← Back
BuildNYC
Elevator cooperative
Waterview Towers
2630 CROPSEY AVENUE · BIN 3336512
💬 Discuss this project
1963Year Built
17Stories
D4Building Class
R6Zoning
421,800 sfGross Floor Area
325Units
LL97 CoveredRent Stabilized9 Active Violations 8 unresolved · 1 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator cooperative · Owner of record: Waterview Towers · 102,330 sf lot · 4.12 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofWaterview Towers INC.Under Construction2p · 3 filings · 20 docs
Floor 2Waterview Towers INC.Under Construction1p · 1 filing · 6 docs
Floor 1Waterview Towers INC.6p · 2 filings · 4 docs
Site & exteriorWaterview Towers INC.Under Construction29p · 5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Waterview Towers5311/07/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rodriguez + Gambino Architectural105/21/2025
Rigid Structural Design205/16/2025
PCS Engineering107/29/2024
Ashraf109/16/2023
Bazini Engineering206/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Champ Plumbing & Heating203/21/2026
Rigging Consultants203/21/2026
Rigid Structural Design1003/21/2026
Green Studio203/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold1111/19/2026
Canido Basonas Construction ServiceScaffold607/08/2026
Canido Basonas Construction ServiceGeneral Contractor611/07/2026
Fort-Cica Roofing GenGeneral Contractor203/21/2026
Champion Combustionspecialty_contractor107/08/2026
Illuminous ElectricElectrical103/21/2026
Reliable Plumbing & HeatingPlumbing107/08/2026
Empire Scaffolding SystemGeneral Contractor103/21/2026
Tower Building ServicesGeneral Contractor103/21/2026
Sanford Stein ConsultantsPlumbing103/21/2026
Everest ScaffoldingGeneral Contractor207/18/2017
JTC AssociatesGeneral Contractor106/30/1998
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Urban Integrations7993306/26/2025
George J. Xerakias, PE1658105/21/2025
Metric Consulting1803105/21/2025
PCS Engineering3745107/29/2024
Bazini Engineering1808106/24/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/17/2026
Permit renewed — Sidewalk Shed
Renewed without changes
B00931602-I1-SH
10/14/2026
Permit renewed — General Construction
Renewed with changes
B01217825-I1-GC
10/07/2026
Closed: Elevator: elevatorrequired (DOB violation)
DOB violation · closed on the city's record
09/28/2026
Elevator Category 1 inspection report filed
202 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY11/17/2026
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service10/14/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY08/31/2026
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service07/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCanido Basonas Construction Service04/15/2026
DOB NOWSuspended ScaffoldSigned-offHobo Construction03/26/2026
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction Service03/11/2026
DOB NOWSuspended ScaffoldPermit IssuedCanido Basonas Construction02/12/2026
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service11/17/2025
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/08/2025
DOB NOWGeneral ConstructionPermit IssuedCanido Basonas Construction Service07/08/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCanido Basonas Construction Service05/19/2025
DOB NOWSuspended ScaffoldPermit IssuedCanido Basonas Construction04/25/2025
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction Service04/22/2025
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/16/2024
DOB NOWSuspended ScaffoldSigned-offHobo Construction07/29/2024
DOB NOWSuspended ScaffoldPermit IssuedHobo Construction03/14/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/18/2023
DOB NOWPlumbingSigned-offReliable Plumbing & Heating07/01/2021
DOB NOWMechanical SystemsPermit IssuedChampion Combustion07/01/2021
BISEQISSUEDEverest Scaffolding07/18/2017
BISOTISSUEDFort-Cica Roofing & Gen04/19/2017
BISOTISSUEDFort-Cica Roofing & Gen02/23/2017
BISEQISSUEDEverest Scaffolding07/18/2016
BISOTISSUEDFort-Cica Roofing & Gen07/18/2016
BISOTISSUEDTower Building Services02/23/2011
BISEQISSUEDEmpire Scaffolding System01/21/2011
BISOTISSUED2323 Development06/30/1998
BISPLISSUEDSanford Stein Consultants03/18/1993
BISOTISSUEDScientific Compactor05/08/1992
2 projects · most recent 07/13/2026
General Wiring
FiledStatusContractorScope
07/13/2026Permit IssuedRichard Neu—
10/17/2023CompleteIlluminous ElectricGeneral Wiring
2 projects · most recent 04/22/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/22/2025Permit IssuedCanido Basonas Construction ServiceScaffold
09/16/2023Permit IssuedPlatinum Services NYSidewalk Shed
2 projects · most recent 06/26/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/26/2025Permit IssuedCanido Basonas ConstructionSuspended Scaffold (SC)
03/01/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/21/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/05/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
06/05/2025Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
06/05/2025Post-installed AnchorsDANNY TRUJILLOspecial
05/12/2025Post-installed AnchorsSAMI HAJJAR P.Especial
05/12/2025Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
05/02/2025Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
05/02/2025Post-installed AnchorsDANNY TRUJILLOspecial
05/02/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
04/29/2025FinalSTEVEN GAMBINOprogress
04/29/2025Tenant Protection Plan ComplianceGeorge Xerakiasspecial
07/25/2024Post-installed AnchorsMichael Walshspecial
07/16/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
02/28/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
103 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account