← Back
Public elementary, junior or senior high
Leaders High School
2630 BENSON AVENUE · BIN 3186454
💬 Discuss this project
1940Year Built
4Stories
W1Building Class
R5Zoning
356,000 sfGross Floor Area
1Units
LL97 Covered6 Open Violations 1 unresolved · 5 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 356,874 sf lot · 1 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Roof6p · 2 filings · 20 docs
Penthouse2p · 1 filing · 10 docs
Floor 43p · 1 filing · 10 docs
Floor 33p · 1 filing · 14 docs
Floor 25p · 1 filing · 10 docs
Floor 17p · 1 filing · 10 docs
Basement20p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY4707/08/2026
NYC DEPARTMENT OF EDUCATION303/22/2026
DEPT OF EDUCATION/PS 400303/22/2026
DOE 040503/22/2026
DEPT. OF EDUCATION 01103/22/2026
DEPARTMENT OF EDUCATION1003/22/2026
DEPT OF EDU 1203/22/2026
A.L. EASTMOND & SONS INC203/22/2026
DEPT OF EDUCATION K400 LA103/22/2026
LAFAYETTE H. SCHOOL (A. F203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE203/21/2026
W J PROFESSIONAL EXPEDITING COMPANY1803/21/2026
CASO ASSOCIATES1203/21/2026
NYC SCHOOL CONSTRUCTION AUTHORITY103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME CONTRACTORS, INCGeneral Contractor1807/08/2026
PRO-METAL CONSTRUCTIONGeneral Contractor607/08/2026
FRANCIS RICHARDSElectrical303/21/2026
MAGRIPLES JAMESElectrical203/21/2026
JAMES MAGRIPLESElectrical203/21/2026
KRISTINE DENAPOLIElectrical103/21/2026
LABCO ELETRT CONTNG CORPElectrical103/22/2026
STANCO SYSTEM ELEC'L CONTElectrical103/22/2026
JOSHUA ANDERSONElectrical103/21/2026
CEDOMIR MARAElectrical103/21/2026
EVEREST ELECTRIC CORPElectrical103/22/2026
GIOVANNI DITURIElectrical103/21/2026
A & S ELECTRIC INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351302/05/2026
FUTURE TECH CONSULTANTS O589109/22/2021
Building Lifecycle
All (156)Filed (26)Permit Issued (13)Violation (60)Objection (27)Special Inspection (30)
08/13/2026
Objection resolved — Resolved
07/20/2026
Special inspection requirement — Subgrade Inspections
07/14/2026
Special inspection requirement — Maintenance information
07/11/2026
Special inspection requirement — Insulation placement and R values
07/11/2026
Special inspection requirement — Maintenance information
06/15/2026
Objection raised — Other
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/26/2026
Violation issued (ECB, open)
Construction
05/26/2026
Violation issued (ECB, open)
Construction
05/26/2026
Violation issued (ECB, open)
Construction
05/12/2026
Objection resolved — Resolved
05/07/2026
Special inspection requirement — Post-installed Anchors
04/08/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
04/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/26/2026
Special inspection requirement — Post-installed Anchors
03/10/2026
Special inspection requirement — Insulation placement and R values
Asma Hashmi
03/03/2026
Objection raised — Other
03/03/2026
Objection raised — Other
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
02/25/2026
Filed — Alteration
B01362901-I1
02/25/2026
Filed — Alteration
B01362901-S1
02/25/2026
Filed — Alteration
Architectural Filing to Convert an Existing Third Floor Boys Locker Room into a Dance Studio and an Existing Third Floor Girls Locker Room into a Fitness Space as per plans filed herewith. No change in egress, use or occupancy.
B01362177-I1
02/25/2026
Filed — Alteration
Architectural Filing to Convert an Existing Third Floor Boys Locker Room into a Dance Studio and an Existing Third Floor Girls Locker Room into a Fitness Space as per plans filed herewith. No change in egress, use or occupancy.
