← Back
BuildNYC
Walk-up apt, over six families with stores
2645 8TH AVENUE
MANHATTAN · BIN 1060746
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R7-2Zoning
11,738 sfGross Floor Area
10Units
Rent Stabilized0 Active Violations
Walk-up apt, over six families with stores · Owner of record: Haf Edgecombe Assoclp · 2,500 sf lot · 4.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Take-out restaurant renovation and hood installation4p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Haf Edgecombe Associates303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KDV Designs Architects403/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & Associates803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A&S Sheet Metalspecialty_contractor303/21/2026
Hydro MechanicalPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SY Engineering5149109/29/2021
Building Lifecycle
All (71)Filed (4)Permit Issued (3)Violation (53)Inspection (4)Special Inspection (7)
01/14/2026
Violation issued (HPD, closed)
B
01/14/2026
Violation issued (HPD, closed)
C
01/14/2026
Violation issued (HPD, closed)
C
01/14/2026
Violation issued (HPD, closed)
A
01/14/2026
Violation issued (HPD, closed)
B
01/14/2026
Violation issued (HPD, closed)
C
01/14/2026
Violation issued (HPD, closed)
B
09/08/2025
Violation issued (HPD, closed)
C
09/08/2025
Violation issued (HPD, closed)
C
09/08/2025
Violation issued (HPD, closed)
B
09/08/2025
Violation issued (HPD, closed)
B
09/08/2025
Violation issued (HPD, closed)
C
09/08/2025
Violation issued (HPD, closed)
A
03/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/04/2024
Permit issued — Plumbing
M00492619-S1-PL
03/12/2024
Filed — Alteration
INSTALLING NEW COMMERCIAL COOKING EQUIPMENT AND NEW PLUMBING FIXTURES IN NEW TAKE OUT RESTAURANT. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00492619-P2
09/21/2023
Permit issued — Plumbing
M00492619-S1-PL
09/12/2023
Violation issued (HPD, closed)
B
05/05/2022
Filed — Alteration
INSTALLING NEW COMMERCIAL COOKING EQUIPMENT AND NEW PLUMBING FIXTURES IN NEW TAKE OUT RESTAURANT. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00492619-P1
03/10/2022
Violation issued (ECB, closed)
Construction
02/25/2022
Violation issued (ECB, closed)
Construction
02/21/2022
Permit issued — Mechanical Systems
M00492619-I1-GC
12/20/2021
Filed — Alteration
INSTALLING NEW COMMERCIAL COOKING EQUIPMENT AND NEW PLUMBING FIXTURES IN NEW TAKE OUT RESTAURANT. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00492619-S1
09/29/2021
Filed — Alteration
INSTALLING NEW COMMERCIAL COOKING EQUIPMENT AND NEW PLUMBING FIXTURES IN NEW TAKE OUT RESTAURANT. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00492619-I1
09/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
09/15/2021
Special inspection requirement — Maintenance information
SUNGBOM YI
06/14/2021
Violation issued (HPD, closed)
B
06/14/2021
Violation issued (HPD, closed)
B
06/14/2021
Violation issued (HPD, closed)
B
06/14/2021
Violation issued (HPD, closed)
B
06/14/2021
Violation issued (HPD, closed)
B
06/14/2021
Violation issued (HPD, closed)
B
06/14/2021
Violation issued (HPD, closed)
B
06/07/2021
Violation issued (HPD, closed)
C
03/25/2021
Special inspection requirement — Final
DAVIDSON CHRISTMAS
03/25/2021
Special inspection requirement — Duct leakage testing, insulation and design
SUNGBOM YI
03/25/2021
Special inspection requirement — Electrical motors and elevators
SUNGBOM YI
03/25/2021
Special inspection requirement — Energy Code Compliance Inspections
DAVIDSON CHRISTMAS
03/25/2021
Special inspection requirement — Mechanical Systems
SUNGBOM YI
12/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/13/2020
Violation issued (ECB, closed)
Construction
09/23/2020
Violation issued (ECB, closed)
Construction
09/10/2020
Violation issued (ECB, closed)
Construction
07/30/2020
Violation issued (HPD, closed)
C
07/30/2020
Violation issued (HPD, closed)
B
06/01/2020
Violation issued (HPD, closed)
C
06/01/2020
Violation issued (HPD, closed)
B
06/01/2020
Violation issued (HPD, closed)
A
06/01/2020
Violation issued (HPD, closed)
B
06/01/2020
Violation issued (HPD, closed)
B
06/01/2020
Violation issued (HPD, closed)
B
06/01/2020
Violation issued (HPD, closed)
B
07/18/2017
Violation issued (HPD, closed)
C
07/18/2017
Violation issued (HPD, closed)
A
07/18/2017
Violation issued (HPD, closed)
A
07/18/2017
Violation issued (HPD, closed)
C
07/11/2017
Violation issued (HPD, closed)
C
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHydro Mechanical10/04/2024
DOB NOWPlumbingSigned-offHydro Mechanical09/21/2023
DOB NOWMechanical SystemsPermit IssuedA&S Sheet Metal02/21/2022
BIS—ISSUEDHaf Development12/01/1993
BIS—ISSUEDNCM Construction04/21/1993
BIS—ISSUEDNCM Construction07/24/1992
1 project · most recent 03/12/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/12/2024Permit IssuedA&S Sheet MetalVentilation Systems
Ventilation
Captiveaire MODEL # NCA18HPFA 2,400 CFM · Kitchen Exhaust ×3
1 project · most recent 03/12/2024
Gas Water/Sanitary
FiledStatusContractorScope
03/12/2024Signed-offHydro MechanicalGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/15/2021Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
09/15/2021Maintenance informationSUNGBOM YIenergy_progress
03/25/2021FinalDAVIDSON CHRISTMASprogress
03/25/2021Duct leakage testing, insulation and designSUNGBOM YIenergy_progress
03/25/2021Electrical motors and elevatorsSUNGBOM YIenergy_progress
03/25/2021Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
03/25/2021Mechanical SystemsSUNGBOM YIspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00492619-I1Request digital key ↗
09/03/2026M00492619-P1Request digital key ↗
09/03/2026M00492619-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026M00492619-I1Open ↗
08/25/2026M00492619-I1Open ↗
08/25/2026M00492619-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00492619-P1Open ↗
09/03/2026M00492619-S1Open ↗
09/03/2026M00492619-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026M00492619-I1Open ↗
08/25/2026M00492619-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00492619-S1Open ↗
09/03/2026M00492619-I1Open ↗
09/03/2026M00492619-P2Open ↗
Showing 3 of 4 on file for this type