← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Stuyvesant Town-Peter Cooper Village
264 1ST AVENUE · BIN 1082872
💬 Discuss this project
1945Year Built
13Stories
D7Building Class
R7-2Zoning
8,942,176 sfGross Floor Area
8,812Units
LL97 CoveredRent Stabilized17 Active Violations 16 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: BPP St Owner · 2,675,000 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBread Story, Citibank16p · 2 filings · 20 docs
Floor 5Bread Story1p · 1 filing · 4 docs
Floor 4Bread Story1p · 1 filing · 4 docs
Floor 3Bread Story1p · 1 filing · 4 docs
Floor 2Bread Story1p · 1 filing · 4 docs
Floor 1Citibank, Bread Story +143p · 7 filings · 20 docs
CellarBread Story, Dunkin' / Baskin-Robbins30p · 3 filings · 20 docs
BasementCitibank1p · 1 filing · 3 docs
Sub-BasementCitibank1p · 1 filing · 3 docs
Site & exteriorCitibank, Dunkin' / Baskin-Robbins6p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BPP St Owner3007/08/2026
Compass Rock Real Estate603/21/2026
Ciitgroup Technology103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2015$4.1B—ST-DIL LLC → BPP St Owner$460/sf building
06/03/2014$3.3B—— → —$372/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Metropolitan Mechanical Contractors209/02/2025
SY Engineering407/01/2024
Zelta Design106/17/2022
F.p.villano Consulting Engineering109/19/2021
Clip Architects103/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX Building Consulting203/21/2026
Paul Fusco Consulting403/21/2026
Louis Striar203/21/2026
Epac Building Consulting203/21/2026
K M DOB Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Centauri DevelopmentGeneral Contractor303/21/2026
DKT ContractorsGeneral Contractor303/21/2026
Metropolitan Mechanicalspecialty_contractor207/08/2026
Red Hook Sign and ElectricSign hanger107/08/2026
Rainbow Electric CoElectrical103/22/2026
CK Plumbing & MechanicalPlumbing107/08/2026
New York Empire Electrical ConElectrical103/22/2026
Dionisos ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metropolitan Mechanical2277209/02/2025
SY Engineering5149307/01/2024
Zelta Inspection7764106/17/2022
Building Lifecycle
All (57)Filed (9)Permit Issued (7)Signed Off (7)Violation (2)Objection (2)Special Inspection (30)
05/06/2026
Signed off — Alteration
M01208000-I1
09/09/2025
Permit issued — Mechanical Systems
M01208000-I1-MS
09/02/2025
Filed — Alteration
M01208000-I1
07/23/2024
Signed off — Alteration
replace existing air-cooled heat pump/ recovery VFR System and outdoor refrigeration system for this tenant space with new, The capacities of equipment remains the same , no change in use, egree or occupancy
M00970449-I1
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
07/11/2024
Special inspection requirement — Final
YUNHO LEE
07/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
07/11/2024
Special inspection requirement — Maintenance information
SUNGBOM YI
07/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
07/11/2024
Special inspection requirement — Shutoff dampers
SUNGBOM YI
07/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
07/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
SUNGBOM YI
07/11/2024
Special inspection requirement — Mechanical Systems
SUNGBOM YI
07/10/2024
Objection resolved — Addressed
07/09/2024
Objection raised — Scope
07/01/2024
Filed — Alteration
replace existing air-cooled heat pump/ recovery VFR System and outdoor refrigeration system for this tenant space with new, The capacities of equipment remains the same , no change in use, egree or occupancy
M00970449-P1
06/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/24/2024
Special inspection requirement — Shutoff dampers
SUNGBOM YI
06/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
06/24/2024
Special inspection requirement — Maintenance information
SUNGBOM YI
06/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
06/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
06/24/2024
Special inspection requirement — Final
YUNHO LEE
06/24/2024
Special inspection requirement — Mechanical Systems
SUNGBOM YI
06/24/2024
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
01/31/2024
Permit issued — Mechanical Systems
M00970449-I1-MS
12/06/2023
Filed — Alteration
replace existing air-cooled heat pump/ recovery VFR System and outdoor refrigeration system for this tenant space with new, The capacities of equipment remains the same , no change in use, egree or occupancy
M00970449-I1
07/19/2023
Signed off — Alteration
PROPOSED MECHANICAL SYSTEM INSTALLATION AT AN EXISTING EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL AND STORAGE AT CELLAR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00737234-I1
05/30/2023
Permit issued — Mechanical Systems
M00737234-I1-MS
09/27/2022
Signed off — Alteration
M00779223-I1
09/19/2022
Permit issued — Mechanical Systems
M00779223-I1-MS
09/15/2022
Filed — Alteration
M00779223-I1
08/10/2022
Special inspection requirement — Maintenance information
PATRICK MCDONALD
08/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PATRICK MCDONALD
07/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PATRICK MCDONALD
07/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
PATRICK MCDONALD
07/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
PATRICK MCDONALD
07/21/2022
Special inspection requirement — Final
PATRICK MCDONALD
07/21/2022
Special inspection requirement — Mechanical Systems
PATRICK MCDONALD
06/17/2022
Filed — Alteration
PROPOSED MECHANICAL SYSTEM INSTALLATION AT AN EXISTING EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL AND STORAGE AT CELLAR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00737234-I1
05/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
05/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
05/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
05/12/2022
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
05/12/2022
Special inspection requirement — Final
ERIK LIEPINS
01/21/2022
Signed off — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND PIPES.
