BuildNYC
Shopping center, with or without parking
The Boulevard
2626 HYLAN BOULEVARD · BIN 5055377
💬 Discuss this project
1968Year Built
1Stories
K6Building Class
C4-1Zoning
310,560 sfGross Floor Area
13Units
2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: King Kullen Grocery Co · 692,719 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHaraz Coffee House, Goldfish Swim School +612p · 25 filings · 20 docs
Floor 5The Joint Chiropractic, Mattress Firm +26p · 7 filings · 20 docs
Floor 4The Joint Chiropractic, Mattress Firm +26p · 7 filings · 20 docs
Floor 3The Joint Chiropractic, Municipal Credit Union +36p · 8 filings · 20 docs
Floor 2The Joint Chiropractic, Municipal Credit Union +36p · 8 filings · 20 docs
Floor 1Haraz Coffee Shop, Goldfish Swim School +5Under Construction6p · 25 filings · 20 docs
CellarWingstop6p · 1 filing · 13 docs
Site & exteriorGoldfish Swim School, Apple Bank +113p · 9 filings · 20 docs
Filed — no permit issuedKimco Realty1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hylan Plaza35207/08/2026
Berley Realty2403/21/2026
Atlantic Hylan2303/21/2026
Kimco Realty1610/13/2026
Gamestop303/22/2026
King Kullen Grocery Co103/22/2026
TRC103/22/2026
Ellenberg Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Retail Project MangementGeneral Contractor2007/08/2026
GWG NYGeneral Contractor1007/08/2026
Mauceri Sign CoSign hanger907/08/2026
M & M Control Wiring & ELspecialty_contractor807/08/2026
L.S. Sign CoSign hanger807/08/2026
Shapel General ContractingGeneral Contractor603/21/2026
Quest Builders GroupGeneral Contractor507/08/2026
Ocs Builders GroupGeneral Contractor407/08/2026
John Gallin & SonGeneral Contractor407/08/2026
SNB Electrical ContngElectrical403/22/2026
A & F Fire Protection CoFire Protection307/08/2026
Tristate Maintenance & SEGeneral Contractor303/21/2026
L&T ConsultantsGeneral Contractor303/21/2026
Arsenal ScaffoldScaffold307/08/2026
Titan ConstructionGeneral Contractor303/21/2026
CKC Contracting Corp DbaElectrical203/22/2026
All American ConstructionGeneral Contractor203/21/2026
National MaintenanceSign hanger207/08/2026
Signs CadSign hanger207/08/2026
Metro Fire ProtectionFire Protection207/08/2026
Reliable Plumbing & HeatingPlumbing207/08/2026
RRP PlumbingPlumbing207/08/2026
F-IntGeneral Contractor107/08/2026
V&G Mechanicalspecialty_contractor107/22/2026
Arp Home ImprovementGeneral Contractor107/01/2026
Spring ScaffoldingScaffold107/08/2026
City SignsSign hanger107/08/2026
Going Sign & Servicing CoSign hanger107/08/2026
Kinetic Elect'l ContractingElectrical103/21/2026
Lebo ElectricElectrical103/22/2026
J. Caiazzo Plumbing & HeatingPlumbing107/08/2026
Neptune Signs & AwningsSign hanger107/08/2026
Paul SignsSign hanger107/08/2026
Par Plumbing CoPlumbing107/08/2026
Ecs Electrical Contg ServiceElectrical103/22/2026
Bluewater Plumbing & HeatingPlumbing107/08/2026
Capital Contracting P&HPlumbing107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
Dynamic Blue Water MechanicalPlumbing107/08/2026
Flow-Right Plumbing & HeatingPlumbing107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
Infiniti Esc PlumbingPlumbing107/04/2026
Point Property HoldingsGeneral Contractor104/09/2026
Moreair Mechanical Servicesspecialty_contractor104/09/2026
Mayne Construction of LOGeneral Contractor104/09/2026
JFZ ConstructionGeneral Contractor107/08/2026
Integrated HVAC Systems & Servicespecialty_contractor104/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Giovanni Zapata R.A3882106/23/2026
Architectural Engineering6111205/20/2026
Vincent J. Liotta P. E1974104/02/2026
Concessi Engineering540903/20/2026
Outsource Special Inspection2827607/08/2025
Whitestone Associates Engineering81443106/13/2025
Catalpa Special Inspectio2004710/07/2024
Grant Engineering2627304/11/2024
Flushing Engineering Service4373211/16/2023
Zelta Inspection7764209/07/2023
WB Engineering533411/10/2022
Atlas ATC Engineering8011107/22/2022
Building Lifecycle
All (300)Filed (69)Permit Issued (52)Signed Off (43)Violation (4)Inspection (52)Objection (50)Special Inspection (30)
10/01/2026
Signed off — Alteration
S01394804-I1
09/10/2026
Filed — Alteration
REPAIR/REPLACE EXISTING MASONRY COLUMN AND FACADE AT MATRESS FIRM SPACE DUE TO VEHICLE CRASH.