B01362177-S1
02/25/2026
Objection raised — Other
02/25/2026
Objection resolved — Addressed
02/25/2026
Objection resolved — Addressed
02/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/25/2026
Special inspection requirement — Maintenance information
02/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/24/2026
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK FOR CULINARY SPACE IN BASEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01363388-S2
02/24/2026
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK FOR CULINARY SPACE IN BASEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01363388-S3
02/24/2026
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK FOR CULINARY SPACE IN BASEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01363388-S1
02/24/2026
Filed — Alteration
SUBSEQUENT FILING FOR SPRINKLER WORK FOR CULINARY SPACE IN BASEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01363388-I1
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
02/23/2026
Special inspection requirement — Maintenance information
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/23/2026
Special inspection requirement — Interior lighting power
02/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/23/2026
Special inspection requirement — Sprinkler Systems
02/23/2026
Special inspection requirement — Lighting controls
02/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/23/2026
Special inspection requirement — Post-installed Anchors
02/19/2026
Special inspection requirement — Interior lighting power
02/19/2026
Special inspection requirement — Lighting controls
02/11/2026
Objection resolved — Addressed
02/11/2026
Objection resolved — Addressed
02/10/2026
Objection raised — Other
02/05/2026
Filed — Alteration
B01351203-S1
02/05/2026
Filed — Alteration
B01351203-I1
02/03/2026
Filed — Alteration
REPLACE 36 NON-ADA COMPLIANT CROSS CORRIDOR DOORS IN THE SECOND, THIRD AND FOURTH FLOORS ONLY AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01346227-I1
12/12/2025
Objection raised — Energy
12/12/2025
Objection raised — Plumbing
12/12/2025
Objection raised — Structural
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPRIME CONTRACTORS, INC03/28/2024
DOB NOWSupported ScaffoldPermit IssuedPRIME CONTRACTORS, INC03/28/2024
DOB NOWConstruction FencePermit IssuedPRO-METAL CONSTRUCTION10/23/2023
DOB NOWConstruction FencePermit IssuedPRO-METAL CONSTRUCTION03/22/2023
DOB NOWSidewalk ShedPermit IssuedPRIME CONTRACTORS, INC03/22/2023
DOB NOWSupported ScaffoldPermit IssuedPRIME CONTRACTORS, INC03/15/2023
DOB NOWConstruction FencePermit IssuedPRO-METAL CONSTRUCTION10/21/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedPRO-METAL CONSTRUCTION04/20/2022
DOB NOWSupported ScaffoldPermit IssuedPRIME CONTRACTORS, INC03/28/2022
DOB NOWSidewalk ShedPermit IssuedPRIME CONTRACTORS, INC03/28/2022
DOB NOWSupported ScaffoldPermit IssuedPRIME CONTRACTORS, INC11/18/2021
DOB NOWConstruction FencePermit IssuedPRO-METAL CONSTRUCTION10/28/2021
DOB NOWSidewalk ShedPermit IssuedPRIME CONTRACTORS, INC10/28/2021
BISPLISSUEDVARSITY PLBG AND HTG INC10/30/2025
BISOTISSUEDPRO-METAL CONSTRUCTION07/03/2025
BISOTISSUEDPRO-METAL CONSTRUCTION07/03/2025
BISOTISSUEDPRO-METAL CONSTRUCTION07/03/2025
BISOTISSUEDPRO-METAL CONSTRUCTION07/03/2025
BISOTISSUEDPRO-METAL CONSTRUCTION07/03/2025
BISPLISSUEDVARSITY PLBG AND HTG INC11/05/2024
BISOTISSUEDPRO-METAL CONSTRUCTION10/17/2024
BISOTISSUEDPRO-METAL CONSTRUCTION10/17/2024
BISOTISSUEDPRO-METAL CONSTRUCTION10/17/2024
BISOTISSUEDPRO-METAL CONSTRUCTION10/17/2024
BISOTISSUEDPRO-METAL CONSTRUCTION10/17/2024
