Factory, light manufacturing
2626 HALPERIN AVENUE
BRONX · BIN 2044099
💬 Discuss this project
1947Year Built
2Stories
F5Building Class
M1-1Zoning
9,254 sfGross Floor Area
1Units
0 Open Violations
Factory, light manufacturing · Owner of record: 2626 HALPERIN REALTY LLC · 9,550 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 217p · 2 filings · 20 docs
Floor 114p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/04/2021$1.8M—CERTIFIED TESTING LABORATORIES, INC. → 2626 HALPERIN REALTY LLC$198/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VILAS PARAB605/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN ALBERTO GOMEZ603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KDL CONSTRUCTION & DEVELOGeneral Contractor707/08/2026
T.N.T. PLBG & HTG, INCPlumbing507/08/2026
YOUNG CHOEElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARAB ASSOCIATES2876505/11/2023
CHONG ENGINEERING P.C.7411109/08/2022
Building Lifecycle
All (47)Filed (6)Permit Issued (5)Violation (12)Inspection (3)Objection (6)Special Inspection (15)
10/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/21/2023
Permit issued — Plumbing
X72648948-I1-PL
05/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
05/15/2023
Special inspection requirement — Sprinkler Systems
Tae Chong
05/11/2023
Filed — Alteration
Installation of New Sprinklers heads and sprinkler piping on First and Second Floor.
X00659315-P1
05/09/2023
Special inspection requirement — Sprinkler Systems
VILAS PARAB
05/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
VILAS PARAB
04/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
VILAS PARAB
04/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
VILAS PARAB
04/10/2023
Special inspection requirement — Energy Code Compliance Inspections
VILAS PARAB
03/27/2023
Permit issued — General Construction
X00558708-I1-GC
09/08/2022
Filed — Alteration
Installation of New Sprinklers heads and sprinkler piping on First and Second Floor.
X00659315-I1
07/21/2022
Special inspection requirement — Energy Code Compliance Inspections
VILAS PARAB
07/21/2022
Special inspection requirement — Interior lighting power
VILAS PARAB
07/21/2022
Special inspection requirement — Fenestration air leakage
VILAS PARAB
07/21/2022
Special inspection requirement — Lighting controls
VILAS PARAB
07/21/2022
Special inspection requirement — Fenestration areas
VILAS PARAB
07/21/2022
Special inspection requirement — Insulation placement and R values
VILAS PARAB
07/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
VILAS PARAB
07/21/2022
Special inspection requirement — Fire-Resistance Rated Construction
VILAS PARAB
07/20/2022
Objection resolved — Addressed
07/18/2022
Objection raised — Scope
07/14/2022
Filed — Alteration
Amended to extend remaining (7,542 Sq/Ft) interior renovation to complete phase II. This includes additional men's and ladies toilets including toilet fixtures and plumbing piping. No change in Occupancy, use or Egress
X00617677-P1
07/14/2022
Filed — Alteration
Amended to extend remaining (7,542 Sq/Ft) interior renovation to complete phase II. Includes removal of exist. partitions to provide open cubicle offices on the 1st & 2nd Fl., Conference rms, Staff lounge & bath rms. No change in Occupancy, use or Egress
X00558708-P1
05/17/2022
Permit issued — General Construction
X00558708-I1-GC
02/18/2022
Permit issued — Plumbing
X00617677-I1-PL
11/29/2021
Permit issued — General Construction
X00558708-I1-GC
11/03/2021
Filed — Alteration
Amended to extend remaining (7,542 Sq/Ft) interior renovation to complete phase II. This includes additional men's and ladies toilets including toilet fixtures and plumbing piping. No change in Occupancy, use or Egress
X00617677-I1
09/05/2021
Objection resolved — Addressed
09/05/2021
Objection resolved — Addressed
08/10/2021
Objection raised — Fire_Protection
08/10/2021
Objection raised — Fire_Protection
07/20/2021
Filed — Alteration
Amended to extend remaining (7,542 Sq/Ft) interior renovation to complete phase II. Includes removal of exist. partitions to provide open cubicle offices on the 1st & 2nd Fl., Conference rms, Staff lounge & bath rms. No change in Occupancy, use or Egress
X00558708-I1
01/28/2010
Violation issued (ECB, closed)
Unknown
01/28/2010
Violation issued (ECB, closed)
Unknown
01/20/2010
Violation issued (ECB, closed)
Unknown
01/20/2010
Violation issued (ECB, closed)
Unknown
11/25/2009
Violation issued (ECB, closed)
Construction
11/25/2009
Violation issued (ECB, closed)
Unknown
11/25/2009
Violation issued (ECB, closed)
Unknown
11/25/2009
Violation issued (ECB, closed)
Unknown
11/25/2009
Violation issued (ECB, closed)
Unknown
11/25/2009
Violation issued (ECB, closed)
Unknown
11/25/2009
Violation issued (ECB, closed)
Construction
11/25/2009
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT.N.T. PLBG & HTG, INC11/21/2023
DOB NOWGeneral ConstructionPermit IssuedKDL CONSTRUCTION & DEVELO03/27/2023
DOB NOWGeneral ConstructionPermit IssuedKDL CONSTRUCTION & DEVELO05/17/2022
DOB NOWPlumbingPermit IssuedT.N.T. PLBG & HTG, INC02/18/2022
DOB NOWGeneral ConstructionPermit IssuedKDL CONSTRUCTION & DEVELO11/29/2021
1 project · most recent 05/11/2023
FiledStatusContractorScope
05/11/2023———
1 project · most recent 07/14/2022
Water/Sanitary
FiledStatusContractorScope
07/14/2022Permit IssuedT.N.T PLBG & HTG, INCWater/Sanitary
1 project · most recent 04/26/2023
General Wiring Lighting
FiledStatusContractorScope
04/26/2023CompleteY.S ELECTRICGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
05/15/2023Fire-Resistant Penetrations and JointsTae Chongspecial
05/15/2023Sprinkler SystemsTae Chongspecial
05/09/2023Sprinkler SystemsVILAS PARABspecial
05/09/2023Fire-Resistant Penetrations and JointsVILAS PARABspecial
04/10/2023HVAC-R and service water heating equipmentVILAS PARABenergy_progress
04/10/2023Fire-Resistant Penetrations and JointsVILAS PARABspecial
04/10/2023Energy Code Compliance InspectionsVILAS PARABprogress
07/21/2022Energy Code Compliance InspectionsVILAS PARABprogress
07/21/2022Interior lighting powerVILAS PARABenergy_progress
07/21/2022Fenestration air leakageVILAS PARABenergy_progress
07/21/2022Lighting controlsVILAS PARABenergy_progress
07/21/2022Fenestration areasVILAS PARABenergy_progress
07/21/2022Insulation placement and R valuesVILAS PARABenergy_progress
07/21/2022Fire-Resistant Penetrations and JointsVILAS PARABspecial
07/21/2022Fire-Resistance Rated ConstructionVILAS PARABprogress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026X00617677-P1Request digital key ↗
08/24/2026X00617677-I1Request digital key ↗
08/24/2026X00659315-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature9
09/27/2026X00617677-I1Open ↗
09/27/2026X00617677-I1Open ↗
09/01/2026X00558708-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026X00617677-P1Open ↗
08/24/2026X00617677-I1Open ↗
08/24/2026X00558708-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/27/2026X00617677-I1Open ↗
09/01/2026X00558708-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026X00617677-I1Open ↗
08/24/2026X00617677-P1Open ↗
08/15/2026X00558708-I1Open ↗
Showing 3 of 6 on file for this type