S01429860-I1
09/10/2026
Special inspection requirement — Masonry
09/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/04/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2026
Filed — Alteration
INSTALLATION OF A NEW ILLUMINATED ACCESSORY BUSINESS SIGN, INCLUDING ELECTRICAL CONNECTIONS AND ASSOCIATED MOUNTING HARDWARE. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BUILDING ENVELOPE.
S01436392-I1
07/29/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/21/2026
Permit issued — Mechanical Systems
S01394804-I1-MS
07/16/2026
Filed — No Work
S00941755-P1
07/15/2026
Special inspection requirement — Public Assembly Emergency Lighting
THOMAS BERKOSKI
07/02/2026
Permit issued — Plumbing
S01404751-I1-PL
06/29/2026
Permit issued — General Construction
S01396689-I1-GC
06/23/2026
Filed — Alteration
S01394804-I1
06/17/2026
Objection raised — Admin
06/17/2026
Objection raised — Scope
06/17/2026
Objection raised — Scope
06/16/2026
Signed off — Alteration
APPLE BANK - FILING HEREWITH FOR THE INTERIOR RENOVATION OF THE SPACE.
S01100493-I1
06/11/2026
Signed off — Alteration
REPLACEMENT OF 10 TON CAPACITY ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
S01377481-S1
06/08/2026
Special inspection requirement — Maintenance information
GIOVANNI ZAPATA
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
GIOVANNI ZAPATA
06/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
GIOVANNI ZAPATA
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
GIOVANNI ZAPATA
05/28/2026
Signed off — Alteration
REPLACEMENT OF 10 TON CAPACITY ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
S01377481-I1
05/20/2026
Filed — Alteration
NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, SCOPE OF WORK TO INCLUDE INSTALLATION OF NEW HVAC DUCT WORK AT EXISTING TENANT SPACE AND NEW BATHROOM EXHAUST FANS
S01396859-I1
05/20/2026
Filed — Alteration
NO CHANGE IN USE, EGRESS AND OR OCCUPANCY UNDER THIS APPLICATION, SCOPE OF WORK TO INCLUDE INSTALLATION OF NEW PLUMBING FIXTURES AT TENANT SPACE.
S01404751-I1
05/20/2026
Filed — Alteration
SCOPE OF WORK TO INCLUDE INTERIOR RENOVATION TO EXISTING COMMERICAL TENANT SPACE, NEW FINISHES, NEW NON BEARING PARTITIONS, NEW MILLWORK COUNTER, NO CHANGE IN USE, EGRESS AND OR OCCUPANCY UNDER THIS APPLICATION
S01396689-I1
05/19/2026
Special inspection requirement — Electrical motors and elevators
05/19/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Shoard
05/19/2026
Special inspection requirement — Maintenance information
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/19/2026
Special inspection requirement — Shutoff dampers
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
William Shoard
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Shoard
05/04/2026
Special inspection requirement — Final
William Shoard
05/04/2026
Special inspection requirement — Interior lighting power
William Shoard
05/04/2026
Special inspection requirement — Final
05/04/2026
Special inspection requirement — Lighting controls
William Shoard
05/04/2026
Special inspection requirement — Mechanical Systems
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Shoard
04/29/2026
Special inspection requirement — Final
GIOVANNI ZAPATA
04/29/2026
Special inspection requirement — Mechanical Systems
GIOVANNI ZAPATA
04/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2026
Permit issued — Mechanical Systems
S01377481-I1-MS
04/08/2026
Permit issued — Plumbing
S01377481-S1-PL
04/02/2026
Filed — Alteration
REPLACEMENT OF 10 TON CAPACITY ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
S01377481-S1
04/02/2026
Filed — Alteration
REPLACEMENT OF 10 TON CAPACITY ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
S01377481-I1
03/31/2026
Special inspection requirement — Exterior lighting power
Robert Concessi
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Concessi
03/31/2026
Special inspection requirement — Insulation placement and R values
Robert Concessi
03/31/2026
Special inspection requirement — Lighting controls
Robert Concessi
03/31/2026
Special inspection requirement — Interior lighting power
Robert Concessi
03/20/2026
Filed — Alteration CO
Interior renovation to convert existing commercial retail sales space (Unit 4: former New China Buffet) into health and fitness establishment as shown on plans filed hereby (Goldfish Swim School).
