← Back
BuildNYC
Walk-up cooperative
Glen Oaks Village
264-31 LANGSTON AVENUE · BIN 4456623
💬 Discuss this project
1949Year Built
2Stories
C6Building Class
R3-2Zoning
61,480 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: Glen Oaks Village Owners · 166,250 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2New sunroom and private entrance on first floor9p · 1 filing · 20 docs
Floor 1New sunroom and private entrance on first floor10p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Edward C. Hicks RA204/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kataria Builders403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Custombuilt HomesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Afm Inspections & Engineering4675204/30/2024
Building Lifecycle
All (32)Filed (2)Permit Issued (1)Signed Off (1)Violation (2)Objection (6)Special Inspection (20)
08/21/2024
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR A NEW 198 SQFT SUN ROOM WITH NEW STEPS AND NEW SKYLIGHT IN THE REAR YARD. ALSO A NEW PRIVATE ENTRANCE FOR THE SECOND FLOOR ON THE FIRST FLOOR, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00566630-I1
08/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWARD HICKS
08/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Marmo
08/15/2024
Special inspection requirement — Concrete - Cast-In-Place
Anthony Marmo
08/15/2024
Special inspection requirement — Subgrade Inspections
Anthony Marmo
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Marmo
08/15/2024
Special inspection requirement — Final
ASHOKE CHAKRABORTY
08/15/2024
Special inspection requirement — Energy Code Compliance Inspections
EDWARD HICKS
08/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
EDWARD HICKS
08/15/2024
Special inspection requirement — Fenestration areas
EDWARD HICKS
08/15/2024
Special inspection requirement — Fenestration air leakage
EDWARD HICKS
08/01/2024
Objection resolved — Addressed
05/07/2024
Objection raised — Accessibility
04/30/2024
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR A NEW 198 SQFT SUN ROOM WITH NEW STEPS AND NEW SKYLIGHT IN THE REAR YARD. ALSO A NEW PRIVATE ENTRANCE FOR THE SECOND FLOOR ON THE FIRST FLOOR, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00566630-P1
04/23/2024
Special inspection requirement — Concrete - Cast-In-Place
Anthony Marmo
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Marmo
04/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Marmo
04/23/2024
Special inspection requirement — Subgrade Inspections
Anthony Marmo
04/23/2024
Special inspection requirement — Energy Code Compliance Inspections
EDWARD HICKS
04/23/2024
Special inspection requirement — Final
EDWARD HICKS
04/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
EDWARD HICKS
04/23/2024
Special inspection requirement — Fenestration areas
EDWARD HICKS
04/23/2024
Special inspection requirement — Fenestration air leakage
EDWARD HICKS
04/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWARD HICKS
02/28/2024
Violation issued (HPD, closed)
B
02/28/2024
Violation issued (HPD, closed)
B
07/26/2023
Permit issued — General Construction
Q00566630-I1-GC
09/29/2021
Objection raised — Scope
09/29/2021
Objection resolved — Addressed
09/29/2021
Objection raised — Scope
09/29/2021
Objection resolved — Addressed
09/23/2021
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR A NEW 198 SQFT SUN ROOM WITH NEW STEPS AND NEW SKYLIGHT IN THE REAR YARD. ALSO A NEW PRIVATE ENTRANCE FOR THE SECOND FLOOR ON THE FIRST FLOOR, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00566630-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCustombuilt Homes07/26/2023
1 project · most recent 10/18/2023
General Wiring
FiledStatusContractorScope
10/18/2023Permit IssuedVillage Electl ContractorsGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/15/2024Fenestration and door U-factor and product ratingsEDWARD HICKSenergy_progress
08/15/2024Structural Stability – Alterations of existing buildingsAnthony Marmospecial
08/15/2024Concrete - Cast-In-PlaceAnthony Marmospecial
08/15/2024Subgrade InspectionsAnthony Marmospecial
08/15/2024Fire-Resistant Penetrations and JointsAnthony Marmospecial
08/15/2024FinalASHOKE CHAKRABORTYprogress
08/15/2024Energy Code Compliance InspectionsEDWARD HICKSprogress
08/15/2024Fire-Resistance Rated ConstructionEDWARD HICKSprogress
08/15/2024Fenestration areasEDWARD HICKSenergy_progress
08/15/2024Fenestration air leakageEDWARD HICKSenergy_progress
04/23/2024Concrete - Cast-In-PlaceAnthony Marmospecial
04/23/2024Fire-Resistant Penetrations and JointsAnthony Marmospecial
04/23/2024Structural Stability – Alterations of existing buildingsAnthony Marmospecial
04/23/2024Subgrade InspectionsAnthony Marmospecial
04/23/2024Energy Code Compliance InspectionsEDWARD HICKSprogress
04/23/2024FinalEDWARD HICKSprogress
04/23/2024Fire-Resistance Rated ConstructionEDWARD HICKSprogress
04/23/2024Fenestration areasEDWARD HICKSenergy_progress
04/23/2024Fenestration air leakageEDWARD HICKSenergy_progress
04/23/2024Fenestration and door U-factor and product ratingsEDWARD HICKSenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026Q00566630-I1Request digital key ↗
08/15/2026Q00566630-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00566630-P1Open ↗
08/13/2026Q00566630-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWSpecial Inspector Seal & Signature8
08/29/2026Q00566630-P1Open ↗
08/29/2026Q00566630-P1Open ↗
08/29/2026Q00566630-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q00566630-P1Open ↗
08/29/2026Q00566630-P1Open ↗
08/29/2026Q00566630-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00566630-I1Open ↗
08/13/2026Q00566630-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00566630-P1Open ↗
08/13/2026Q00566630-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00566630-I1Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram2
08/13/2026Q00566630-I1Open ↗
08/13/2026Q00566630-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00566630-I1Open ↗
08/13/2026Q00566630-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00566630-I1Open ↗
08/13/2026Q00566630-P1Open ↗