← Back
One family attached or semi-detached
263 LOCKMAN AVENUE
STATEN ISLAND · BIN 5090082
💬 Discuss this project
1988Year Built
2Stories
A5Building Class
R3AZoning
1,568 sfGross Floor Area
1Units
2 Open Violations ▸
One family attached or semi-detached · 2,575 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
263 RENTAL209/07/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WALID ABDULLA108/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor109/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/26/2026
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Violation (2)Special Inspection (5)
09/03/2026
Permit issued — Solar
S01450618-I1-SL
08/26/2026
Filed — Alteration
S01450618-I1
08/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/26/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/24/2026
Special inspection requirement — Final
Walid Abdulla
05/15/2003
Violation issued (HPD, open)
B
05/15/2003
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC09/03/2026
1 project · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/26/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/26/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/24/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/24/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/24/2026FinalWalid Abdullaprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026S01450618-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026S01450618-I1Open ↗
09/23/2026S01450618-I1Open ↗
09/23/2026S01450618-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026S01450618-I1Open ↗
09/23/2026S01450618-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/27/2026S01450618-I1Open ↗