← Back
Two stories - detached, small or mid-size
262 UTTER AVENUE
STATEN ISLAND · BIN 5009244
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R2Zoning
1,002 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 6 docs
Cellar1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC209/16/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Z N J CONSTRUCTION INCGeneral Contractor107/08/2026
A & E MECHANICAL CORPPlumbing107/08/2026
Building Lifecycle
All (11)Filed (2)Permit Issued (2)Signed Off (2)Inspection (2)Special Inspection (3)
09/15/2022
Signed off — Alteration
S00551839-I1
09/09/2022
Signed off — Alteration
S00551847-I1
09/06/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/24/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/17/2021
Permit issued — Plumbing
S00551847-I1-PL
09/16/2021
Filed — Alteration
S00551847-I1
09/16/2021
Permit issued — General Construction
S00551839-I1-GC
08/11/2021
Filed — Alteration
S00551839-I1
07/29/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
07/29/2021
Special inspection requirement — Lighting in dwelling units
Steven Savino
07/02/2021
Special inspection requirement — Final
Steven Savino
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA & E MECHANICAL CORP09/17/2021
DOB NOWGeneral ConstructionSigned-offZ N J CONSTRUCTION INC09/16/2021
1 project · most recent 09/20/2021
General Wiring
FiledStatusContractorScope
09/20/2021CompletePREMIER ELEC'L CONTR'S INGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/29/2021Energy Code Compliance InspectionsSteven Savinoprogress
07/29/2021Lighting in dwelling unitsSteven Savinoenergy_progress
07/02/2021FinalSteven Savinoprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026S00551839-I1Request digital key ↗
08/25/2026S00551847-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026S00551847-I1Open ↗
08/13/2026S00551839-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026S00551839-I1Open ↗
08/26/2026S00551839-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026S00551847-I1Open ↗
08/13/2026S00551839-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00551839-I1Open ↗