S00927104-P3
03/05/2026
Filed — Alteration CO
Interior renovation to convert existing commercial retail sales space (Unit 4: former New China Buffet) into health and fitness establishment as shown on plans filed hereby (Goldfish Swim School).
S00927104-P2
01/02/2026
Signed off — Alteration
Proposed HVAC design at Goldfish Swim School space as shown on drawings filed herewith.
S00927260-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offV&G Mechanical07/21/2026
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing07/02/2026
DOB NOWGeneral ConstructionPermit IssuedArp Home Improvement06/29/2026
DOB NOWMechanical SystemsSigned-offIntegrated HVAC Systems Service04/09/2026
DOB NOWPlumbingSigned-offGregg NY Plumbing04/08/2026
DOB NOWGeneral ConstructionSigned-offMayne Construction of LO10/09/2025
DOB NOWBoiler EquipmentSigned-offReliable Plumbing & Heating09/23/2025
DOB NOWGeneral ConstructionSigned-offGWG NY07/28/2025
DOB NOWGeneral ConstructionPermit IssuedGWG NY07/21/2025
DOB NOWGeneral ConstructionSigned-offGWG NY07/21/2025
DOB NOWSignSigned-offPaul Signs06/18/2025
DOB NOWStructuralSigned-offGWG NY06/03/2025
DOB NOWSignSigned-offWeinfeld, Elliot05/19/2025
DOB NOWGeneral ConstructionSigned-offGWG NY04/23/2025
DOB NOWGeneral ConstructionSigned-offQuest Builders Group04/23/2025
DOB NOWMechanical SystemsSigned-offQuest Builders Group04/22/2025
DOB NOWSprinklersSigned-offMetro Fire Protection03/28/2025
DOB NOWMechanical SystemsSigned-offTristate Maintenance & SE03/24/2025
DOB NOWSupport of ExcavationSigned-offGWG NY03/13/2025
DOB NOWMechanical SystemsSigned-offQuest Builders Group03/04/2025
DOB NOWGeneral ConstructionSigned-offQuest Builders Group03/04/2025
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating03/04/2025
DOB NOWSprinklersSigned-offMetro Fire Protection02/25/2025
DOB NOWMechanical SystemsSigned-offMoreair Mechanical Services02/14/2025
DOB NOWGeneral ConstructionPermit IssuedGWG NY02/07/2025
DOB NOWGeneral ConstructionSigned-offPoint Property Holdings01/30/2025
DOB NOWPlumbingSigned-offReliable Plumbing & Heating01/30/2025
DOB NOWGeneral ConstructionPermit IssuedL&T Consultants01/10/2025
DOB NOWPlumbingSigned-offCapital Contracting P&H11/29/2024
DOB NOWPlumbingSigned-offJ. Caiazzo Plumbing & Heating08/26/2024
DOB NOWMechanical SystemsSigned-offShapel General Contracting08/12/2024
DOB NOWGeneral ConstructionSigned-offShapel General Contracting08/12/2024
DOB NOWPlumbingSigned-offSuper Plumbers05/15/2024
DOB NOWSprinklersSigned-offAdvanced Automatic Sprinkler Co05/01/2024
DOB NOWGeneral ConstructionSigned-offOcs Builders Group04/12/2024
DOB NOWStructuralSigned-offOcs Builders Group04/12/2024
DOB NOWMechanical SystemsSigned-offOcs Builders Group04/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding03/06/2024
DOB NOWGeneral ConstructionSigned-offFint09/29/2023
DOB NOWSprinklersSigned-offAdvanced Automatic Sprinkler Co08/31/2023
+ 60 more permits on file
3 projects · most recent 05/20/2026
Ventilation Systems Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/20/2026——Ventilation Systems
Ventilation
— GREENHECK 75 CFM ×2
04/02/2026Signed-offIntegrated HVAC Systems & ServiceAir Conditioning Systems
Cooling
York KJ120N18R2AAAAA1A1 10 tons · Rooftop Unit ×1
06/13/2025Signed-offTristate Maintenance & SEHeating and Air Conditioning Systems
Heat / Cool
York YORK / ZQG06E2C1AA1A111A5 2,000 CFM · Rooftop Unit ×2
YORK/ZQG06E2C1AA1A111A4 1,200 CFM · Rooftop Unit ×2
4 projects · most recent 05/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/20/2026Permit IssuedInfiniti Esc PlumbingWater/Sanitary
04/02/2026Signed-offGregg NY PlumbingGas
01/23/2025Signed-offCapital Contracting P&HGas
03/20/2023——Gas, Water/Sanitary
25 projects · most recent 08/04/2026
General Wiring
FiledStatusContractorScope
