Office with commercial, 7-19 stories
262 WEST 38 STREET
MANHATTAN · Midtown-Times Square · BIN 1014468
💬 Discuss this project
1924Year Built
16Stories
O6Building Class
M1-9AZoning
95,491 sfGross Floor Area
27Units
LL97 Covered4 Open Violations ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: PALOBUENO REAL ESTATE CORP · 6,583 sf lot · 14.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 2 filings · 20 docs
Floor 161 filing · 3 docs
Floor 151 filing · 3 docs
Floor 141 filing · 3 docs
Floor 131 filing · 3 docs
Floor 121 filing · 3 docs
Floor 111 filing · 3 docs
Floor 101p · 2 filings · 7 docs
Floor 91 filing · 3 docs
Floor 81p · 2 filings · 7 docs
Floor 71 filing · 3 docs
Floor 61 filing · 3 docs
Floor 51 filing · 3 docs
Floor 41 filing · 3 docs
Floor 31 filing · 3 docs
Floor 21 filing · 3 docs
Floor 11 filing · 3 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVARGA CONSTRUCTION1009/07/2026
TRI BOROUGH SCAFFOLDING303/22/2026
PALOBUENO REAL ESTATE CORP503/22/2026
FALCON PROPERTIES1303/22/2026
PAOLO BUENO PROPERTIES103/22/2026
POWLO BUENO PROPERTIES103/22/2026
OWNER OF 262 WEST 38 STRE403/22/2026
TO OWNER 262 WEST 38 STRE103/22/2026
TO OWNER OF 262 WEST 38 S203/22/2026
OWNER OF 262 WEST 38 S103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REL ENGINEERING PC404/27/2026
KELRA CONSULTANTS111/12/2025
ROBERT DERECTOR ASSOCIATES110/18/2022
NEWTEC ENGINEERING110/06/2021
DOOLING & COMPANY ARCHITECTS101/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.103/21/2026
AE DESIGN SOLUTION203/21/2026
Rigid Structural Design, LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THOMAS FAYFire Protection703/21/2026
AVARGA CONSTRUCTION CORPGeneral Contractor507/10/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor303/21/2026
ARISTA AIR CONDITIONING CORPGeneral Contractor203/21/2026
FLORES, HECTORElectrical103/21/2026
ANESIS SERVICES CORPFire Protection107/08/2026
BLASKOVIC, ALDOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOGRAPHIC CO1579111/12/2025
KENDRA E. LOGAN, REGISTER6794111/12/2025
JOSEPH MARTINES PE, PLLC1428110/18/2022
OBAID MIAN849110/06/2021
Building Lifecycle
All (114)Filed (8)Permit Issued (10)Signed Off (2)Facade (FISP) (12)Violation (60)Inspection (4)Objection (8)Special Inspection (10)
08/31/2026
Permit issued — Suspended Scaffold
M01296948-S3-SC
07/08/2026
Permit issued — Sidewalk Shed
M01367712-I1-SH
06/25/2026
Permit issued — Protection and Mechanical Methods
M01296948-S2-PMM
05/13/2026
Permit issued — Supported Scaffold
M01296948-S1-SF
05/08/2026
Permit issued — Suspended Scaffold
M01296948-S3-SC
04/30/2026
Objection resolved — Addressed
04/29/2026
Special inspection requirement — Post-installed anchors in masonry
Ariel Mazor
04/28/2026
Objection raised — Other
04/27/2026
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION.
M01296948-S3
04/22/2026
Objection raised — Other
04/22/2026
Objection resolved — Resolved
04/22/2026
Objection raised — Other
04/22/2026
Objection resolved — Addressed
04/14/2026
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION.
M01296948-S1
04/14/2026
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION.
M01296948-S2
04/10/2026
Permit issued — Sidewalk Shed
M01367712-I1-SH
04/07/2026
Permit issued — General Construction
M01296948-I1-GC
03/19/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Admin
03/06/2026
Filed — Alteration
Installation of sidewalk shed to protect pedestrian from the facade repairs on the street facing facade.
M01367712-I1
11/12/2025
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION.
M01296948-I1
10/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
asghar Ghodsi
10/03/2025
Special inspection requirement — Masonry
KENDRA LOGAN
10/02/2025
Special inspection requirement — Final
KENDRA LOGAN
05/23/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/07/2023
Violation issued (ECB, closed)
Construction
04/14/2023
Violation issued (ECB, closed)
Construction
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2023
Cycle 9 facade report submitted
02/17/2023
Signed off — Alteration
Modification to existing Sprinkler system as per plans filed herewith. Cellar count: 5 new heads 8th floor: 1 new head 10th floor: 1 new head. No change in use, occupancy or egress.
