← Back
Elevator apt, semi-fireproof with stores
240 1 AVENUE
MANHATTAN · Stuyvesant Town-Peter Cooper Village · BIN 1082872
💬 Discuss this project
1945Year Built
13Stories
D7Building Class
R7-2Zoning
8,942,176 sfGross Floor Area
8,812Units
LL97 CoveredRent Stabilized19 Open Violations 18 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: BPP ST OWNER LLC · 2,675,000 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof3p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar5p · 3 filings · 20 docs
Basement1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BPP ST OWNER LLC STUYTOWN103/22/2026
CIITGROUP TECHNOLOGY INC C/O GLOBAL SOURCING AND SERVICES103/22/2026
COMPASS ROCK REAL ESTATE LLC603/21/2026
__STUYTOWN PROPERTY SERVICES__103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2015$4.1B—ST-DIL LLC → BPP ST OWNER LLC$460/sf building
06/03/2014$3.3B—— → —$372/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING203/21/2026
PAUL FUSCO CONSULTING403/21/2026
LOUIS STRIAR203/21/2026
EPAC BUILDING CONSULTING INC203/21/2026
K M DOB CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTAURI DEVELOPMENT INCGeneral Contractor303/21/2026
DKT CONTRACTORS LLCGeneral Contractor303/21/2026
METROPOLITAN MECHANICAL CGeneral Contractor207/08/2026
CK PLUMBING & MECH INCPlumbing107/08/2026
ALBERT DATTOLOElectrical103/22/2026
RED HOOK SIGN ELECTScaffold107/08/2026
NEW YORK EMPIRE ELECL CONElectrical103/22/2026
DIONISOS CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METROPOLITAN MECHANICAL C2277209/02/2025
SY ENGINEERING PLLC5149307/01/2024
ZELTA INSPECT LLC7764106/17/2022
Building Lifecycle
All (57)Filed (9)Permit Issued (7)Signed Off (7)Violation (2)Objection (2)Special Inspection (30)
05/06/2026
Signed off — Alteration
M01208000-I1
09/09/2025
Permit issued — Mechanical Systems
M01208000-I1-MS
09/02/2025
Filed — Alteration
M01208000-I1
07/23/2024
Signed off — Alteration
replace existing air-cooled heat pump/ recovery VFR System and outdoor refrigeration system for this tenant space with new, The capacities of equipment remains the same , no change in use, egree or occupancy
M00970449-I1
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
07/11/2024
Special inspection requirement — Final
YUNHO LEE
07/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
07/11/2024
Special inspection requirement — Maintenance information
SUNGBOM YI
07/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
07/11/2024
Special inspection requirement — Shutoff dampers
SUNGBOM YI
07/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
07/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
SUNGBOM YI
07/11/2024
Special inspection requirement — Mechanical Systems
SUNGBOM YI
07/10/2024
Objection resolved — Addressed
07/09/2024
Objection raised — Scope
07/01/2024
Filed — Alteration
replace existing air-cooled heat pump/ recovery VFR System and outdoor refrigeration system for this tenant space with new, The capacities of equipment remains the same , no change in use, egree or occupancy
M00970449-P1
06/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/24/2024
Special inspection requirement — Mechanical Systems
SUNGBOM YI
06/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
06/24/2024
Special inspection requirement — Maintenance information
SUNGBOM YI
06/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
06/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
06/24/2024
Special inspection requirement — Final
YUNHO LEE
06/24/2024
Special inspection requirement — Shutoff dampers
SUNGBOM YI
06/24/2024
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
01/31/2024
Permit issued — Mechanical Systems
M00970449-I1-MS
12/06/2023
Filed — Alteration
replace existing air-cooled heat pump/ recovery VFR System and outdoor refrigeration system for this tenant space with new, The capacities of equipment remains the same , no change in use, egree or occupancy
M00970449-I1
07/19/2023
Signed off — Alteration
PROPOSED MECHANICAL SYSTEM INSTALLATION AT AN EXISTING EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL AND STORAGE AT CELLAR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00737234-I1
05/30/2023
Permit issued — Mechanical Systems
M00737234-I1-MS
09/27/2022
Signed off — Alteration
M00779223-I1
09/19/2022
Permit issued — Mechanical Systems
M00779223-I1-MS
09/15/2022
Filed — Alteration
M00779223-I1
08/10/2022
Special inspection requirement — Maintenance information
PATRICK MCDONALD
08/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PATRICK MCDONALD
07/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PATRICK MCDONALD
07/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
PATRICK MCDONALD
07/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
PATRICK MCDONALD
07/21/2022
Special inspection requirement — Final
PATRICK MCDONALD
07/21/2022
Special inspection requirement — Mechanical Systems
PATRICK MCDONALD
06/17/2022
Filed — Alteration
PROPOSED MECHANICAL SYSTEM INSTALLATION AT AN EXISTING EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL AND STORAGE AT CELLAR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00737234-I1
05/12/2022
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
05/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
05/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
05/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
05/12/2022
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
01/21/2022
Signed off — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND PIPES.