M00508830-I1
01/20/2022
Signed off — Alteration
EXISTING STORE RENOVATION INCLUDING MINOR CARPENTRY WORK FOR PARTITIONS WITH DOORS AND INSTALLATION OF WALK-IN COOLER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00489017-I1
12/01/2021
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY SIGN - BREAD STORY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00584063-I1
09/21/2021
Permit issued — Sign
M00584063-I1-SG
09/19/2021
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY SIGN - BREAD STORY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00584063-I1
05/05/2021
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND PIPES.
M00508830-P1
04/30/2021
Permit issued — Plumbing
M00508830-I1-PL
04/26/2021
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND PIPES.
M00508830-I1
04/14/2021
Violation issued (ECB, closed)
Unknown
03/30/2021
Permit issued — General Construction
M00489017-I1-GC
03/19/2021
Filed — Alteration
EXISTING STORE RENOVATION INCLUDING MINOR CARPENTRY WORK FOR PARTITIONS WITH DOORS AND INSTALLATION OF WALK-IN COOLER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00489017-I1
11/22/2002
Violation issued (ECB, open)
Local Law
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMetropolitan Mechanical09/09/2025
DOB NOWMechanical SystemsSigned-offMatthew Gerstung01/31/2024
DOB NOWMechanical SystemsSigned-offCentauri Development05/30/2023
DOB NOWMechanical SystemsSigned-offMetropolitan Mechanical09/19/2022
DOB NOWSignSigned-offRed Hook Sign and Electric09/21/2021
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical04/30/2021
DOB NOWGeneral ConstructionSigned-offDKT Contractors03/30/2021
BISMHISSUEDSound Refrigeration & Air06/30/2016
4 projects · most recent 12/01/2021
General Wiring Lighting
FiledStatusContractorScope
12/01/2021CompleteRainbow Electric Co—
05/21/2021CompleteAsko Electric Construction & MaintenanceGeneral Wiring
06/22/2018CompleteWilldan Electrical of NY—
03/22/2018CompleteNew York Empire Electrical ConLighting
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/11/2024Energy Code Compliance InspectionsSUNGBOM YIprogress
07/11/2024FinalYUNHO LEEprogress
07/11/2024HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
07/11/2024Maintenance informationSUNGBOM YIenergy_progress
07/11/2024HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
07/11/2024Shutoff dampersSUNGBOM YIenergy_progress
07/11/2024HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
07/11/2024Tenant Protection Plan ComplianceSUNGBOM YIspecial
07/11/2024Mechanical SystemsSUNGBOM YIspecial
06/24/2024Tenant Protection Plan Compliance—special
06/24/2024Shutoff dampersSUNGBOM YIenergy_progress
06/24/2024HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
06/24/2024Maintenance informationSUNGBOM YIenergy_progress
06/24/2024HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
06/24/2024HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
06/24/2024FinalYUNHO LEEprogress
06/24/2024Mechanical SystemsSUNGBOM YIspecial
06/24/2024Energy Code Compliance InspectionsSUNGBOM YIprogress
08/10/2022Maintenance informationPATRICK MCDONALDenergy_progress
08/10/2022Fire-Resistant Penetrations and JointsPATRICK MCDONALDspecial
07/22/2022HVAC-R and service water piping design and insulationPATRICK MCDONALDenergy_progress
07/22/2022HVAC-R and service water heating equipmentPATRICK MCDONALDenergy_progress
07/22/2022HVAC-R and service water heating system controlsPATRICK MCDONALDenergy_progress
07/21/2022FinalPATRICK MCDONALDprogress
07/21/2022Mechanical SystemsPATRICK MCDONALDspecial
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CitibankBank / Financial branchSub-basement, Floor 1, Roof
Project M01208000 Alteration · LOC Issued · 09/02/2025
Project M00779223 Alteration · LOC Issued · 09/15/2022
Bread StoryRestaurant / Food ServiceCellar, Floors 1–5, Roof
Project M00970449 Alteration · LOC Issued · 12/06/2023
Project M00584063 Alteration · LOC Issued · 09/19/2021
Project M00508830 Alteration · LOC Issued · 04/26/2021
Project M00489017 Alteration · LOC Issued · 03/19/2021
Dunkin' / Baskin-RobbinsRestaurant / Food ServiceCellar, Floor 1
Project M00737234 Alteration · LOC Issued · 06/17/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/04/2026M00489017-I1Request digital key ↗
09/03/2026M00508830-I1Request digital key ↗
09/03/2026M00508830-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/27/2016140495079Open ↗
▸BISWORK PERMIT APPLICATION1
06/27/2016140495079Open ↗
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature23
08/29/2026M00970449-P1Open ↗
08/29/2026M00970449-P1Open ↗
08/29/2026M00970449-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/04/2026M00489017-I1Open ↗
09/01/2026M00779223-I1Open ↗
08/27/2026M00970449-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026M00970449-P1Open ↗
08/28/2026M00970449-I1Open ↗
08/28/2026M00970449-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/27/2016140495079Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2016140495079Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/17/2016140495079Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2016140495079Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/17/2016140495079Open ↗
10/17/2016140495079Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/04/2026M00489017-I1Open ↗
09/01/2026M00779223-I1Open ↗
08/27/2026M00970449-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/27/2016140495079Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/27/2016140495079Open ↗
06/27/2016140495079Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/04/2026M00489017-I1Open ↗
08/13/2026M00737234-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/26/2016140495079Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/26/2016140495079Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/27/2016140495079Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00737234-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/30/2016140495079Open ↗
06/27/2016140495079Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/26/2016140495079Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/26/2016140495079Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/26/2016140495079Open ↗
06/27/2016140495079Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/27/2016140495079Open ↗