M00763642-I1
02/15/2023
Cycle 9 facade inspection completed
02/07/2023
Cycle 9 facade report signed — SWARMP
01/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/03/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/28/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/21/2022
Signed off — Alteration
Replacement of (2) 5 ton air cooled condensing units on the lower setback roof.
M00565546-I1
10/21/2022
Permit issued — Sprinklers
M00763642-I1-EW-SP
10/18/2022
Filed — Alteration
Modification to existing Sprinkler system as per plans filed herewith. Cellar count: 5 new heads 8th floor: 1 new head 10th floor: 1 new head. No change in use, occupancy or egress.
M00763642-I1
10/06/2021
Filed — Alteration
Replacement of (2) 5 ton air cooled condensing units on the lower setback roof.
M00565546-I1
10/06/2021
Permit issued — Mechanical Systems
M00565546-I1-MS
07/27/2021
Special inspection requirement — Final
Obaid Mian
07/27/2021
Special inspection requirement — Maintenance information
Obaid Mian
07/27/2021
Special inspection requirement — Mechanical Systems
Obaid Mian
07/27/2021
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
07/27/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Obaid Mian
07/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
04/16/2021
Violation issued (ECB, closed)
Construction
11/24/2020
Violation issued (ECB, closed)
Construction
06/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/27/2020
Permit issued — Supported Scaffold
M00300280-I1-SF
01/23/2020
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00300280-I1
11/12/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/09/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/09/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/19/2018
Cycle 8 facade report submitted
01/29/2018
Cycle 8 facade inspection completed
01/22/2018
Cycle 8 facade report signed — SAFE
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP08/31/2026
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP07/08/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedAVARGA CONSTRUCTION CORP06/25/2026
DOB NOWSupported ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP05/13/2026
DOB NOWSuspended ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP05/08/2026
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP04/10/2026
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP04/07/2026
DOB NOWSprinklersSigned-offTHOMAS FAY10/21/2022
DOB NOWMechanical SystemsSigned-offARISTA AIR CONDITIONING C10/06/2021
DOB NOWSupported ScaffoldPermit IssuedTRI BOROUGH SCAFFOLDING01/27/2020
BISEQISSUEDFALCON PROPERTIES INC05/09/2017
BISOTISSUEDFALCON PROPERTIES INC05/09/2017
BISOTISSUEDFALCON PROPERTIES INC09/16/2016
BISPLISSUEDPRECISION PLBG SVCS., INC11/21/2014
BISOTISSUEDFALCON PROPERTIES INC04/02/2014
BISEQISSUEDFALCON PROPERTIES INC04/02/2014
BISPLISSUEDPRECISION PLBG SVCS., INC05/29/2013
BISOTISSUEDFALCON PROPERTIES INC04/01/2013
BISEQISSUEDFALCON PROPERTIES INC04/01/2013
BISPLISSUEDPFEIFFER P,HTG,SPKL CONT03/04/2013
BISOTISSUEDFALCON PROPERTIES INC01/30/2013
BISEQISSUEDFALCON PROPERTIES INC01/30/2013
BISOTISSUEDNYC NEWLINE CONTRACTORS07/18/2012
BISOTISSUEDFALCON PROPERTIES INC04/09/2010
BISEQISSUEDMASAR PROPERTIES NV LTD04/09/2008
BISOTISSUEDMASAR PROPERTIES NV LTD04/09/2008
BISOTISSUEDFALCON PROPERTIES INC03/07/2005
BISEQISSUEDCSC OF NY INC.07/08/2003
BISOTISSUEDFALCON PROPERTIES INC05/20/2003
BISOTISSUEDFALCON PROPERTIES INC05/29/2002
BISEQISSUEDCITY SCAFFOLD CORP05/07/2002
BISOTISSUEDFALCON PROPERTIES INC06/26/2000
BISOTISSUEDFALCON PROPERTIES INC10/14/1999
BISOTISSUEDFALCON PROPERTIES INC06/29/1999
BISOTISSUEDFALCON PROPERTIES INC02/23/1999
BISOTISSUEDFALCON PROPERTIES10/21/1998
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC07/20/1998
BISBLISSUEDNAT'L MECH. SVCS PLBG LLC07/20/1998
BISEQISSUEDMERY GATES & STOREFRONTS05/28/1998
BISOTISSUEDFALCON PROPERTIES INC02/27/1998
+ 20 more permits on file
2 projects · most recent 04/08/2026
General Wiring
FiledStatusContractorScope
04/08/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
11/04/2021CompleteBLASKO ELECT'L CONTRS INCGeneral Wiring
3 projects · most recent 04/27/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/27/2026Permit IssuedAVARGA CONSTRUCTION CORPScaffold
03/06/2026Permit IssuedAVARGA CONSTRUCTION CORPSidewalk Shed
01/23/2020Permit IssuedTRI BOROUGH SCAFFOLDINGScaffold