M00508830-I1
01/20/2022
Signed off — Alteration
EXISTING STORE RENOVATION INCLUDING MINOR CARPENTRY WORK FOR PARTITIONS WITH DOORS AND INSTALLATION OF WALK-IN COOLER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00489017-I1
12/01/2021
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY SIGN - BREAD STORY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00584063-I1
09/21/2021
Permit issued — Sign
M00584063-I1-SG
09/19/2021
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY SIGN - BREAD STORY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00584063-I1
05/05/2021
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND PIPES.
M00508830-P1
04/30/2021
Permit issued — Plumbing
M00508830-I1-PL
04/26/2021
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND PIPES.
M00508830-I1
04/14/2021
Violation issued (ECB, closed)
Unknown
03/30/2021
Permit issued — General Construction
M00489017-I1-GC
03/19/2021
Filed — Alteration
EXISTING STORE RENOVATION INCLUDING MINOR CARPENTRY WORK FOR PARTITIONS WITH DOORS AND INSTALLATION OF WALK-IN COOLER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00489017-I1
11/22/2002
Violation issued (ECB, open)
Local Law
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMETROPOLITAN MECHANICAL C09/09/2025
DOB NOWMechanical SystemsSigned-offMATTHEW GERSTUNG01/31/2024
DOB NOWMechanical SystemsSigned-offCENTAURI DEVELOPMENT INC05/30/2023
DOB NOWMechanical SystemsSigned-offMETROPOLITAN MECHANICAL C09/19/2022
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT09/21/2021
DOB NOWPlumbingSigned-offCK PLUMBING & MECH INC04/30/2021
DOB NOWGeneral ConstructionSigned-offDKT CONTRACTORS LLC03/30/2021
BISMHISSUEDSOUND REFRIGERATION & AIR06/30/2016
4 projects · most recent 12/01/2021
General Wiring Lighting
FiledStatusContractorScope
12/01/2021CompleteRAINBOW ELECTRIC CO., INC—
05/21/2021CompleteASKO ELEC CONST & MAIN INGeneral Wiring
06/22/2018CompleteWILLDAN ELECTRICAL OF NY—
03/22/2018CompleteNEW YORK EMPIRE ELECL CONLighting
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/11/2024Energy Code Compliance InspectionsSUNGBOM YIprogress
07/11/2024FinalYUNHO LEEprogress
07/11/2024HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
07/11/2024Maintenance informationSUNGBOM YIenergy_progress
07/11/2024HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
07/11/2024Shutoff dampersSUNGBOM YIenergy_progress
07/11/2024HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
07/11/2024Tenant Protection Plan ComplianceSUNGBOM YIspecial
07/11/2024Mechanical SystemsSUNGBOM YIspecial
06/24/2024Tenant Protection Plan Compliance—special
06/24/2024Mechanical SystemsSUNGBOM YIspecial
06/24/2024HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
06/24/2024Maintenance informationSUNGBOM YIenergy_progress
06/24/2024HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
06/24/2024HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
06/24/2024FinalYUNHO LEEprogress
06/24/2024Shutoff dampersSUNGBOM YIenergy_progress
06/24/2024Energy Code Compliance InspectionsSUNGBOM YIprogress
08/10/2022Maintenance informationPATRICK MCDONALDenergy_progress
08/10/2022Fire-Resistant Penetrations and JointsPATRICK MCDONALDspecial
07/22/2022HVAC-R and service water piping design and insulationPATRICK MCDONALDenergy_progress
07/22/2022HVAC-R and service water heating equipmentPATRICK MCDONALDenergy_progress
07/22/2022HVAC-R and service water heating system controlsPATRICK MCDONALDenergy_progress
07/21/2022FinalPATRICK MCDONALDprogress
07/21/2022Mechanical SystemsPATRICK MCDONALDspecial
Latest 25 of 37.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/04/2026M00489017-I1Request digital key ↗
09/03/2026M00508830-P1Request digital key ↗
09/03/2026M00508830-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/27/2016140495079Open ↗
▸BISWORK PERMIT APPLICATION1
06/27/2016140495079Open ↗
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature23
08/29/2026M00970449-P1Open ↗
08/29/2026M00970449-P1Open ↗
08/29/2026M00970449-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/04/2026M00489017-I1Open ↗
09/01/2026M00779223-I1Open ↗
08/27/2026M00970449-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026M00970449-P1Open ↗
08/28/2026M00970449-I1Open ↗
08/28/2026M00970449-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/27/2016140495079Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2016140495079Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/17/2016140495079Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2016140495079Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/17/2016140495079Open ↗
10/17/2016140495079Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/04/2026M00489017-I1Open ↗
09/01/2026M00779223-I1Open ↗
08/27/2026M00970449-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/27/2016140495079Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/27/2016140495079Open ↗
06/27/2016140495079Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/04/2026M00489017-I1Open ↗
08/13/2026M00737234-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/26/2016140495079Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/26/2016140495079Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/27/2016140495079Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00737234-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/30/2016140495079Open ↗
06/27/2016140495079Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/26/2016140495079Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/26/2016140495079Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/26/2016140495079Open ↗
06/27/2016140495079Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/27/2016140495079Open ↗