN 2010-002.
On file for this project
2 documents
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Latest 3 of 5 filings on this floor.
Floor 29Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 28Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 27Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 26Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 25Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 24Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 23Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 22Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 21Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 20Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 19Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 18Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 17Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 16Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 15Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 14Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 13Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 12Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 11Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 10Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 9Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 8Under Construction4 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Exterior supported working platform used on floors 8, 15, 20, 26, 31, 27, 41, 44, 48, and 53 to make tower crane tie connections. No changes to the use or egress. Filed in relation to NB 122874906
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 7Under Construction3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 6Under Construction3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 5Under Construction3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 4Under Construction3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 3Under Construction3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 2Under Construction2 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD AS PER PLANS FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
20 documents
Floor 1Under Construction1 filing · 8 docs
Fire Protection
Issued Permit Scope
Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
CellarUnder Construction2 filings · 10 docs
Fire Protection
Issued Permit Scope
Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents
Install temporary dry standpipe system during construction as per plans filed. No change touse, egress or occupancy. Filed in conjunction with NB# 122874906.
On file for this project
2 documents
Sub-CellarUnder Construction1 filing · 8 docs
Fire Protection
Issued Permit Scope
Sprinklers · Standpipe
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 122874906
On file for this project
8 documents