08/04/2026Permit IssuedJoseph Weinstein ElectricGeneral Wiring
07/12/2026Permit IssuedAsko Electric Construction & Maintenance—
06/24/2025CompleteLimitless Electric Resources—
06/09/2025Permit IssuedEcs Electrical Contg ServiceGeneral Wiring
05/22/2025CompleteShelby Electrical—
03/26/2025CompleteEric & NG ElectricalGeneral Wiring
03/05/2025CompleteM & M Control WiringGeneral Wiring
02/06/2025CompleteInfinity ElectricGeneral Wiring
12/31/2024CompleteLebo ElectricGeneral Wiring
10/01/2024CompleteKGB Electrical ContractingGeneral Wiring
08/21/2024CompleteLebo Electric—
05/14/2024CompleteKGB Electrical Contracting—
03/09/2024CancelledPrincipal ElectricGeneral Wiring
09/12/2023CompleteSigns Cad—
08/11/2023CompleteSNB Electrical Contng—
▾Field Inspections (DOB CAP) — 59
DateTypeResultReport
08/04/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/29/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
04/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/03/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 59.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/10/2026Structural Stability – Alterations of existing buildings—special
09/10/2026Masonry—special
07/15/2026Public Assembly Emergency LightingTHOMAS BERKOSKIprogress
06/08/2026HVAC-R and service water heating system controlsGIOVANNI ZAPATAenergy_progress
06/08/2026Maintenance informationGIOVANNI ZAPATAenergy_progress
06/08/2026HVAC-R and service water piping design and insulationGIOVANNI ZAPATAenergy_progress
06/08/2026HVAC-R and service water heating equipmentGIOVANNI ZAPATAenergy_progress
05/19/2026Fire-Resistant Penetrations and Joints—special
05/19/2026Shutoff dampers—energy_progress
05/19/2026Energy Code Compliance Inspections—progress
05/19/2026HVAC-R and service water piping design and insulation—energy_progress
05/19/2026Electrical motors and elevators—energy_progress
05/19/2026Fire-Resistant Penetrations and JointsWilliam Shoardspecial
05/19/2026Duct leakage testing, insulation and design—energy_progress
05/19/2026Maintenance information—energy_progress
05/04/2026Fire-Resistant Penetrations and JointsWilliam Shoardspecial
05/04/2026Lighting controlsWilliam Shoardenergy_progress
05/04/2026Final—progress
05/04/2026Interior lighting powerWilliam Shoardenergy_progress
05/04/2026Fire-Resistance Rated ConstructionWilliam Shoardprogress
05/04/2026Energy Code Compliance InspectionsWilliam Shoardprogress
05/04/2026Mechanical Systems—special
05/04/2026FinalWilliam Shoardprogress
04/29/2026FinalGIOVANNI ZAPATAprogress
04/29/2026Mechanical SystemsGIOVANNI ZAPATAspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Haraz Coffee ShopRestaurant / Food ServiceFloor 1
Project S01396689 Alteration · OnHold-NoGoodCheck · 05/20/2026
Project S01396859 Alteration · Approved · 05/20/2026
Project S01404751 Alteration · Permit Entire · 05/20/2026
Haraz Coffee HouseRestaurant / Food ServiceRoof
Project S01377481 Alteration · LOC Issued · 04/02/2026
Goldfish Swim SchoolFitness / RecreationFloor 1
Project S01237380 Alteration · LOC Issued · 06/16/2025
Project S00941755 No Work · PA Certificate of Operation Issued · 02/06/2025
Project S00934585 Alteration · LOC Issued · 02/01/2024
Project S00927260 Alteration · LOC Issued · 01/23/2024
Project S00927263 Alteration · LOC Issued · 01/23/2024
Project S00927422 Alteration · LOC Issued · 01/23/2024
Project S00927104 Alteration CO · Permit Entire · 12/18/2023
Project S00926931 Alteration · LOC Issued · 09/27/2023
Apple BankBank / Financial branchFloor 1
Project S01218737 Alteration · LOC Issued · 05/15/2025
Project S01139882 Alteration · LOC Issued · 12/12/2024
Project S01139883 Alteration · LOC Issued · 12/12/2024
Project S01139887 Alteration · LOC Issued · 12/12/2024
Project S01136817 Alteration · LOC Issued · 12/06/2024
