3 Open Violations 0 unresolved · 3 paperwork only▸
ECB03/15/2007FAILURE TO COMPLY W/AN ORDER OF THE DEPT TO CORRECT VIO #34537377L FORWORK W/O PERMIT IN THE CELLAR INSTALLED WALLS & 3PC BATHROOM & ROOMS W/O PERMIT.REMEDY:COMPLY WITH DEPARTMENT ORDER & OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB11/29/2006OCCUPANCY CONTRARY TO THAT ALLOWED BY THE BLDG DEPT RECORDS-HAZARDOUS.NOTED:FROM:LEGAL OCCUPANCY @ CELLAR LEVEL AS A BOILER RM,STORAGE SPACETO:ILLEGAL APT @ CELLAR(REAR)W/ENTRY DOOR NEXT TO BOILER RM,1 OPEN RMNothing owed — awaiting certificate of correction
ECB11/29/2006WORK W/O A PERMIT-HAZARDOUS.WORK NOTED:ERECTED SHEETROCK PARTITIONS SUBDIVIDING CELLAR LEVEL & CREATING 1 OPEN BDRM,3PC BTHRM(SHOWER STALL,SINK,WATER CLOSET),STORAGE CLOSETS, W/ENTRY DOOR(NEXT TO BOILER RM)Nothing owed — awaiting certificate of correction
Two family brick · 3,640 sf lot · 0.84 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.