1 project · most recent 04/27/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/27/2026Permit IssuedAVARGA CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/23/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/03/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/29/2026Post-installed anchors in masonryAriel Mazorspecial
10/03/2025Structural Stability – Alterations of existing buildingsasghar Ghodsispecial
10/03/2025MasonryKENDRA LOGANspecial
10/02/2025FinalKENDRA LOGANprogress
07/27/2021FinalObaid Mianprogress
07/27/2021Maintenance informationObaid Mianenergy_progress
07/27/2021Mechanical SystemsObaid Mianspecial
07/27/2021HVAC-R and service water heating system controlsObaid Mianenergy_progress
07/27/2021HVAC-R and service water piping design and insulationObaid Mianenergy_progress
07/27/2021HVAC-R and service water heating equipmentObaid Mianenergy_progress
▾Documents — 137 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
09/03/2026M00565546-I1Request digital key ↗
09/01/2026M00763642-I1Request digital key ↗
08/18/2026M01367712-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00300280-I1Request digital key ↗
▸Applications & Permits27
▸BISWORK PERMIT APPLICATION15
10/11/2018121622770Open ↗
05/26/2017120963500Open ↗
05/26/2017120963500Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
08/05/2020120963500Open ↗
08/05/2020122865346Open ↗
11/08/2017140708553Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications36
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
04/04/2017123048969Open ↗
08/18/2016122865346Open ↗
11/24/2015110118373Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00565546-I1Open ↗
08/17/2026M01296948-S3Open ↗
08/17/2026M01296948-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00565546-I1Open ↗
09/01/2026M00565546-I1Open ↗
09/01/2026M00565546-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00565546-I1Open ↗
09/01/2026M01296948-S3Open ↗
08/31/2026M01296948-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/05/2017123048969Open ↗
05/20/2013121622770Open ↗
07/05/2012121133040Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/20/2013121622770Open ↗
07/05/2012121133040Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/04/2017123048969Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/08/2017140708553Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
11/08/2017140708553Open ↗
05/20/2013121622770Open ↗
01/11/2013120963500Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/08/2017140708553Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/04/2017123048969Open ↗
▸Safety & Tenant Protection3
▸DOB NOWHPD-1: Anti-Harassment Area Checklist2
08/13/2026M00300280-I1Open ↗
08/13/2026M00763642-I1Open ↗
▸BISTenant Protection Plan and Notes1
01/29/2018140708553Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
11/08/2017140708553Open ↗
04/04/2017123048969Open ↗
08/18/2016122865346Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00565546-I1Open ↗
08/17/2026M01296948-I1Open ↗
08/13/2026M00763642-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/01/2012120963500Open ↗
03/26/2008110118373Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/04/2017123048969Open ↗
08/18/2016122865346Open ↗
01/31/2013120963500Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
05/20/2013121622770Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/08/2013121133040Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/08/2017140708553Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00565546-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/08/2017140708553Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS5
05/20/2013121622770Open ↗
07/05/2012121133040Open ↗
02/01/2012120963500Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/24/2015110118373Open ↗
04/08/2013121133040Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
11/08/2017140708553Open ↗
04/04/2017123048969Open ↗
08/18/2016122865346Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET9
04/04/2017123048969Open ↗
08/18/2016122865346Open ↗
07/10/2014122051778Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/08/2017140708553Open ↗
▸BISADDITIONAL INFORMATION1
01/29/2018140708553Open ↗
▸Other Documents3
▸BISDepartment of Consumer Affairs (DCA) Form1
11/10/2008110118373Open ↗
▸DOB NOWCalculations1
08/15/2026M01296948-S3Open ↗
▸DOB NOWManufacturer's Specifications1
08/15/2026M01296948-S3Open ↗