Project S01120245 Alteration · Approved · 12/03/2024
Project S01100493 Alteration · LOC Issued · 11/21/2024
Project S01100502 Alteration · Permit Entire · 11/21/2024
Project S01120231 Alteration · Permit Entire · 11/21/2024
JD SportsRetailFloor 1, Roof
Project S01064372 Alteration · LOC Issued · 07/23/2024
Project S01005779 Alteration · LOC Issued · 04/01/2024
Project S01005800 Alteration · LOC Issued · 03/13/2024
Project S01011691 Alteration · LOC Issued · 03/13/2024
Project S01011740 Alteration · LOC Issued · 03/13/2024
Project S01005702 Alteration · LOC Issued · 03/08/2024
The Joint ChiropracticMedical / HealthcareFloors 1–5
Project S00903834 Alteration · LOC Issued · 07/27/2023
WingstopRestaurant / Food ServiceCellar, Floor 1, Roof
Project S00825796 Alteration · LOC Issued · 05/11/2023
Project S00825852 Alteration · LOC Issued · 05/10/2023
Project S00870919 Alteration · LOC Issued · 05/10/2023
Project S00845176 Alteration · LOC Issued · 04/10/2023
Project S00838786 Alteration · LOC Issued · 03/27/2023
Five BelowRetailFloor 1, Roof
Project S00824870 Alteration · LOC Issued · 03/30/2023
Project S00823503 Alteration · LOC Issued · 03/29/2023
Project S00837927 Alteration · LOC Issued · 03/27/2023
Project S00843085 Alteration · LOC Issued · 03/21/2023
Project S00808907 Alteration · LOC Issued · 02/15/2023
Project S00808921 Alteration · LOC Issued · 02/15/2023
GameStopRetailFloor 1, Roof
Project S00838789 Alteration · LOC Issued · 03/27/2023
Project S00843042 Alteration · LOC Issued · 03/23/2023
Project S00843038 Alteration · LOC Issued · 03/21/2023
Project S00810924 Alteration · LOC Issued · 01/19/2023
Municipal Credit UnionBank / Financial branchFloors 1–3
Project S08048524 Alteration · LOC Issued · 01/12/2023
Corniche CleanersPersonal servicesFloors 1–5
Project S08053940 Alteration · LOC Issued · 12/19/2022
Mattress FirmRetailFloors 1–5
Project S08053935 Alteration · LOC Issued · 12/19/2022
Project S08053936 Alteration · LOC Issued · 12/19/2022
Project S00792255 Alteration · LOC Issued · 08/29/2022
Project S00214790 Alteration · LOC Issued · 09/04/2019
Reliance Wine & LiquorRetailFloors 1–5
Project S08053937 Alteration · LOC Issued · 12/19/2022
Mcu MonicipalcreditunionBank / Financial branchFloor 1, Roof
Project S00761640 Alteration · LOC Issued · 07/22/2022
Project S00761667 Alteration · LOC Issued · 07/22/2022
Project S00761681 Alteration · LOC Issued · 07/22/2022
Project S00761698 Alteration · LOC Issued · 07/22/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 997 on file (BIS + DOB NOW)
▸Plans & Drawings123
▸DOB NOWPlans/Sketch111
10/13/2026S01429860-I1Request digital key ↗
08/24/2026S00671746-I1Request digital key ↗
08/24/2026S00695615-P1Request digital key ↗
Showing 3 of 111 on file for this type
▸DOB NOWPlans/Sketch - Sign10
08/26/2026S00214790-I1Request digital key ↗
08/26/2026S00304907-I1Request digital key ↗
08/26/2026S00290063-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Applications & Permits70
▸BISPLAN / WORK APPROVAL APPLICATION42
01/22/2026500287619Open ↗
01/22/2026520031340Open ↗
01/22/2026500232633Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION28
10/30/2020540183077Open ↗
10/28/2019540168682Open ↗
09/09/2019520381658Open ↗
Showing 3 of 28 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications403
▸DOB NOWDPL-1: Design Professional Seal & Signature123
10/13/2026S01429860-I1Open ↗
08/26/2026S00214790-I1Open ↗
08/26/2026S00290063-I1Open ↗
Showing 3 of 123 on file for this type
▸DOB NOWProgress Inspector Seal & Signature118
10/19/2026S00761698-I1Open ↗
09/25/2026S00825796-I1Open ↗
09/25/2026S00825796-I1Open ↗
Showing 3 of 118 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature86
10/19/2026S00761698-I1Open ↗
09/25/2026S00825796-I1Open ↗