BISPLISSUEDVARSITY PLBG AND HTG INC11/08/2023
BISMHISSUEDCHAPMAN & EVANS INC10/24/2023
BISOTISSUEDPRO-METAL CONSTRUCTION10/24/2023
BISOTISSUEDPRO-METAL CONSTRUCTION10/24/2023
BISMHISSUEDCHAPMAN & EVANS INC10/24/2023
BISOTISSUEDPRO-METAL CONSTRUCTION10/24/2023
BISOTISSUEDPRO-METAL CONSTRUCTION10/24/2023
BISMHISSUEDCHAPMAN & EVANS INC10/24/2023
BISOTISSUEDPRO-METAL CONSTRUCTION10/24/2023
BISOTISSUEDTECHNICO CONSTRUCTION03/30/2023
BISOTISSUEDTECHNICO CONSTRUCTION03/30/2023
BISOTISSUEDTECHNICO CONSTRUCTION02/21/2023
BISOTISSUEDTECHNICO CONSTRUCTION02/21/2023
BISPLISSUEDVARSITY PLBG AND HTG INC11/14/2022
BISMHISSUEDCHAPMAN & EVANS INC10/31/2022
+ 23 more permits on file
1 project · most recent 11/26/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2025——Heating and Air Conditioning Systems
Heat / Cool
Lg ZRNU303SRAA 30,000 BTU · Vrf Indoor ×4
ZRUM060GSS0 60,000 BTU · Vrf Outdoor ×2
ZRNU243SKSA 24,200 BTU · Vrf Outdoor ×1
ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×1
1 project · most recent 02/24/2026
FiledStatusContractorScope
02/24/2026——47 heads
5 projects · most recent 02/24/2026
Water/Sanitary Storm
FiledStatusContractorScope
02/24/2026———
11/18/2025——Storm, Water/Sanitary
07/11/2025——Storm, Water/Sanitary
11/07/2024——Water/Sanitary
03/30/2022——Water/Sanitary
18 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedANCO ELECTL CONTCTNG INCGeneral Wiring
03/02/2026CompleteCHARAN ELEC'L ENTERP'S IN—
02/01/2026CompleteEVEREST ELECTRIC CORP—
09/17/2025CompleteGEMINI ELECTRIC CO., INC.—
06/26/2025CompleteEVEREST ELECTRIC CORP—
07/30/2024CompleteCHARAN ELEC'L ENTERP'S IN—
04/12/2024Permit IssuedBARBARO ELECT CO.INCGeneral Wiring
05/09/2022CompleteINLIGHT ELECTRICAL CORPGeneral Wiring
11/16/2021Permit IssuedA & S ELECTRIC INC.General Wiring
11/05/2021Permit IssuedSTANCO SYSTEM ELEC'L CONT—
11/05/2021Permit IssuedSTANCO SYSTEM ELEC'L CONT—
10/05/2021CompleteLABCO ELETRT CONTNG CORPGeneral Wiring
09/15/2021Permit IssuedSTANCO SYSTEM ELEC'L CONT—
07/07/2021Permit IssuedSTANCO SYSTEM ELEC'L CONTGeneral Wiring
10/21/2019CompleteCHARAN ELEC'L ENTERP'S IN—
2 projects · most recent 11/18/2025
Concrete
FiledStatusContractorScope
11/18/2025——Concrete
07/11/2025——Concrete
1 project · most recent 09/22/2021
Scaffold
FiledStatusContractorScope
09/22/2021Permit IssuedPRIME CONTRACTORS, INCScaffold
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
07/20/2026Subgrade Inspections—special
07/14/2026Maintenance information—energy_progress
07/11/2026Insulation placement and R values—energy_progress
07/11/2026Maintenance information—energy_progress
06/03/2026Fire-Resistance Rated Construction—progress
05/07/2026Post-installed Anchors—special
04/07/2026HVAC-R and service water piping design and insulation—energy_progress
04/07/2026Energy Code Compliance Inspections—progress
03/27/2026Fire-Resistant Penetrations and Joints—special
03/26/2026Post-installed Anchors—special
03/10/2026Insulation placement and R valuesAsma Hashmienergy_progress
03/02/2026Energy Code Compliance Inspections—progress
02/25/2026HVAC-R and service water heating equipment—energy_progress
02/25/2026Maintenance information—energy_progress
02/25/2026HVAC-R and service water heating system controls—energy_progress
02/25/2026HVAC-R and service water piping design and insulation—energy_progress
02/23/2026HVAC-R and service water piping design and insulation—energy_progress
02/23/2026Post-installed Anchors—special
02/23/2026Fire-Resistant Penetrations and Joints—special
02/23/2026Energy Code Compliance Inspections—progress
02/23/2026Lighting controls—energy_progress
