← Back
BuildNYC
Two stories - detached, small or mid-size
2626 GRAND AVENUE
BRONX · BIN 2014453
💬 Discuss this project
1901Year Built
2.75Stories
A1Building Class
R6Zoning
3,207 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
General
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 41 filing · 12 docs
Floor 31 filing · 12 docs
Floor 2
Floor 11 filing · 12 docs
Filed — no permit issuedWork in Progress3p · 3 filings · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Grid Drafting and Consulting511/06/2026
Building Lifecycle
11/06/2026
Filed — Alteration
Builders Pavement Plan in conjunction with the NB application #X01430320-I1.
X01464575-I1
10/07/2026
Filed — Full Demolition
X01458730-I1
09/30/2026
Objection resolved — Resolved
09/29/2026
Objection resolved — Resolved
09/14/2026
Objection raised — Zoning
36 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 07/31/2026
Concrete Masonry
FiledStatusContractorScope
07/31/2026——Concrete, Masonry
1 project · most recent 09/09/2026
Fence
FiledStatusContractorScope
09/09/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/29/2026Final—progress
07/29/2026Footing and Foundation—progress
07/26/2026Energy Code Compliance Inspections—progress
07/26/2026Fire-Resistance Rated Construction—progress
07/26/2026Exterior lighting power—energy_progress
07/26/2026Fenestration and door U-factor and product ratings—energy_progress
07/26/2026Interior lighting power—energy_progress
07/26/2026Lighting in dwelling units—energy_progress
07/26/2026Fenestration areas—energy_progress
07/26/2026Exterior Insulation and Finish Systems (EIFS)—special
07/26/2026Protection of exposed foundation insulation—energy_progress
07/26/2026Air barrier - visual inspection—energy_progress
07/26/2026Maintenance information—energy_progress
07/26/2026Insulation placement and R values—energy_progress
07/26/2026Fenestration air leakage—energy_progress
07/26/2026Metering—energy_progress
07/26/2026Lighting controls—energy_progress
07/26/2026Fire-Resistant Penetrations and Joints—special
20 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account