← Back
BuildNYC
Miscellaneous asylum / home
Cedar Tremont
264 WEST TREMONT AVENUE · BIN 2009235
💬 Discuss this project
1908Year Built
6Stories
N9Building Class
R6Zoning
15,000 sfGross Floor Area
19Units
Rent Stabilized39 Active Violations 36 unresolved · 3 paperwork only 5 old, status unconfirmed ▸FISP: SWARMP
Miscellaneous asylum / home · Owner of record: Cedar-Tremont Housing Development Fund C Orporation · 3,666 sf lot · 4.09 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 11 filing
Cellar2 filings
Basement1 filing
Site & exterior2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Services for the Under Served1007/08/2026
Palladia603/21/2026
Cedar-Tremont Housing Development Fund C Orporation103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rosenthal202/25/2025
Eskw/Architects202/21/2025
Asr Engineering112/22/2022
Arquitectura Varela101/03/2022
M. Hamdi Gunal, PE, P112/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Light Expediting403/21/2026
CSR Expediters203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SLR Restorationspecialty_contractor407/08/2026
Aramco ContractingScaffold407/08/2026
Aramco GroupScaffold307/08/2026
SP Contractors of NYGeneral Contractor307/08/2026
Alef Electrical ContractingElectrical103/21/2026
RPJ ElectricElectrical103/21/2026
Topp Wire ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vertical8740302/25/2025
Butterfield & O'Connor4189201/03/2022
M. Hamdi Gunal, PE3000112/09/2019
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
08/13/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FOOT. THE SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00802953-I1
06/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/05/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · open
06/05/2026
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · open
268 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Aramco Group—
DOB NOW—SP Contractors of NY—
DOB NOW—Aramco Group—
DOB NOW—SP Contractors of NY—
DOB NOW—Aramco Contracting—
DOB NOW—SLR Restoration—
DOB NOW—SLR Restoration—
DOB NOW—Aramco Contracting—
BIS—Bay Restoration—
BIS—Bay Restoration—
BIS—City Gas Heating Service Co—
BIS—City Gas Heating Service Co—
BIS—Tri Borough Scaffolding—
BIS—Strategic Construction—
Nothing on file for this building.
Nothing on file for this building.
92 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account