09/23/2026S00845176-P1Open ↗
Showing 3 of 86 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION42
12/11/2019520381658Open ↗
08/30/2019520381658Open ↗
06/17/2019520381658Open ↗
Showing 3 of 42 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
12/11/2019520381658Open ↗
06/17/2019520381658Open ↗
12/19/2017520279056Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
09/23/2020540183077Open ↗
10/07/2019540168682Open ↗
06/17/2019520381658Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/23/2020540183077Open ↗
10/07/2019540168682Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/23/2020540183077Open ↗
10/07/2019540168682Open ↗
Showing 2 of 4 on file for this type
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
06/17/2019520381658Open ↗
08/22/2017520279056Open ↗
08/09/2017520279056Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS6
11/16/2020520381658Open ↗
12/29/2017520279056Open ↗
06/23/2016520222884Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
11/02/2020520381658Open ↗
12/29/2017520279056Open ↗
06/23/2016520222884Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos210
▸DOB NOWOER: Notice to Proceed64
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 64 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report62
08/24/2026S00695615-P1Open ↗
08/24/2026S00695615-I1Open ↗
08/24/2026S00746465-I1Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWOER: Notice of Satisfaction54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
10/07/2019540168682Open ↗
07/25/2017520279056Open ↗
05/30/2017520271811Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
09/23/2020540183077Open ↗
10/07/2019540168682Open ↗
06/20/2019520381658Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
08/18/2020540168682Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/30/2019520381658Open ↗
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
08/30/2019520381658Open ↗
06/17/2019520381658Open ↗
12/29/2017520279056Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
04/01/2021540183077Open ↗
04/01/2021540183077Open ↗
08/18/2020540168682Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
04/01/2021540183077Open ↗
10/22/2020520381658Open ↗
09/25/2020540183077Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
09/23/2020540183077Open ↗
10/07/2019540168682Open ↗
Showing 2 of 3 on file for this type
▸BISNYCECC ANALYSIS2
10/07/2019540168682Open ↗
06/01/2016540105447Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/02/2020520381658Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/02/2020520381658Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
04/01/2021540183077Open ↗
11/02/2020520381658Open ↗
10/22/2020520381658Open ↗
Showing 3 of 10 on file for this type
▸BISMECHANICAL SYSTEMS1
11/02/2020520381658Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
04/05/2021540183077Open ↗
11/06/2020520381658Open ↗
08/18/2020540168682Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
06/17/2019520381658Open ↗
07/25/2017520279056Open ↗
05/30/2017520271811Open ↗
Showing 3 of 16 on file for this type
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT41
04/05/2021540183077Open ↗
11/06/2020520381658Open ↗
09/23/2020540183077Open ↗
Showing 3 of 41 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET17
06/17/2019520381658Open ↗
07/25/2017520279056Open ↗
07/25/2017520279056Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/23/2020540183077Open ↗
10/07/2019540168682Open ↗
Showing 2 of 4 on file for this type
▸BISADDITIONAL INFORMATION4
12/12/2019520381658Open ↗
08/30/2019520381658Open ↗
11/16/2016520224436Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
11/16/2020520381658Open ↗
12/11/2019520381658Open ↗
12/29/2017520279056Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type