02/23/2026Interior lighting power—energy_progress
02/23/2026Sprinkler Systems—special
02/23/2026Maintenance information—energy_progress
02/23/2026HVAC-R and service water heating system controls—energy_progress
Latest 25 of 93.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lafayette Educational CampusEducation—
Project B01362901 Alteration · Approved · 02/25/2026
Js Lafayette Educational CampuseEducation—
Project B01363388 Alteration · Approved · 02/24/2026
International High SchoolEducationBasement, Floors 1, 2, 4, Roof
Project B01351203 Alteration · Approved · 02/05/2026
Lafayette High SchoolEducation—
Project B01116968 Alteration · Approved · 11/07/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 168 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
09/01/2026B00590901-I1Request digital key ↗
09/01/2026B00590936-I1Request digital key ↗
08/30/2026B00708582-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
09/16/2014320714937Open ↗
02/28/2013320714937Open ↗
06/11/2010320124192Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
08/17/2021340817101Open ↗
02/28/2013320714937Open ↗
02/03/2010320124192Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
08/17/2021340817101Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/01/2026B00590775-I1Open ↗
09/01/2026B00590901-I1Open ↗
09/01/2026B00590936-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026B01116968-I1Open ↗
08/25/2026B01116968-I1Open ↗
08/25/2026B01116968-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/28/2013320714937Open ↗
02/28/2013320714937Open ↗
02/28/2013320714937Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/28/2013320714937Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/03/2010320124192Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/17/2021340817101Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01116968-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B00590775-I1Open ↗
08/13/2026B00590901-I1Open ↗
08/13/2026B00590936-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/17/2021340817101Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/03/2010320124192Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/17/2021340817101Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/17/2021340817101Open ↗
08/17/2021340817101Open ↗
▸Approvals, Objections & Sign-offs57
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
09/01/2026B00590901-I1Open ↗
09/01/2026B00590936-I1Open ↗
08/15/2026B01249328-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)23
08/13/2026B00590775-I1Open ↗
08/13/2026B01249328-I1Open ↗
08/13/2026B01363388-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/13/2026B01313853-S2Open ↗
08/13/2026B01313853-S1Open ↗
08/13/2026B01313853-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
02/28/2013320714937Open ↗
02/03/2010320124192Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
08/17/2021340817101Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/17/2021340817101Open ↗
02/03/2010320124192Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
04/15/2013320722205Open ↗
03/05/2013320714937Open ↗
03/05/2013320539823Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/17/2021340817101Open ↗
▸BISADDITIONAL INFORMATION1
08/17/2021340817101Open ↗
▸Other Documents27
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal25
08/18/2026B01363388-I1Open ↗
08/18/2026B01362177-I1Open ↗
08/18/2026B01362901-I1Open ↗
Showing 3 of 25 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
08/17/2021340817101Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B01346227-I1Open ↗